Skip to content

Up-Life-Phase-2-Emerald

Certificate Signed

Uravade, Pune 412108 |Promoter: Avior Shelters LLP

Residential / Group HousingRERAP52100024865
9 Mar 2020Registered with MahaRERA
31 Dec 2029Promised completion
1Building
50Units registered8 booked (16%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK, 3BHK, 4BHK50 units in all
Address
431PIN 412108
Designated bank account
76
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.49354, 73.67173
Up-Life-Phase-2-Emerald is at latitude 18.49354, longitude 73.67173.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2029

Registered
9 Mar 2020
Promised
31 Dec 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000248659 Mar 202031 Dec 202931 Dec 2029Avior Shelters LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building R2 -Wing -B2, B4,d1450

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

8 of 50 units booked (16%), as the promoter reported to MahaRERA

2BHK · 47 units3BHK · 2 units4BHK · 1 unit
TypeCarpet areaUnitsBooked
2BHK64.53 sq m · 695 sq ft20
2BHK67.05 sq m · 722 sq ft21
2BHK67.23 sq m · 724 sq ft11
2BHK67.24 sq m · 724 sq ft10
2BHK67.41 sq m · 726 sq ft84
2BHK67.74 sq m · 729 sq ft10
2BHK67.91 sq m · 731 sq ft11
2BHK67.93 sq m · 731 sq ft10
Show all 31 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK67.94 sq m · 731 sq ft10
2BHK68.09 sq m · 733 sq ft10
2BHK68.15 sq m · 734 sq ft10
2BHK68.16 sq m · 734 sq ft10
2BHK68.27 sq m · 735 sq ft40
2BHK68.51 sq m · 737 sq ft40
2BHK68.84 sq m · 741 sq ft10
2BHK69.01 sq m · 743 sq ft10
2BHK69.08 sq m · 744 sq ft10
2BHK69.2 sq m · 745 sq ft10
2BHK70.49 sq m · 759 sq ft21
2BHK70.65 sq m · 760 sq ft10
2BHK70.71 sq m · 761 sq ft20
2BHK70.9 sq m · 763 sq ft10
2BHK70.91 sq m · 763 sq ft20
2BHK70.98 sq m · 764 sq ft10
2BHK71.12 sq m · 766 sq ft10
2BHK71.14 sq m · 766 sq ft10
2BHK71.37 sq m · 768 sq ft10
2BHK78.11 sq m · 841 sq ft20
3BHK96.29 sq m · 1,036 sq ft10
3BHK96.34 sq m · 1,037 sq ft10
4BHK202.76 sq m · 2,182 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 124 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 26 Feb 2020Source

Legal

  • Legal Title reportSearch Title Report.pdf · uploaded 26 Feb 2020Source
  • Declaration Form BDevelopers Declaration.pdf · uploaded 26 Feb 2020Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 26 Feb 2020Source
  • 1 Copy of the legal title reportSearch Title Report.pdf · uploaded 26 Feb 2020Source
  • 1 Details of encumbrancesNo encumbrance cert.pdf · uploaded 26 Feb 2020Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 26 Feb 2020Source
Show all 125 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentB2.pdf · uploaded 26 Feb 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentB4.pdf · uploaded 26 Feb 2020Source
  • 3 Building Plan Approval / NA Order for plotted developmentD1.pdf · uploaded 26 Feb 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 26 Feb 2020Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 26 Feb 2020Source
  • 1 Declaration in FORM BDevelopers Declaration.pdf · uploaded 26 Feb 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA - Certificate-Emerald.pdf · uploaded 26 Feb 2020Source
  • 1 Proforma of Allotment letterUPLIFE- Phases 1 to 5-26 Feb.pdf · uploaded 26 Feb 2020Source
  • 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 26 Feb 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A Certificate - Emrald - June-20.pdf · uploaded 30 Jun 2020Source
  • 1 Details of Restarting of Construction work post lockdownUp Life Phase - 2 Emerald - Covid19.pdf · uploaded 15 Jul 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)AS LLP - UPLIFE- BLDG - Emerald - 2019-2020.pdf · uploaded 13 May 2021Source
  • 1 Disclosure of sold/ booked inventoryUp-life phase 2 Emerald.pdf · uploaded 14 Jun 2021Source
  • 2 Disclosure of sold/ booked inventoryDisclouser of Emrald.pdf · uploaded 16 Sep 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Form-3 - Emerald.pdf · uploaded 16 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A Certificate - Emerald - SEP 2021.pdf · uploaded 16 Oct 2021Source
  • 3 Disclosure of sold/ booked inventoryPhase -2 Emerald - Disclosure- Builder.pdf · uploaded 4 Dec 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Phase 2 EMERALD.pdf · uploaded 4 Dec 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A Certificate Emerald - Dec -21.pdf · uploaded 19 Jan 2022Source
  • 3 Proforma of Allotment letterEMERALD STANDARD DRAFT.pdf · uploaded 10 Jun 2022Source
  • 2 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 15 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A Certificate - Veronica - June 2021.pdf · uploaded 24 Jan 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A Certificate - Veronica - SEP 2021.pdf · uploaded 24 Jan 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A Certificate Veronica - Dec -21.pdf · uploaded 24 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 20-21- Avior - Up Life Phase 2 -Emrald.pdf · uploaded 24 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEmerald Phase - 2 Separate Bank Account.pdf · uploaded 3 Feb 2023Source
  • 2 Details of encumbrancesFullerton Enkumbarnce Certificate.pdf · uploaded 15 Feb 2023Source
  • 1 Declaration about Commencement CertificateEmerald - Declaration about CC.pdf · uploaded 20 Mar 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 - Emerald - Dec-21.pdf · uploaded 30 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1- Emerald - 31-Mar-2022.pdf · uploaded 30 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Engineer Certificate-Emrald-Mar-22.pdf · uploaded 30 Mar 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Uplife Phase 2 Emerald- Mar-2022.pdf · uploaded 30 Mar 2023Source
  • 4 Disclosure of sold/ booked inventoryDisclosure - Emerald -Mar 22.pdf · uploaded 30 Mar 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 30 Mar 2023Source
  • 2 CERSAI detailsCERSAI_Search_Report_SBI.pdf · uploaded 30 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Emerald -Mar -22.pdf · uploaded 30 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - Emarld - 21-22.pdf · uploaded 30 Mar 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 - Emerald Date 30-06-2022.pdf · uploaded 27 Sep 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 - Emerald Date 30-09-2022.pdf · uploaded 27 Sep 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 - Emerald Date 31-12-2022.pdf · uploaded 27 Sep 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMERALD - Jun 22.pdf · uploaded 27 Sep 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMERALD - Sept 22.pdf · uploaded 27 Sep 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMERALD - Dec 22.pdf · uploaded 27 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Uplife Phase 2 Emerald- Jun-2022.pdf · uploaded 27 Sep 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Uplife Phase 2 Emerald- Sep-2022.pdf · uploaded 27 Sep 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Uplife Phase 2 Emerald- Dec-2022.pdf · uploaded 27 Sep 2023Source
  • 5 Disclosure of sold/ booked inventoryDisclosure PH-2- Emerald - Jun 22.pdf · uploaded 27 Sep 2023Source
  • 6 Disclosure of sold/ booked inventoryDisclosure PH-2- Emerald - Sept 22.pdf · uploaded 27 Sep 2023Source
  • 7 Disclosure of sold/ booked inventoryDisclosure PH-2- Emerald - Dec 22.pdf · uploaded 27 Sep 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - EMERALD - Jun 22.pdf · uploaded 27 Sep 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - EMERALD - Sept 22.pdf · uploaded 27 Sep 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - EMERALD - Dec 22.pdf · uploaded 27 Sep 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 - Emerald Date 31-03-2023.pdf · uploaded 29 Nov 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMERALD - Mar 23.pdf · uploaded 29 Nov 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Emrald - Mar 23.pdf · uploaded 29 Nov 2023Source
  • 8 Disclosure of sold/ booked inventoryDisclosure PH-2- Emerald - Mar 23.pdf · uploaded 29 Nov 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - EMERALD - Mar 23.pdf · uploaded 29 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Uplife Phase 2 Emarld - 2022-2023.pdf · uploaded 29 Nov 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Emrald - Jun 23.pdf · uploaded 18 Jan 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Emrald - Sept 23.pdf · uploaded 18 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMERALD - Jun 23.pdf · uploaded 18 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - EMERALD - Sept 23.pdf · uploaded 18 Jan 2024Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Tirupati- Jun 23.pdf · uploaded 18 Jan 2024Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Emrald- Sept 23.pdf · uploaded 18 Jan 2024Source
  • 9 Disclosure of sold/ booked inventoryDisclosure PH-2- Emerald - Jun 23.pdf · uploaded 18 Jan 2024Source
  • 10 Disclosure of sold/ booked inventoryDisclosure PH-2- Emerald - Sept 23.pdf · uploaded 18 Jan 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - EMERALD - Jun 23_compressed.pdf · uploaded 18 Jan 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - EMERALD - Sept 23_compressed.pdf · uploaded 18 Jan 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Emrald - Dec 23.pdf · uploaded 15 Feb 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Ph-2-Emarld - Dec 23_compressed.pdf · uploaded 15 Feb 2024Source
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Ph-2-Emarld- Dec 23.pdf · uploaded 15 Feb 2024Source
  • 11 Disclosure of sold/ booked inventoryDisclosure PH-2- Emarld - Dec 23.pdf · uploaded 15 Feb 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Ph-2-Emrald-Dec 23_compressed.pdf · uploaded 15 Feb 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Ph-2-Emrald - Mar 24.pdf · uploaded 3 Jun 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Ph-2-Emarld - Mar 24.pdf · uploaded 3 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Uplife-Ph-2 Emrald - Mar 24.pdf · uploaded 3 Jun 2024Source
  • 12 Disclosure of sold/ booked inventoryDisclosure PH-2- Emarld - Mar 24.pdf · uploaded 3 Jun 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Ph-2-Emrald-Mar 24.pdf · uploaded 3 Jun 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Ph-2- Emarld - Jun 24.pdf · uploaded 3 Aug 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ph-2- Emarld - Jun 24.pdf · uploaded 3 Aug 2024Source
  • 13 Disclosure of sold/ booked inventoryDisclosure - Ph-2- Emarld - Jun 24.pdf · uploaded 3 Aug 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Ph-2- Emarld - Jun 24.pdf · uploaded 3 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Ph-2-Emarld-Sept 24.pdf · uploaded 21 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Ph-2-Emarld-Sept 24.pdf · uploaded 21 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Ph-2-Emarld-Sept 24.pdf · uploaded 21 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclosure - Ph-2- Emarld - Sept 24.pdf · uploaded 21 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Emerald - 2023 - 2024.pdf · uploaded 25 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Ph-2-Emarld-Dect 24.pdf · uploaded 4 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Ph-2-Emarld-Dec 24.pdf · uploaded 4 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Ph-2-Emarld-Dec 24.pdf · uploaded 4 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure - Ph-2- Emarld - Dec 24.pdf · uploaded 4 Feb 2025Source
  • Form 2A (FY 2024-2025)Form 2A - Uplife - Emrald - Mar 25.pdf · uploaded 16 Jun 2025Source
  • Form 1FORM 1 PH 2 EMERALD - Mar 25.pdf · uploaded 26 Jun 2025Source
  • Form 2FORM 2 PH 2 EMERALD - Mar 25.pdf · uploaded 26 Jun 2025Source
  • Form 3FORM 3 PH 2 EMERALD - Mar 25.pdf · uploaded 26 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDIS - PH 2 EMERALD - Mar 25.pdf · uploaded 26 Jun 2025Source
  • Withdrawal Update Form 1Form 1 - EMERALD - Jun 25.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 2Form 2 - EMERALD - Jun 2025.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 - EMERALD - JUN 2025.pdf · uploaded 30 Jul 2025Source
  • Form 5 (FY 2024-2025)Form 5_Emarald ph 2 FY 2024-2025 sign_compressed.pdf · uploaded 26 Dec 2025Source
  • Withdrawal Update Form 1Form 1 Phase 2.pdf · uploaded 30 Dec 2025Source
  • Withdrawal Update Form 2ASLLP - Form 2 - Emerald - Phase 2 - Q3.pdf · uploaded 30 Dec 2025Source
  • Withdrawal Update Form 3Form 3 Emarald CC Ph2 30092025 sign_compressed.pdf · uploaded 30 Dec 2025Source
  • Withdrawal Update Form 1ASLLP - Dec 25 - Form 1 - Ph 2.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2ASLLP - Dec 25 - Form 2 - Ph 2.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Form 3 Emarald Ph2 31122025 sign_compressed.pdf · uploaded 13 Feb 2026Source

Technical

  • DocumentLayout.pdf · uploaded 26 Feb 2020Source
  • DocumentB2.pdf · uploaded 26 Feb 2020Source
  • DocumentB4.pdf · uploaded 26 Feb 2020Source
  • DocumentD1.pdf · uploaded 26 Feb 2020Source
  • DocumentLayout.pdf · uploaded 15 Oct 2022Source

Technical (Architect)

  • DocumentForm 1-Ph-2-Emarld-Sept 24.pdf · uploaded 21 Dec 2024Source
  • DocumentForm 1-Ph-2-Emarld-Dect 24.pdf · uploaded 4 Feb 2025Source
  • DocumentASLLP - Dec 25 - Form 1 - Ph 2.pdf · uploaded 13 Feb 2026Source

Technical (Engineer)

  • DocumentForm 2-Ph-2-Emarld-Sept 24.pdf · uploaded 21 Dec 2024Source
  • DocumentForm 2-Ph-2-Emarld-Dec 24.pdf · uploaded 4 Feb 2025Source
  • DocumentASLLP - Dec 25 - Form 2 - Ph 2.pdf · uploaded 13 Feb 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Uravade, Mulshi taluka

Survey, CTS, gat or plot numbers

431

Boundaries

North
Internal Road Then Gat No 423-424
South
Open Space
East
Internal Road Then Up-Life-Phase-3-Sapphire
West
Internal Road Then Up-Life-Phase - 1- Veronica

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSpiro Architects—
Chartered accountantPriyanka Chordiya And Associates—
EngineerChandrakant Deshpande—
EngineerKashinath Dhanave—
EngineerVinod Kathare—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology