Raman Stellar

Certificate Signed

Tathwade, Pune 411033 |Promoter: Soham Shivam Developers

Residential / Group HousingRERAP52100049189
3 Feb 2023Registered with MahaRERA
31 Dec 2026Promised completion
4Buildings
112Units registered61 booked (54%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
4
Unit types
2BHK, 1BHK112 units in all
Address
42/2, Sr.No. 42/2, Moraya Colony, Behind Raghunandan Mangal Karyalay, TATHWADEPIN 411033
Designated bank account
212
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.61753, 73.75994
Raman Stellar is at latitude 18.61753, longitude 73.75994.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
3 Feb 2023
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000491893 Feb 202331 Dec 202631 Dec 2026Soham Shivam DevelopersProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A728
Wing B728
Wing C728
Wing D728

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

61 of 112 units booked (54%), as the promoter reported to MahaRERA

2BHK · 98 units1BHK · 14 units
BuildingTypeCarpet areaUnitsBooked
Wing A2BHK69.38 sq m · 747 sq ft77
Wing A2BHK69.38 sq m · 747 sq ft75
Wing A2BHK69.38 sq m · 747 sq ft75
Wing A2BHK69.38 sq m · 747 sq ft77
Wing B1BHK44.07 sq m · 474 sq ft76
Wing B1BHK44.07 sq m · 474 sq ft77
Wing B2BHK69.38 sq m · 747 sq ft72
Wing B2BHK69.38 sq m · 747 sq ft77
Show all 16 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing C2BHK72.74 sq m · 783 sq ft70
Wing C2BHK72.74 sq m · 783 sq ft70
Wing C2BHK72.74 sq m · 783 sq ft70
Wing C2BHK72.74 sq m · 783 sq ft76
Wing D2BHK72.74 sq m · 783 sq ft70
Wing D2BHK72.74 sq m · 783 sq ft70
Wing D2BHK72.74 sq m · 783 sq ft75
Wing D2BHK72.74 sq m · 783 sq ft74

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 143 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN SOHAM SHIVAM DEVELOPERS.pdf · uploaded 9 Dec 2022Source
  • Other – Financeno encumbrances wrt legal technical n financial aspects.pdf · uploaded 10 Dec 2022Source

Legal

  • Declaration Form BSOHAM SHIVAM DEVELOPERS AFFIDAVIT.pdf · uploaded 9 Dec 2022Source
  • Other – Legalno encumbrances wrt legal technical n financial aspects.pdf · uploaded 10 Dec 2022Source
  • Legal Title reportlegal title report 2.pdf · uploaded 20 Jan 2023Source

Migrated

  • 1 PAN CardPAN SOHAM SHIVAM DEVELOPERS.pdf · uploaded 9 Dec 2022Source
  • 1 a Details of encumbrances concerned to Financeno encumbrances declaration.pdf · uploaded 9 Dec 2022Source
Show all 144 documentsShow fewer documents

Migrated

  • 1 b Details of encumbrances concerned to Legalno encumbrances declaration.pdf · uploaded 9 Dec 2022Source
  • 1 Copy of Layout Approval (in case of layout)01 Rera.pdf · uploaded 9 Dec 2022Source
  • 2 Copy of Layout Approval (in case of layout)02 Rera.pdf · uploaded 9 Dec 2022Source
  • 3 Copy of Layout Approval (in case of layout)03Rera.pdf · uploaded 9 Dec 2022Source
  • 4 Copy of Layout Approval (in case of layout)04 Rera.pdf · uploaded 9 Dec 2022Source
  • 5 Copy of Layout Approval (in case of layout)05 Rera.pdf · uploaded 9 Dec 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentNA ORDER COPY.pdf · uploaded 9 Dec 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 9 Dec 2022Source
  • 1 Declaration about Commencement CertificateFORMAT D DECLARATION ABOUT COMMENCEMENT.pdf · uploaded 9 Dec 2022Source
  • 1 Declaration in FORM BSOHAM SHIVAM DEVELOPERS AFFIDAVIT.pdf · uploaded 9 Dec 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 9 Dec 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200254170979_For_Asset_Based_Search_07_12_2022_13_52_51_286.pdf · uploaded 9 Dec 2022Source
  • 1 Other – Legalno encumbrances wrt legal technical n financial aspects.pdf · uploaded 10 Dec 2022Source
  • 1 Other – Financeno encumbrances wrt legal technical n financial aspects.pdf · uploaded 10 Dec 2022Source
  • 1 Other – Technicalno encumbrances wrt legal technical n financial aspects.pdf · uploaded 10 Dec 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLARATION ABOUT SEPERATE BANK ACCOUNT FOR RERA.pdf · uploaded 16 Dec 2022Source
  • 1 Copy of the legal title reportlegal title report 2.pdf · uploaded 20 Jan 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 final.pdf · uploaded 20 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsdisclosure of int mahesh barne.pdf · uploaded 20 Jan 2023Source
  • 2 Disclosure of Interest in Other Real Estate Organizationsdisclosureof int in yogita barne.pdf · uploaded 20 Jan 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT TO SALE.PDF · uploaded 20 Jan 2023Source
  • 1 Proforma of Allotment letter1 Proforma of Allotment letter (1).pdf · uploaded 20 Jan 2023Source
  • 1 Deviation Report with respect to Allotment letterno deviation wrt allotment letter.pdf · uploaded 20 Jan 2023Source
  • 1 Deviation Report with respect to model copy of Agreementno deviation wrt to agreement copy.pdf · uploaded 20 Jan 2023Source
  • 1 Disclosure of sold/ booked inventoryDocScanner 09-Nov-2023 3-21 pm(2).pdf · uploaded 10 Nov 2023Source
  • 2 Disclosure of sold/ booked inventoryDocScanner 09-Nov-2023 3-21 pm(1).pdf · uploaded 10 Nov 2023Source
  • 3 Disclosure of sold/ booked inventoryDocScanner 09-Nov-2023 3-21 pm.pdf · uploaded 10 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)soham Shivam form 3 March 23compressed.pdf · uploaded 10 Nov 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)soham Shivam form 3 June 23_compressed.pdf · uploaded 10 Nov 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)soham Shivam form 3 sep 23compressed.pdf · uploaded 10 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 23.pdf · uploaded 11 Nov 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 23.pdf · uploaded 11 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 sep 23.pdf · uploaded 11 Nov 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)march 23 SSD.pdf · uploaded 17 Nov 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 23 SSD.pdf · uploaded 17 Nov 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)sep 23 SSD.pdf · uploaded 17 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SSD 2A.pdf · uploaded 17 Nov 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)MARCH 23 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Jan 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)june 23 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Jan 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)sep 23 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 5 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_MARCH 23 suraj waghdariakr -.pdf · uploaded 5 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 JUN 23 _suraj waghdariakr -.pdf · uploaded 5 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 SEP 23 _suraj waghdariakr -.pdf · uploaded 5 Jan 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)(1).pdf · uploaded 5 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MARCH 23.pdf · uploaded 5 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)JUNE 23 CA 3.pdf · uploaded 5 Jan 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SEP 23 CA 3 Certificate.pdf · uploaded 5 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 soham Shivam fy 22 23.pdf · uploaded 5 Jan 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)form1 soham shivam dec 23.pdf · uploaded 20 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC 23.pdf · uploaded 20 Jan 2024Source
  • 4 Disclosure of sold/ booked inventoryAll sold unsold shops history - Q 3.pdf · uploaded 20 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Soham_Shivam_Developers form 3_compressed.pdf · uploaded 20 Jan 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 UPDATED.pdf · uploaded 9 Feb 2024Source
  • 2 Building Plan Approval / NA Order for plotted development1 LAYOUT.pdf · uploaded 20 Apr 2024Source
  • 3 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 20 Apr 2024Source
  • 4 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 20 Apr 2024Source
  • 5 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 20 Apr 2024Source
  • 6 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 20 Apr 2024Source
  • 7 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 20 Apr 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE_compressed.pdf · uploaded 20 Apr 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 20 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS ASSOCIATES (2).pdf · uploaded 20 Apr 2024Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTO RY.pdf · uploaded 20 Apr 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 RAMAN STELLAR_11zon.pdf · uploaded 20 Apr 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameformat A seperate bank account ORDER 34 BANK DETAILS.pdf · uploaded 20 Apr 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1RAMAN STELLAR.pdf · uploaded 20 Jul 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)RAMAN STEL FROM 2.pdf · uploaded 20 Jul 2024Source
  • 6 Disclosure of sold/ booked inventoryAll sold unsold shops history - Copy.pdf · uploaded 20 Jul 2024Source
  • 7 Disclosure of sold/ booked inventoryAll sold unsold shops history - Copy.pdf · uploaded 20 Jul 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 soham shivam developers RAMAN STELLAR_11zon.pdf · uploaded 20 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 RAMAN STELLAR Q 2.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 RAMAN STELLAR_compressed.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryl sold unsold.pdf · uploaded 19 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A RAMAN STELLAR.pdf · uploaded 19 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SOHAM SHIVAM DEVEP.pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 .pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SOHAM SHIVAM.pdf · uploaded 16 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryAll sold unsold shops history.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)soham shivam developers form 1.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Soham shivam developers Form 3.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)raman stellar form 2.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryAll sold unsold shops history - Copy.pdf · uploaded 19 Apr 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 2From 2_11zon.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 2From 2_11zon.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 3Soham Shivam Developers Form 3_11zon.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 3Soham Shivam Developers Form 3_11zon.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3FORM 3_R.pdf · uploaded 20 Jan 2026Source
  • Form 5 (FY 2024-2025)FORM 5 SOHAM SHIVAM DEVELOPERS UPLOAD.pdf · uploaded 16 Feb 2026Source
  • Form 5 (FY 2023-2024)NEW form 5 SHOAM SHIVARAM F Y 23 24 UPLOAD.pdf · uploaded 18 Feb 2026Source
  • Form 5 (FY 2022-2023)form 5 soham Shivam fy 22 23.pdf · uploaded 2 Mar 2026Source
  • Form 2A (FY 2024-2025)FORM 2A SOHAM SHIVAM DEVELOPERS FINAL UPLOAD_.pdf · uploaded 17 Apr 2026Source
  • Form 2A (FY 2025-2026)form 2A.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 11 form 1.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 11 form 1.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 11 form 1.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 22 form 2.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 22 form 2.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 22 form 2.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 33 Form 3 rsize.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 33 Form 3 rsize.pdf · uploaded 28 Sep 2026Source
  • Withdrawal Update Form 33 Form 3 rsize.pdf · uploaded 28 Sep 2026Source

Technical

  • Document01 Rera.pdf · uploaded 9 Dec 2022Source
  • Document02 Rera.pdf · uploaded 9 Dec 2022Source
  • Document03Rera.pdf · uploaded 9 Dec 2022Source
  • Document04 Rera.pdf · uploaded 9 Dec 2022Source
  • Document05 Rera.pdf · uploaded 9 Dec 2022Source
  • DocumentNA ORDER COPY.pdf · uploaded 9 Dec 2022Source
  • Other – Technicalno encumbrances wrt legal technical n financial aspects.pdf · uploaded 10 Dec 2022Source
  • Document1 LAYOUT.pdf · uploaded 20 Apr 2024Source
  • Document1.pdf · uploaded 20 Apr 2024Source
  • Document2.pdf · uploaded 20 Apr 2024Source
  • Document3.pdf · uploaded 20 Apr 2024Source
  • Document4.pdf · uploaded 20 Apr 2024Source
  • Document5.pdf · uploaded 20 Apr 2024Source

Technical (Architect)

  • Documentform 1 RAMAN STELLAR Q 2.pdf · uploaded 19 Oct 2024Source
  • DocumentFORM 1 SOHAM SHIVAM DEVEP.pdf · uploaded 16 Jan 2025Source
  • Documentsoham shivam developers form 1.pdf · uploaded 19 Apr 2025Source
  • Document1 form 1.pdf · uploaded 28 Sep 2026Source

Technical (Engineer)

  • Documentform 2.pdf · uploaded 19 Oct 2024Source
  • DocumentFORM 2 SOHAM SHIVAM.pdf · uploaded 16 Jan 2025Source
  • Documentraman stellar form 2.pdf · uploaded 19 Apr 2025Source
  • Document2 form 2.pdf · uploaded 28 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Tathwade, Mulshi taluka

Survey, CTS, gat or plot numbers

42/2

Boundaries

North
Colony Road
South
Sno 43 3
East
Public Road And Property Of Sno 25 1
West
Property Of Bhosale Internal Plot No 4 Of Hissa

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGirish Gupte—
Chartered accountantArti Jain—
Chartered accountantPankaj Patil—
EngineerAmol Nirmal—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology