Olympeo Riverside

Certificate Signed

Awsare, Raigarh 410101 |Promoter: Olympeo Riverside Projects LLP

31 Jul 2017Registered with MahaRERAFirst of 2 registrations
30 Jun 2023Promised completionLatest across registrations
31 Dec 2028Revised completion1 of 2 registrations pushed back, by up to 5 years and 6 months
13Buildings2 phases
640Units registered413 booked (65%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
RERA registrations
2
Phases
2
Buildings
13
Unit types
1BHK, 2BHK LB, 2BHK SB, 1BHK LB, 1BHK SB, 2BHK, 3BHK, Smart 1BHK, 0640 units in all
Address
38/1, 39/2, 39/4A/1, 39/4A/2, 39/5, 39/6, 39/7, 39/8, 39/9, 39/16, 41, 42/1, 43/1/1, 43/1D, 43/1E, Awsare, NeralPIN 410101
Designated bank account
220
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.07196, 73.33032
Olympeo Riverside is at latitude 19.07196, longitude 73.33032.

Also registered as

Olympeo Riverside - Phase 3Olympeo Riverside - Phase 1

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2018

P52000002351

The latest completion date on record passed 8 years and 4 months ago.

Registered
31 Jul 2017
Promised
30 Jun 2018

Completion pushed back 5 years and 6 months

P52000012184
Registered
1 Sep 2017
Promised
30 Jun 2023
Revised
31 Dec 2028

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200000235131 Jul 201730 Jun 201830 Jun 2018Olympeo Riverside Projects LLPProject page
P520000121841 Sep 201730 Jun 202331 Dec 2028Olympeo Riverside Projects LLPProject page

13 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A1540
A2540
A3540
A4540
B1540
B2540
B3540
C3860
Show all 13 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
C4860
C5860
C6860
C7860
C8860

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

413 of 640 units booked (65%), as the promoter reported to MahaRERA

1BHK · 236 units2BHK LB · 80 units2BHK SB · 72 units1BHK LB · 60 units1BHK SB · 60 units2BHK · 96 units3BHK · 12 unitsSmart 1BHK · 24 units0 · 0 units
RERABuildingTypeCarpet areaUnitsBooked
P52000002351A11BHK36.7 sq m · 395 sq ft22
P52000002351A12BHK LB44.41 sq m · 478 sq ft2015
P52000002351A12BHK SB44.41 sq m · 478 sq ft1815
P52000002351A21BHK36.7 sq m · 395 sq ft22
P52000002351A22BHK LB44.41 sq m · 478 sq ft206
P52000002351A22BHK SB44.41 sq m · 478 sq ft1811
P52000002351A31BHK36.7 sq m · 395 sq ft22
P52000002351A32BHK LB44.41 sq m · 478 sq ft2020
Show all 55 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P52000002351A32BHK SB44.41 sq m · 478 sq ft1818
P52000002351A41BHK36.7 sq m · 395 sq ft22
P52000002351A42BHK LB44.41 sq m · 478 sq ft2012
P52000002351A42BHK SB44.41 sq m · 478 sq ft1811
P52000002351B11BHK LB28.99 sq m · 312 sq ft2016
P52000002351B11BHK SB28.99 sq m · 312 sq ft2016
P52000002351B21BHK LB28.99 sq m · 312 sq ft2016
P52000002351B21BHK SB28.99 sq m · 312 sq ft2017
P52000002351B31BHK LB28.99 sq m · 312 sq ft2019
P52000002351B31BHK SB28.99 sq m · 312 sq ft2017
P52000012184C31BHK31 sq m · 334 sq ft149
P52000012184C31BHK34.07 sq m · 367 sq ft168
P52000012184C32BHK42.25 sq m · 455 sq ft22
P52000012184C32BHK46.83 sq m · 504 sq ft1411
P52000012184C33BHK58.08 sq m · 625 sq ft22
P52000012184C3Smart 1BHK21.89 sq m · 236 sq ft1212
P52000012184C41BHK31 sq m · 334 sq ft1414
P52000012184C41BHK34.07 sq m · 367 sq ft1615
P52000012184C42BHK42.25 sq m · 455 sq ft22
P52000012184C42BHK46.83 sq m · 504 sq ft1414
P52000012184C43BHK58.08 sq m · 625 sq ft22
P52000012184C4Smart 1BHK21.89 sq m · 236 sq ft1210
P52000012184C51BHK21.89 sq m · 236 sq ft1211
P52000012184C51BHK31 sq m · 334 sq ft1411
P52000012184C51BHK34.07 sq m · 367 sq ft161
P52000012184C52BHK42.25 sq m · 455 sq ft22
P52000012184C52BHK46.83 sq m · 504 sq ft1410
P52000012184C53BHK58.08 sq m · 625 sq ft22
P52000012184C61BHK21.89 sq m · 236 sq ft128
P52000012184C61BHK31 sq m · 334 sq ft147
P52000012184C61BHK34.07 sq m · 367 sq ft163
P52000012184C62BHK42.25 sq m · 455 sq ft21
P52000012184C62BHK46.83 sq m · 504 sq ft148
P52000012184C63BHK58.08 sq m · 625 sq ft22
P52000012184C71BHK21.89 sq m · 236 sq ft127
P52000012184C71BHK31 sq m · 334 sq ft145
P52000012184C71BHK34.07 sq m · 367 sq ft160
P52000012184C72BHK42.25 sq m · 455 sq ft20
P52000012184C72BHK46.83 sq m · 504 sq ft143
P52000012184C73BHK58.08 sq m · 625 sq ft22
P52000012184C81BHK21.89 sq m · 236 sq ft120
P52000012184C81BHK31 sq m · 334 sq ft146
P52000012184C81BHK34.07 sq m · 367 sq ft163
P52000012184C82BHK42.25 sq m · 455 sq ft21
P52000012184C82BHK46.83 sq m · 504 sq ft141
P52000012184C83BHK58.08 sq m · 625 sq ft21
P52000012184—0—00

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

3 documents held by Deedo, 200 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52000002351 · 31 Jul 2017ViewSource
  • Registration certificateP52000012184 · 13 Apr 2023ViewSource

Extension certificate

  • Extension certificateP52000012184 · 12 Mar 2025ViewSource

Finance

  • PAN CardP52000002351 · Pan card - ORPLLP.pdf · uploaded 7 Jul 2017Source
  • PAN CardP52000012184 · Pan card - ORPLLP.pdf · uploaded 7 Jul 2017Source

Legal

  • Legal Title reportP52000002351 · Dsk Legal December 20,2014.pdf · uploaded 7 Jul 2017Source
  • Declaration Form BP52000002351 · Form B - Phase 1.pdf · uploaded 7 Jul 2017Source
  • Legal Title reportP52000012184 · Dsk Legal December 20,2014.pdf · uploaded 7 Jul 2017Source
Show all 203 documentsShow fewer documents

Legal

  • Declaration Form BP52000012184 · Form B - Phase 3.pdf · uploaded 12 Jul 2017Source
  • Declaration Form BP52000012184 · FORM B - Olympeo Riverside.pdf · uploaded 10 Feb 2025Source

Migrated

  • 1 PAN CardP52000002351 · Pan card - ORPLLP.pdf · uploaded 7 Jul 2017Source
  • 1 Copy of the legal title reportP52000002351 · Dsk Legal December 20,2014.pdf · uploaded 7 Jul 2017Source
  • 1 Details of encumbrancesP52000002351 · Encumbrance Certificate - Phase 1.pdf · uploaded 7 Jul 2017Source
  • 1 Building Plan Approval (IOD)P52000002351 · NA-ORDER-07-11-2015-1-3.pdf · uploaded 7 Jul 2017Source
  • 2 Building Plan Approval (IOD)P52000002351 · NA-ORDER-07-11-2015-4-6.pdf · uploaded 7 Jul 2017Source
  • 1 Declaration in FORM BP52000002351 · Form B - Phase 1.pdf · uploaded 7 Jul 2017Source
  • 1 PAN CardP52000012184 · Pan card - ORPLLP.pdf · uploaded 7 Jul 2017Source
  • 1 Copy of the legal title reportP52000012184 · Dsk Legal December 20,2014.pdf · uploaded 7 Jul 2017Source
  • 1 Details of encumbrancesP52000012184 · Encumbrance Certificate - Phase 3.pdf · uploaded 7 Jul 2017Source
  • 1 Building Plan Approval (IOD)P52000012184 · NA-ORDER-07-11-2015-1-3.pdf · uploaded 7 Jul 2017Source
  • 2 Building Plan Approval (IOD)P52000012184 · NA-ORDER-07-11-2015-4-6.pdf · uploaded 7 Jul 2017Source
  • 1 Declaration in FORM BP52000012184 · Form B - Phase 3.pdf · uploaded 12 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000002351 · Phase 1.pdf · uploaded 18 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Phase 3.pdf · uploaded 18 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)P52000002351 · Approval Drawings.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000002351 · Phase 1.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of CA (Form 3)P52000002351 · Phase 1 Signed Scan copy-compressed.pdf · uploaded 21 Jul 2017Source
  • 1 Proforma of Allotment letterP52000002351 · Phase 1.pdf · uploaded 21 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)P52000012184 · Approval Drawings.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Phase 3.pdf · uploaded 21 Jul 2017Source
  • 1 Proforma of Allotment letterP52000012184 · Phase 3.pdf · uploaded 21 Jul 2017Source
  • 1 Certificates of CA (Form 3)P52000012184 · Phase 3 Signed Scan copy-compressed.pdf · uploaded 22 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000002351 · Architects Certificate Phase 1.pdf · uploaded 16 Nov 2017Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000002351 · Vishal Kumar (Engineers Certificate) 1-compressed.pdf · uploaded 16 Nov 2017Source
  • 2 Certificates of CA (Form 3)P52000002351 · phase 1.pdf · uploaded 16 Nov 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Architects Certificate Phase 1.pdf · uploaded 16 Nov 2017Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Vishal Kumar (Engineers Certificate) 3-compressed.pdf · uploaded 16 Nov 2017Source
  • 2 Certificates of CA (Form 3)P52000012184 · phase 3.pdf · uploaded 16 Nov 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52000002351 · NA-ORDER-07-11-2015-1-3.pdf · uploaded 28 Mar 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52000002351 · NA-ORDER-07-11-2015-4-6.pdf · uploaded 28 Mar 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentP52000002351 · Grampanchyat-NOC-1-5.pdf · uploaded 28 Mar 2018Source
  • 4 Commencement Certificates / NA Order for plotted developmentP52000002351 · Grampanchyat-NOC-6-10.pdf · uploaded 28 Mar 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52000012184 · NA-ORDER-07-11-2015-1-3.pdf · uploaded 28 Mar 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52000012184 · NA-ORDER-07-11-2015-4-6.pdf · uploaded 28 Mar 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentP52000012184 · Grampanchyat-NOC-1-5.pdf · uploaded 28 Mar 2018Source
  • 4 Commencement Certificates / NA Order for plotted developmentP52000012184 · Grampanchyat-NOC-6-10.pdf · uploaded 28 Mar 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000002351 · Architect Certificate - Phase 1.pdf · uploaded 31 May 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000002351 · Engineer Certificate - Phase 1.pdf · uploaded 31 May 2018Source
  • 3 Certificates of CA (Form 3)P52000002351 · Olympeo Riverside Project LLP-Phase-I-ilovepdf-compressed (1).pdf · uploaded 31 May 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Architect Certificate - Phase 3.pdf · uploaded 31 May 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Engineer Certificate - Phase 3.pdf · uploaded 31 May 2018Source
  • 3 Certificates of CA (Form 3)P52000012184 · Olympeo Riverside Project LLP-Phase-III-ilovepdf-compressed.pdf · uploaded 31 May 2018Source
  • 1 Certificates of Architect (Form 4)P52000002351 · Form-4---Phase-1-1-2.pdf · uploaded 16 Oct 2018Source
  • 2 Certificates of Architect (Form 4)P52000002351 · Form-4---Phase-1-3-4.pdf · uploaded 16 Oct 2018Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52000002351 · CERTIFICATE OF INCORPORATION.PDF · uploaded 16 Oct 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000002351 · FORM 1 ( Architects Certificate ) Phase 1-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000002351 · FORM 1 ( Architects Certificate ) Phase 1-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000002351 · Form---2-(-Vishal-Kumar-).pdf · uploaded 23 Oct 2018Source
  • 4 Certificates of CA (Form 3)P52000002351 · Signed-Rera-Certificate-Phase-I-1-3.pdf · uploaded 23 Oct 2018Source
  • 5 Certificates of CA (Form 3)P52000002351 · Signed-Rera-Certificate-Phase-I-4-6-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 6 Certificates of CA (Form 3)P52000002351 · Signed-Rera-Certificate-Phase-I-7-9-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 7 Certificates of CA (Form 3)P52000002351 · Signed-Rera-Certificate-Phase-I-10-11.pdf · uploaded 23 Oct 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · FORM 1 ( Architects Certificate ) Phase 3-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · FORM 1 ( Architects Certificate ) Phase 3-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Form---2-(-Vishal-Kumar-)-3.pdf · uploaded 23 Oct 2018Source
  • 4 Certificates of CA (Form 3)P52000012184 · Signed-Rera-Certificate-Phase-III-1-3.pdf · uploaded 23 Oct 2018Source
  • 5 Certificates of CA (Form 3)P52000012184 · Signed-Rera-Certificate-Phase-III-4-6.pdf · uploaded 23 Oct 2018Source
  • 6 Certificates of CA (Form 3)P52000012184 · Signed-Rera-Certificate-Phase-III-7-9-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • 7 Certificates of CA (Form 3)P52000012184 · Signed-Rera-Certificate-Phase-III-10-11.pdf · uploaded 23 Oct 2018Source
  • 2 Details of encumbrancesP52000002351 · Phase 1_Encumbrance Certificate.pdf · uploaded 31 Dec 2018Source
  • 2 Details of encumbrancesP52000012184 · Phase 3_Encumbrance Certificate.pdf · uploaded 31 Dec 2018Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Architect Certificate_Phase 3_Sep 18.pdf · uploaded 15 Apr 2019Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Architect Certificate_Phase 3_Dec 18.pdf · uploaded 15 Apr 2019Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Architect Certificate_Phase 3_Mar 19.pdf · uploaded 15 Apr 2019Source
  • 3 Certificates of Architect (Form 4)P52000002351 · Form 4.pdf · uploaded 8 Jun 2019Source
  • 4 Certificates of Architect (Form 4)P52000002351 · O C Letter (Orignal ) Phase - 1.pdf · uploaded 8 Jun 2019Source
  • 1 Certificates of CA (Form 5)P52000002351 · Phase-I.pdf · uploaded 9 Jul 2019Source
  • 1 Certificates of CA (Form 5)P52000012184 · Phase_III.pdf · uploaded 9 Jul 2019Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)P52000002351 · CERTIFICATE OF INCORPORATION.PDF · uploaded 24 Aug 2021Source
  • 1 b Details of encumbrances concerned to LegalP52000012184 · Encumbrance Certificate - Phase 3.pdf · uploaded 19 Aug 2022Source
  • 1 Declaration about Commencement CertificateP52000012184 · CC Declaration-1.pdf · uploaded 19 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52000012184 · Signed Audit Report OLympeo River.pdf · uploaded 19 Aug 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52000012184 · Signed Financial Statement Olympeo River_compressed-1-6.pdf · uploaded 19 Aug 2022Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52000012184 · Signed Financial Statement Olympeo River_compressed-7-12.pdf · uploaded 19 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52000012184 · olympeo riverside projects llp 19-20_compressed-1-7.pdf · uploaded 19 Aug 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52000012184 · olympeo riverside projects llp 19-20_compressed-8-14.pdf · uploaded 19 Aug 2022Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52000012184 · olympeo riverside projects llp 19-20_compressed-15-19.pdf · uploaded 19 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52000012184 · Riverside_Audited Financials 20-21_compressed-1-5.pdf · uploaded 19 Aug 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52000012184 · Riverside_Audited Financials 20-21_compressed-6-10.pdf · uploaded 19 Aug 2022Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52000012184 · Riverside_Audited Financials 20-21_compressed-11-15.pdf · uploaded 19 Aug 2022Source
  • 4 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52000012184 · Riverside_Audited Financials 20-21_compressed-16-20.pdf · uploaded 19 Aug 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52000012184 · Quality Certificate 2019-20.pdf · uploaded 8 Sep 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52000012184 · Quality Certificate 2020-21.pdf · uploaded 8 Sep 2022Source
  • 1 CERSAI detailsP52000012184 · Asset Based Search 1.pdf · uploaded 8 Sep 2022Source
  • 2 CERSAI detailsP52000012184 · CERSAI_Search_Report_200246671922_For_Asset_Based_Search_08_09_2022_14_51_52_385.pdf · uploaded 8 Sep 2022Source
  • 1 Disclosure of sold/ booked inventoryP52000012184 · Disclosure on sold units_compressed.pdf · uploaded 8 Sep 2022Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Adobe Scan 25-Feb-2023 (1)-1-3.pdf · uploaded 25 Feb 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Adobe Scan 25-Feb-2023 (1)-4-5.pdf · uploaded 25 Feb 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Phase 3 Engineers Certificate 31 12 2022-1-2.pdf · uploaded 25 Feb 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Phase 3 Engineers Certificate 31 12 2022-3-4.pdf · uploaded 25 Feb 2023Source
  • 2 Certificates of CA (Form 5)P52000012184 · Signed Form 5_2018-19.pdf · uploaded 25 Feb 2023Source
  • 3 Certificates of CA (Form 5)P52000012184 · Signed Form 5_2019-20.pdf · uploaded 25 Feb 2023Source
  • 4 Certificates of CA (Form 5)P52000012184 · Signed Form 5_2020-21.pdf · uploaded 25 Feb 2023Source
  • 5 Certificates of CA (Form 5)P52000012184 · Signed Form 5_2021-22.pdf · uploaded 25 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · certificate by the auditor.pdf · uploaded 25 Feb 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · independent auditors.pdf · uploaded 25 Feb 2023Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · PRIZTINE INFRA LLP STATEMENT-1-4.pdf · uploaded 25 Feb 2023Source
  • 4 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · PRIZTINE INFRA LLP STATEMENT-5-8.pdf · uploaded 25 Feb 2023Source
  • 5 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · PRIZTINE INFRA LLP STATEMENT-9-11.pdf · uploaded 25 Feb 2023Source
  • 6 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · PRIZTINE INFRA LLP STATEMENT-12-13.pdf · uploaded 25 Feb 2023Source
  • 7 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · certificate by the auditors.pdf · uploaded 25 Feb 2023Source
  • 8 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · independent auditors report ORPLLP.pdf · uploaded 25 Feb 2023Source
  • 9 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · ORPLL Audit report 2022-1-4.pdf · uploaded 25 Feb 2023Source
  • 10 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · ORPLL Audit report 2022-5-8.pdf · uploaded 25 Feb 2023Source
  • 11 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · ORPLL Audit report 2022-9-11.pdf · uploaded 25 Feb 2023Source
  • 12 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · ORPLL Audit report 2022-12-14.pdf · uploaded 25 Feb 2023Source
  • 13 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · ORPLL Audit report 2022-15-16.pdf · uploaded 25 Feb 2023Source
  • 1 Proforma of Agreement for saleP52000012184 · Phase 3.pdf · uploaded 25 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52000012184 · QC_2021-22.pdf · uploaded 27 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52000012184 · Quality Certificate 2022-23.pdf · uploaded 3 Jul 2023Source
  • 2 Disclosure of sold/ booked inventoryP52000012184 · Disclosure.pdf · uploaded 3 Jul 2023Source
  • 14 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52000012184 · 2021-22_Signed.pdf · uploaded 3 Jul 2023Source
  • 2 a Details of encumbrances concerned to FinanceP52000012184 · Legal Encumbrance.pdf · uploaded 17 Oct 2024Source
  • 3 a Details of encumbrances concerned to FinanceP52000012184 · Finance Encumbrance.pdf · uploaded 17 Oct 2024Source
  • 1 Details of encumbrancesP52000012184 · Finance Encumbrance.pdf · uploaded 17 Oct 2024Source
  • 1 Proforma of Allotment letterP52000012184 · Model Allotment Letter.pdf · uploaded 17 Oct 2024Source
  • 2 Certificates of CA (Form 3)P52000012184 · Form 3_Mar 24_compressed.pdf · uploaded 17 Oct 2024Source
  • 3 Certificates of CA (Form 3)P52000012184 · Form 3_Mar 24_compressed (1).pdf · uploaded 17 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52000012184 · Disclosure of Sold Inventory_compressed.pdf · uploaded 17 Oct 2024Source
  • 1 b Details of encumbrances concerned to LegalP52000012184 · Legal Encumbrance.pdf · uploaded 17 Oct 2024Source
  • 2 b Details of encumbrances concerned to LegalP52000012184 · Finance Encumbrance.pdf · uploaded 17 Oct 2024Source
  • 1 Deviation Report with respect to model copy of AgreementP52000012184 · Deviation Letter.pdf · uploaded 17 Oct 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52000012184 · Other Real Estate.pdf · uploaded 17 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52000012184 · Form 5_2022-23.pdf · uploaded 17 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52000012184 · Form 2A Quality Certificate.pdf · uploaded 17 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52000012184 · Form 5_2023-24.pdf · uploaded 17 Oct 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Riverside Phase 3 Architect Certificate Mar 24_compressed.pdf · uploaded 9 Nov 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Riverside Phase 3 Architect Certificate June 2024_compressed.pdf · uploaded 9 Nov 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Riverside Phase 3 Engineer Certificate Mar 24_compressed.pdf · uploaded 9 Nov 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Riverside Phase 3 Engineer Certificate Phase 3 June 2024_compressed.pdf · uploaded 9 Nov 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Form 1 - June 24.pdf · uploaded 10 Dec 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52000012184 · Form 1 - Sep 24_compressed.pdf · uploaded 10 Dec 2024Source
  • 4 Certificates of CA (Form 3)P52000012184 · Form 3 - June 24_compressed.pdf · uploaded 10 Dec 2024Source
  • 5 Certificates of CA (Form 3)P52000012184 · Form 3 - Sep 24_compressed.pdf · uploaded 10 Dec 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Form 2 - Sep 24.pdf · uploaded 10 Dec 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52000012184 · Form 2 - June 24.pdf · uploaded 10 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryP52000012184 · Sold Booked - June 24_compressed.pdf · uploaded 10 Dec 2024Source
  • 3 Disclosure of sold/ booked inventoryP52000012184 · Sold Booked - Sep 24_compressed.pdf · uploaded 10 Dec 2024Source
  • 1 Declaration in FORM BP52000012184 · FORM B - Olympeo Riverside.pdf · uploaded 10 Feb 2025Source
  • 1 Certificates of CA (Form 3)P52000012184 · Signed Form 3 - Olympeo Riverside (1)_compressed.pdf · uploaded 10 Feb 2025Source
  • Form 1P52000012184 · FORM 1 MARCH 2024.pdf · uploaded 29 Jul 2025Source
  • Form 2P52000012184 · FORM 2 MARCH 2024.pdf · uploaded 29 Jul 2025Source
  • Form 3P52000012184 · FORM 3 MARCH 2024.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52000012184 · SOLD UNSOLD MARCH 2024.pdf · uploaded 29 Jul 2025Source
  • Form 1P52000012184 · FORM 1 JUNE 2024.pdf · uploaded 29 Jul 2025Source
  • Form 2P52000012184 · FORM 2 JUNE 2024 RIVER.pdf · uploaded 29 Jul 2025Source
  • Form 3P52000012184 · FORM 3 JUNE 2024.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52000012184 · SOLD UNSOLD JUNE 2024.pdf · uploaded 29 Jul 2025Source
  • Form 1P52000012184 · FORM 1 SEPT 2024.pdf · uploaded 29 Jul 2025Source
  • Form 2P52000012184 · FORM 2 SEPT 2024 RIVER.pdf · uploaded 29 Jul 2025Source
  • Form 3P52000012184 · FORM 3 SEPT 2024.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52000012184 · SOLD UNSOLD SEPT 2024.pdf · uploaded 29 Jul 2025Source
  • Form 1P52000012184 · FORM 1 DEC 2024.pdf · uploaded 29 Jul 2025Source
  • Form 2P52000012184 · FORM 2 DEC 2024 RIVER.pdf · uploaded 29 Jul 2025Source
  • Form 3P52000012184 · FORM 3 DEC 2024.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52000012184 · SOLD UNSOLD DEC 2024 (1).pdf · uploaded 29 Jul 2025Source
  • Form 1P52000012184 · FORM 1 MARCH 2025.pdf · uploaded 29 Jul 2025Source
  • Form 2P52000012184 · FORM 2 MARCH 2025 RIVER.pdf · uploaded 29 Jul 2025Source
  • Form 3P52000012184 · FORM 3 MARCH 2025.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52000012184 · SOLD UNSOLD MARCH 2025 (1).pdf · uploaded 29 Jul 2025Source
  • Withdrawal Update Form 1P52000012184 · FORM 1 JUNE 2025.pdf · uploaded 4 Sep 2025Source
  • Withdrawal Update Form 2P52000012184 · FORM 2 JUNE 2025.pdf · uploaded 4 Sep 2025Source
  • Withdrawal Update Form 3P52000012184 · FORM 3 JUNE 2025_144dpi_75%.pdf · uploaded 4 Sep 2025Source
  • Withdrawal Update Form 1P52000012184 · Form 1_Sep 25.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 2P52000012184 · Form 2_Sep 25.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 3P52000012184 · Form 3_Sep 25.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 1P52000012184 · Form 1 Riverside Phase III Dec 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2P52000012184 · Form 2 Riverside Phase III Dec 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3P52000012184 · CA Certificate-Riverside Phase III_Dec 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1P52000012184 · Form 1_Mar 2026.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 2P52000012184 · Form 2_Mar 2026.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 3P52000012184 · Form 3_Mar 2026.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1P52000012184 · Form 1_June 26.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 2P52000012184 · Form 2_Jun 26.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 3P52000012184 · CA Certificate_Jun 26.pdf · uploaded 29 Jul 2026Source

Technical

  • DocumentP52000002351 · NA-ORDER-07-11-2015-1-3.pdf · uploaded 7 Jul 2017Source
  • DocumentP52000002351 · NA-ORDER-07-11-2015-4-6.pdf · uploaded 7 Jul 2017Source
  • DocumentP52000012184 · NA-ORDER-07-11-2015-1-3.pdf · uploaded 7 Jul 2017Source
  • DocumentP52000012184 · NA-ORDER-07-11-2015-4-6.pdf · uploaded 7 Jul 2017Source
  • DocumentP52000002351 · Approval Drawings.pdf · uploaded 21 Jul 2017Source
  • DocumentP52000012184 · Approval Drawings.pdf · uploaded 21 Jul 2017Source

Technical (Architect)

  • DocumentP52000002351 · FORM 1 ( Architects Certificate ) Phase 1-ilovepdf-compressed.pdf · uploaded 23 Oct 2018Source
  • DocumentP52000012184 · Riverside Phase 3 Architect Certificate Mar 24_compressed.pdf · uploaded 9 Nov 2024Source
  • DocumentP52000012184 · Riverside Phase 3 Architect Certificate June 2024_compressed.pdf · uploaded 9 Nov 2024Source
  • DocumentP52000012184 · Form 1 - June 24.pdf · uploaded 10 Dec 2024Source
  • DocumentP52000012184 · Form 1 - Sep 24_compressed.pdf · uploaded 10 Dec 2024Source
  • DocumentP52000012184 · Form 1_June 26.pdf · uploaded 29 Jul 2026Source

Technical (Engineer)

  • DocumentP52000002351 · Form---2-(-Vishal-Kumar-).pdf · uploaded 23 Oct 2018Source
  • DocumentP52000012184 · Riverside Phase 3 Engineer Certificate Mar 24_compressed.pdf · uploaded 9 Nov 2024Source
  • DocumentP52000012184 · Riverside Phase 3 Engineer Certificate Phase 3 June 2024_compressed.pdf · uploaded 9 Nov 2024Source
  • DocumentP52000012184 · Form 2 - June 24.pdf · uploaded 10 Dec 2024Source
  • DocumentP52000012184 · Form 2 - Sep 24.pdf · uploaded 10 Dec 2024Source
  • DocumentP52000012184 · Form 2_Jun 26.pdf · uploaded 29 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In awsare, Karjat taluka

Survey, CTS, gat or plot numbers

38/139/1639/239/4A/139/4A/239/539/639/739/839/94142/143/1/143/1D43/1E48/10A/148/9

Boundaries

North
Mohili Village
South
Birdole Village
East
Avsare Village
West
Ulhas River and Shelu Village

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectArchitect Vivek Kumar—P52000002351
ArchitectArunkumar Govind Giri—P52000012184
ArchitectSakshi Vinayak Khanorkar—P52000012184
Chartered accountantDeepika Chandak—P52000012184
EngineerEngineering Creations Consultancy Pvt Ltd—P52000002351
EngineerPrabhat Ranjan—P52000012184
OtherArchitect Hafeez Contractor—P52000002351
OtherEngineering Creations Public Health Consultancy Pvt Ltd—P52000002351
Show all 13 professionalsShow fewer professionals
RoleNameRegistration no.RERA
OtherPinnacle Infraheights Pvt Ltd—P52000002351
Registered real estate agentAbhijiit Ashwin Tayade—P52000002351
Registered real estate agentAlok Rajendra Prasad Singh—P52000002351
Registered real estate agentMohammed Akram Idris Khan—P52000002351
Registered real estate agentRakesh Nandkishor Gupta—P52000002351

Source: MahaRERA project page. Contact details are not shown.