La Centra
Certificate SignedTathwade, Pune 411057 |Promoter: M N Landmarks LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- —195 units in all
- Address
- 81/4, Mumbai-Banglore Highway, TathawadePIN 411057
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P52100034348- Registered
- 4 Apr 2022
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
Completion pushed back 4 months
P52100049554- Registered
- 15 Feb 2023
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100034348 | 4 Apr 2022 | 31 Dec 2026 | 30 Apr 2027 | M N Landmarks LLP | Project page |
| P52100049554 | 15 Feb 2023 | 31 Dec 2026 | 30 Apr 2027 | M N Landmarks LLP | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| La Centra | 13 | 147 |
| La Centra Phase 2 | 4 | 48 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
195 units registered
| RERA | Building | Type | Carpet area | Units |
|---|---|---|---|---|
| P52100034348 | La Centra | — | — | 147 |
| P52100049554 | La Centra Phase 2 | — | — | 48 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 389 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Legal
- Declaration Form BP52100034348 · Form B.pdf · uploaded 23 Mar 2022Source
- Legal Title reportP52100034348 · Legal Title Report-1-2.pdf · uploaded 25 Mar 2022Source
- Legal Title reportP52100034348 · Legal Title Report-3-18.pdf · uploaded 25 Mar 2022Source
- Declaration Form BP52100049554 · Form B - La Centra.pdf · uploaded 2 Jan 2023Source
Show all 391 documentsShow fewer documents
Legal
- Legal Title reportP52100049554 · Search Titile Report 3-1-22_compressed.pdf · uploaded 4 Jan 2023Source
Migrated
- 1 Copy of Layout Approval (in case of layout)P52100034348 · 1_compressed.pdf · uploaded 23 Mar 2022Source
- 2 Copy of Layout Approval (in case of layout)P52100034348 · 2.pdf · uploaded 23 Mar 2022Source
- 3 Copy of Layout Approval (in case of layout)P52100034348 · 3.pdf · uploaded 23 Mar 2022Source
- 4 Copy of Layout Approval (in case of layout)P52100034348 · 4.pdf · uploaded 23 Mar 2022Source
- 5 Copy of Layout Approval (in case of layout)P52100034348 · 5.pdf · uploaded 23 Mar 2022Source
- 6 Copy of Layout Approval (in case of layout)P52100034348 · 6.pdf · uploaded 23 Mar 2022Source
- 7 Copy of Layout Approval (in case of layout)P52100034348 · 7.pdf · uploaded 23 Mar 2022Source
- 8 Copy of Layout Approval (in case of layout)P52100034348 · 8.pdf · uploaded 23 Mar 2022Source
- 9 Copy of Layout Approval (in case of layout)P52100034348 · 9.pdf · uploaded 23 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100034348 · 1_compressed.pdf · uploaded 23 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100034348 · Commencement Certificatecompressed.pdf · uploaded 23 Mar 2022Source
- 1 Declaration about Commencement CertificateP52100034348 · Format - D MN LANDMARKS LLP.pdf · uploaded 23 Mar 2022Source
- 1 Declaration in FORM BP52100034348 · Form B.pdf · uploaded 23 Mar 2022Source
- 1 CERSAI detailsP52100034348 · CERSAI report.pdf · uploaded 23 Mar 2022Source
- 1 Copy of the legal title reportP52100034348 · Legal Title Report-1-2.pdf · uploaded 25 Mar 2022Source
- 2 Copy of the legal title reportP52100034348 · Legal Title Report-3-18.pdf · uploaded 25 Mar 2022Source
- 1 Details of encumbrancesP52100034348 · Self Declaration Regarding Encumbrances MN LANDMARKS LLP.pdf · uploaded 25 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · Form 3 certificate_compressed (1).pdf · uploaded 25 Mar 2022Source
- 1 Proforma of Allotment letterP52100034348 · Agreement to Sale La Centra.pdf · uploaded 25 Mar 2022Source
- 2 Proforma of Allotment letterP52100034348 · Allotment Letter draft.pdf · uploaded 25 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · Form 1.pdf · uploaded 18 Aug 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · Form 2.pdf · uploaded 18 Aug 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · Form 3_compressed (2).pdf · uploaded 18 Aug 2022Source
- 10 Copy of Layout Approval (in case of layout)P52100034348 · 1 (1).pdf · uploaded 7 Oct 2022Source
- 11 Copy of Layout Approval (in case of layout)P52100034348 · 2.pdf · uploaded 7 Oct 2022Source
- 12 Copy of Layout Approval (in case of layout)P52100034348 · 3.pdf · uploaded 7 Oct 2022Source
- 13 Copy of Layout Approval (in case of layout)P52100034348 · 4.pdf · uploaded 7 Oct 2022Source
- 14 Copy of Layout Approval (in case of layout)P52100034348 · 5.pdf · uploaded 7 Oct 2022Source
- 15 Copy of Layout Approval (in case of layout)P52100034348 · 6.pdf · uploaded 7 Oct 2022Source
- 16 Copy of Layout Approval (in case of layout)P52100034348 · 7.pdf · uploaded 7 Oct 2022Source
- 17 Copy of Layout Approval (in case of layout)P52100034348 · 8.pdf · uploaded 7 Oct 2022Source
- 18 Copy of Layout Approval (in case of layout)P52100034348 · 9.pdf · uploaded 7 Oct 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100034348 · Revise Commencement Certificate.pdf · uploaded 7 Oct 2022Source
- 1 Proforma of Agreement for saleP52100034348 · 2ndAgreementDraft.pdf · uploaded 21 Oct 2022Source
- 2 a Details of encumbrances concerned to FinanceP52100034348 · Declaration for Encumbrances - M N Landmarks LLP .pdf · uploaded 9 Nov 2022Source
- 3 a Details of encumbrances concerned to FinanceP52100034348 · Declaration for Encumbrances - M N Landmarks LLP _001.pdf · uploaded 9 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalP52100034348 · Declaration for Encumbrances - M N Landmarks LLP .pdf · uploaded 9 Nov 2022Source
- 2 b Details of encumbrances concerned to LegalP52100034348 · Declaration for Encumbrances - M N Landmarks LLP _001.pdf · uploaded 9 Nov 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · La Centra Form 3 July - Sept 22 CORRECTED.pdf · uploaded 14 Dec 2022Source
- 19 Copy of Layout Approval (in case of layout)P52100034348 · 1-compressed.pdf · uploaded 22 Dec 2022Source
- 2 Proforma of Agreement for saleP52100034348 · 3rd DRAFT AGREEMENT DATED 22.pdf · uploaded 22 Dec 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100049554 · Commecement Certificate dt 15 12 2022.pdf · uploaded 2 Jan 2023Source
- 1 Declaration about Commencement CertificateP52100049554 · Declaration About Commecement Certificate - La Centra.pdf · uploaded 2 Jan 2023Source
- 1 Declaration in FORM BP52100049554 · Form B - La Centra.pdf · uploaded 2 Jan 2023Source
- 1 Proforma of Allotment letterP52100049554 · 15 Model Form of Allotment Letter.pdf · uploaded 2 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100049554 · Deviation Report - La Centra.pdf · uploaded 2 Jan 2023Source
- 1 PAN CardP52100049554 · M N Landmarks LLP Pan Card.pdf · uploaded 3 Jan 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100049554 · Legal Encumbraces1.pdf · uploaded 3 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100049554 · Finance Encumbraces.pdf · uploaded 3 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalP52100049554 · Legal Encumbraces1.pdf · uploaded 3 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalP52100049554 · Finance Encumbraces.pdf · uploaded 3 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterP52100049554 · Allotment Deviation.pdf · uploaded 3 Jan 2023Source
- 1 Copy of the legal title reportP52100049554 · Search Titile Report 3-1-22_compressed.pdf · uploaded 4 Jan 2023Source
- 1 Proforma of Agreement for saleP52100049554 · 16 Agreement format RERA.pdf · uploaded 5 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · Form 3.pdf · uploaded 7 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100049554 · BBL DoI.pdf · uploaded 10 Jan 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100049554 · MPL DoI.pdf · uploaded 10 Jan 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP52100049554 · Sumit DoI.pdf · uploaded 10 Jan 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsP52100049554 · MPL DoI.pdf · uploaded 10 Jan 2023Source
- 1 CERSAI detailsP52100049554 · M N LANDMARKS LLP_27695661.pdf · uploaded 11 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · Form 1.pdf · uploaded 12 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · Form 2.pdf · uploaded 12 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryP52100034348 · Sold Unsold.pdf · uploaded 12 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100049554 · 6_compressed (1).pdf · uploaded 12 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100049554 · 7_compressed.pdf · uploaded 12 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100049554 · Bank AC Declaration.pdf · uploaded 12 Jan 2023Source
- 3 Proforma of Agreement for saleP52100034348 · Shop Agreement draft dated 160123.pdf · uploaded 16 Jan 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100049554 · 2_compressed.pdf · uploaded 18 Jan 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100049554 · 3_compressed.pdf · uploaded 18 Jan 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100049554 · 4_compressed.pdf · uploaded 18 Jan 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100049554 · 5_compressed.pdf · uploaded 18 Jan 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100049554 · 7_compressed.pdf · uploaded 18 Jan 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100049554 · 8_compressed.pdf · uploaded 18 Jan 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentP52100049554 · 9_compressed.pdf · uploaded 18 Jan 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentP52100049554 · 10_compressed.pdf · uploaded 18 Jan 2023Source
- 1 Other – TechnicalP52100049554 · Area Declaration.pdf · uploaded 20 Jan 2023Source
- 2 CERSAI detailsP52100049554 · M N LANDMARKS LLP_27695661 (2).pdf · uploaded 24 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · Form1.pdf · uploaded 1 Feb 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · Form 2.pdf · uploaded 1 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · Form 3_compressed (2).pdf · uploaded 1 Feb 2023Source
- 2 Other – TechnicalP52100049554 · Rera Letter - La Centra.pdf · uploaded 2 Feb 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100049554 · Layout-compressed Edited.pdf · uploaded 8 Feb 2023Source
- 2 Proforma of Agreement for saleP52100049554 · 2nd RERA Draft.pdf · uploaded 28 Feb 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100049554 · New Bank declaration.pdf · uploaded 28 Feb 2023Source
- 2 Deviation Report with respect to model copy of AgreementP52100049554 · Deviation - M N Landmarks LLP.pdf · uploaded 28 Feb 2023Source
- 1 PAN CardP52100034348 · PAN Card - M N Landmarks.pdf · uploaded 26 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · la centra.pdf · uploaded 10 May 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · la centra.pdf · uploaded 10 May 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · la centra_compressed.pdf · uploaded 10 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · la centra ph 2_compressed.pdf · uploaded 10 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · la centra ph 2_compressed.pdf · uploaded 10 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · la centra ph II_compressed.pdf · uploaded 10 May 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100034348 · discloure of interest in other real estate org 1.pdf · uploaded 2 Jul 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100034348 · discloure of interest in other real estate org 2.pdf · uploaded 2 Jul 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP52100034348 · discloure of interest in other real estate org 3.pdf · uploaded 2 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100034348 · Declaration - Seperate Bank Acc .pdf · uploaded 2 Jul 2023Source
- 1 Deviation Report with respect to Allotment letterP52100034348 · deviation report - allotment letter.pdf · uploaded 2 Jul 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · La Centra Phase 2.pdf · uploaded 21 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 La centra .pdf · uploaded 2 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · F2 LA CENTRA.pdf · uploaded 2 Aug 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 La centra.pdf · uploaded 2 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 La centra Ph II.pdf · uploaded 2 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 LA CENTRA PH II.pdf · uploaded 2 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 La centra ph II.pdf · uploaded 2 Aug 2023Source
- 2 Disclosure of sold/ booked inventoryP52100034348 · lacentra sold-unsold march 23.pdf · uploaded 8 Aug 2023Source
- 3 Disclosure of sold/ booked inventoryP52100034348 · lacentra sold-unsold june 23.pdf · uploaded 8 Aug 2023Source
- 1 Disclosure of sold/ booked inventoryP52100049554 · La centra Ph 2 sold unsold data.pdf · uploaded 8 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 La Centra.pdf · uploaded 28 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · From 2 M N LLP_300923.pdf · uploaded 28 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 La Centra ph II.pdf · uploaded 28 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · From 2 MNLLP 2 dt30923.pdf · uploaded 28 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · La centra_30092023_11zon.pdf · uploaded 1 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · La centra Phase 2_3092023.pdf · uploaded 1 Nov 2023Source
- 4 Disclosure of sold/ booked inventoryP52100034348 · La centra .pdf · uploaded 3 Nov 2023Source
- 2 Disclosure of sold/ booked inventoryP52100049554 · La centra Ph II.pdf · uploaded 3 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100034348 · F5 LA CENTRA.pdf · uploaded 28 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100049554 · F5 LA CENTRA II.pdf · uploaded 28 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034348 · La Centra Phase - I.pdf · uploaded 3 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100049554 · La Centra Phase -II.pdf · uploaded 3 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 LC .pdf · uploaded 15 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · F2 LA CENTRA.pdf · uploaded 15 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 LC PH II.pdf · uploaded 15 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 LA CENTRA PH II.pdf · uploaded 15 Jan 2024Source
- 5 Disclosure of sold/ booked inventoryP52100034348 · la centra.pdf · uploaded 25 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryP52100049554 · la centra ph II.pdf · uploaded 25 Jan 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 La Centra .pdf · uploaded 30 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 La Centra Ph II .pdf · uploaded 30 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 La Centra.pdf · uploaded 24 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 La Centra ph 2.pdf · uploaded 24 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · F2 La Centra.pdf · uploaded 14 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 La Centra Ph 2.pdf · uploaded 14 May 2024Source
- 6 Disclosure of sold/ booked inventoryP52100034348 · La Centra - Sold Unsold Declaration.pdf · uploaded 15 May 2024Source
- 7 Disclosure of sold/ booked inventoryP52100034348 · La Centra - Sold Unsold Declaration updated.pdf · uploaded 15 May 2024Source
- 4 Disclosure of sold/ booked inventoryP52100049554 · La Centra Ph II - Sold Unsold Declaration updated.pdf · uploaded 15 May 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 La Centra .pdf · uploaded 16 May 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 La Centra Ph 2.pdf · uploaded 16 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034348 · La Centra FORM-2A.pdf · uploaded 11 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100034348 · La Centra FORM-5A.pdf · uploaded 11 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100049554 · La Centra Phase-2 FORM-2.pdf · uploaded 11 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100049554 · La Centra Phase-2 FORM-5.pdf · uploaded 11 Jun 2024Source
- 20 Copy of Layout Approval (in case of layout)P52100034348 · 1_11zon Layout Plan.pdf · uploaded 13 Jun 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100034348 · 2_11zon Basement plan.pdf · uploaded 13 Jun 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100034348 · 3_11zon Ground Floor Plan.pdf · uploaded 13 Jun 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100034348 · 4_11zon 1st Floor Plan.pdf · uploaded 13 Jun 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100034348 · 5_11zon 2nd Floor Plan.pdf · uploaded 13 Jun 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100034348 · 6_11zon 3rd to 16 Floor Plan.pdf · uploaded 13 Jun 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100034348 · 7_11zon 17 Floor Plan.pdf · uploaded 13 Jun 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100034348 · 8_11zon Building Plan.pdf · uploaded 13 Jun 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentP52100034348 · 9_11zon.pdf · uploaded 13 Jun 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentP52100034348 · 10_11zon.pdf · uploaded 13 Jun 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100034348 · Plinth Declaration with attachment.pdf · uploaded 13 Jun 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentP52100034348 · Commecement Certificate dt 15-12-2022.pdf · uploaded 13 Jun 2024Source
- 5 Commencement Certificates / NA Order for plotted developmentP52100034348 · Plinth Declaration with attachment.pdf · uploaded 13 Jun 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100034348 · Deviation report in respect of Model Draft La Centra_11zon.pdf · uploaded 13 Jun 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100034348 · Society Certificate dt 27-6-24 La Centra.pdf · uploaded 29 Jun 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034348 · F2 Ca Centra.pdf · uploaded 6 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 Ca Centra Phase II.pdf · uploaded 6 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · F2 La Centra.pdf · uploaded 11 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 La Centra Phase II.pdf · uploaded 11 Jul 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 LA CENTRA.pdf · uploaded 15 Jul 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 LA CENTRA PHASE-2.pdf · uploaded 15 Jul 2024Source
- 8 Disclosure of sold/ booked inventoryP52100034348 · Sold Unsold vLa Centra.pdf · uploaded 26 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryP52100049554 · La Centra Ph II - Sold Unsold.pdf · uploaded 26 Jul 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 La centra .pdf · uploaded 6 Aug 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 La centra ph II.pdf · uploaded 6 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 LC .pdf · uploaded 22 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 LC PH II.pdf · uploaded 22 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100049554 · Declaration of Sold Unsold La Centra Ph II.pdf · uploaded 23 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100034348 · Declaration of Sold unsold LA Centra Phase 1.pdf · uploaded 24 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 LA CENTRA PH II.pdf · uploaded 25 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 LC .pdf · uploaded 26 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 LC PH II.pdf · uploaded 26 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · F1 La centra.pdf · uploaded 16 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · F2 La Centra.pdf · uploaded 16 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100034348 · Sold and Unsold La Centra.pdf · uploaded 16 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · F1 La centra ph II.pdf · uploaded 16 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 La Centra Ph II.pdf · uploaded 16 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049554 · Sold Unsold La Centra Ph II.pdf · uploaded 17 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 La Centra.pdf · uploaded 21 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 La Centra II.pdf · uploaded 21 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034348 · LA CENTRA Form 1.pdf · uploaded 17 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049554 · LA CENTRA Phase 2 Form 1.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034348 · F2 LC.pdf · uploaded 25 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049554 · F2 LC PH II.pdf · uploaded 25 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100034348 · S n Us La Centra.pdf · uploaded 28 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049554 · S n Us La Centra Ph II.pdf · uploaded 28 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034348 · F3 LC_compressed.pdf · uploaded 1 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049554 · F3 LC II.pdf · uploaded 1 May 2025Source
- Form 1P52100034348 · MAR23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · SEP23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · DEC23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · MAR24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · DEC24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · MAR25.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · MAR23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · SEP23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · DEC23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · MAR24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · DEC24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100034348 · MAR25.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · MAR23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · SEP23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · DEC23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · MAR24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · DEC24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100034348 · MAR25.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · MAR23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · SEP23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · DEC23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · MAR24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · DEC24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · MAR25.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · MAR23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · MAR23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · MAR23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · MAR23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · JUNE23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · SEP23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · SEP23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · SEP23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · SEP23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · DEC23.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · DEC23.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · DEC23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · DEC23.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · MAR24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · MAR24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · MAR24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · mar24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · JUNE24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · june24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · SEP24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · SEP24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · SEP24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · sep24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · DEC24.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · DEC24.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · DEC24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · dec24.pdf · uploaded 24 Jun 2025Source
- Form 1P52100049554 · MAR25.pdf · uploaded 24 Jun 2025Source
- Form 2P52100049554 · MAR25.pdf · uploaded 24 Jun 2025Source
- Form 3P52100049554 · MAR25.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049554 · mar25.pdf · uploaded 24 Jun 2025Source
- Form 1P52100034348 · 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 28 Jun 2025Source
- Form 1P52100034348 · 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 28 Jun 2025Source
- Form 2P52100034348 · 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 28 Jun 2025Source
- Form 2P52100034348 · 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 28 Jun 2025Source
- Form 3P52100034348 · 3 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 28 Jun 2025Source
- Form 3P52100034348 · 4 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 28 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · 1 Disclosure of sold_ booked inventory.pdf · uploaded 28 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · 2 Disclosure of sold_ booked inventory.pdf · uploaded 28 Jun 2025Source
- Withdrawal Update Form 1P52100034348 · F1 LA CENTRA.pdf · uploaded 28 Jun 2025Source
- Withdrawal Update Form 2P52100034348 · MAR25.pdf · uploaded 28 Jun 2025Source
- Withdrawal Update Form 3P52100034348 · MAR25.pdf · uploaded 28 Jun 2025Source
- Withdrawal Update Form 1P52100049554 · MAR25.pdf · uploaded 28 Jun 2025Source
- Withdrawal Update Form 2P52100049554 · MAR25.pdf · uploaded 28 Jun 2025Source
- Withdrawal Update Form 3P52100049554 · MAR25.pdf · uploaded 28 Jun 2025Source
- Form 1P52100034348 · F1 LC .pdf · uploaded 7 Aug 2025Source
- Form 2P52100034348 · F2 LA CENTRA .pdf · uploaded 7 Aug 2025Source
- Form 3P52100034348 · SEP24.pdf · uploaded 7 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100034348 · Declaration of Sold unsold LA Centra Phase 1.pdf · uploaded 7 Aug 2025Source
- Withdrawal Update Form 1P52100034348 · Form 1 LC .pdf · uploaded 7 Aug 2025Source
- Withdrawal Update Form 2P52100034348 · F2 LC.pdf · uploaded 7 Aug 2025Source
- Withdrawal Update Form 3P52100034348 · F3 - LC.pdf · uploaded 7 Aug 2025Source
- Withdrawal Update Form 1P52100049554 · Form 1 LC Ph 2 .pdf · uploaded 7 Aug 2025Source
- Withdrawal Update Form 2P52100049554 · F2 LC Ph II.pdf · uploaded 7 Aug 2025Source
- Withdrawal Update Form 3P52100049554 · F3 - LC Ph 2.pdf · uploaded 7 Aug 2025Source
- Form 5 (FY 2024-2025)P52100034348 · F5 M N Landmarks LLP 1.pdf · uploaded 4 Oct 2025Source
- Form 5 (FY 2024-2025)P52100049554 · F5 M N Landmarks LLP.pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 1P52100034348 · 01 F1 LC.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 2P52100034348 · F2 LC.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 3P52100034348 · F3 LC.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 1P52100049554 · F1 LC II.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 2P52100049554 · F2 LC Ph II.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 3P52100049554 · F3 LC II.pdf · uploaded 7 Nov 2025Source
- Form 2A (FY 2024-2025)P52100034348 · FORM 2A_LA CENTRA_MN LANDMARK SEPT 2025.pdf · uploaded 5 Dec 2025Source
- Form 2A (FY 2024-2025)P52100049554 · FORM 2A_LA CENTRA PH 2_MN LANDMARK SEPT 2025.pdf · uploaded 5 Dec 2025Source
- Withdrawal Update Form 1P52100049554 · From 1 LC Ph 2 .pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 2P52100049554 · FPRM 2 LC II.PDF · uploaded 8 Jan 2026Source
- Withdrawal Update Form 3P52100049554 · Form 3 La Centra Phase 2.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 1P52100034348 · From 1 LC .pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 2P52100034348 · FORM 2 LC.PDF · uploaded 9 Jan 2026Source
- Withdrawal Update Form 3P52100034348 · Form 3 La Centra_revised.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 1P52100034348 · FORM 1 _LC_.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 2P52100034348 · Form 2 LC .pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 3P52100034348 · FORM 3_LC.PDF · uploaded 30 Apr 2026Source
- Withdrawal Update Form 1P52100049554 · FORM 1 _LC ph 2.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 2P52100049554 · FORM 2 _ LA CENTRA PH2.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 3P52100049554 · FORM 3_LC PHASE 2.pdf · uploaded 30 Apr 2026Source
- Form 5 (FY 2022-2023)P52100049554 · La Centra II.pdf · uploaded 18 Jun 2026Source
- Form 5 (FY 2023-2024)P52100049554 · La Centra II.pdf · uploaded 18 Jun 2026Source
- Form 2A (FY 2022-2023)P52100049554 · FORM2A FY 23-24.pdf · uploaded 19 Jun 2026Source
- Form 2A (FY 2023-2024)P52100049554 · FORM2A FY 23-24.pdf · uploaded 19 Jun 2026Source
- Withdrawal Update Form 1P52100034348 · FORM 1 _LC_.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 2P52100034348 · Form 2 LC .pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 3P52100034348 · FORM 3_LC.PDF · uploaded 16 Jul 2026Source
- Withdrawal Update Form 1P52100049554 · FORM 1_LA CENTRA PH II.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 2P52100049554 · La Centra Phase II Form 2.pdf · uploaded 21 Aug 2026Source
- Withdrawal Update Form 3P52100049554 · Form 3 June 26.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2025-2026)P52100034348 · FORM 5_ LC SIGNED.PDF · uploaded 28 Sep 2026Source
- Form 5 (FY 2025-2026)P52100049554 · FORM 5_ LC PH II SIGNED.PDF · uploaded 28 Sep 2026Source
- Form 2A (FY 2022-2023)P52100034348 · Form 2A FY 22-23.pdf · uploaded 3 Oct 2026Source
- Form 2A (FY 2023-2024)P52100034348 · Form 2A FY 23-24.pdf · uploaded 3 Oct 2026Source
- Form 2A (FY 2025-2026)P52100034348 · Form 2A La Centra Phase I.pdf · uploaded 3 Oct 2026Source
- Form 5 (FY 2022-2023)P52100034348 · Form 5 FY 22-23.pdf · uploaded 3 Oct 2026Source
- Form 5 (FY 2023-2024)P52100034348 · La Centra FORM-5 2023-24.pdf · uploaded 3 Oct 2026Source
- Form 2A (FY 2025-2026)P52100049554 · FORM2A FY 25-26.pdf · uploaded 3 Oct 2026Source
- Form 2A (FY 2026-2027)P52100049554 · FORM2A FY 25-26.pdf · uploaded 3 Oct 2026Source
Technical
- DocumentP52100034348 · 1_compressed.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 2.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 3.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 4.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 5.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 6.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 7.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 8.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 9.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 1_compressed.pdf · uploaded 23 Mar 2022Source
- DocumentP52100034348 · 1 (1).pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 2.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 3.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 4.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 5.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 6.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 7.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 8.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 9.pdf · uploaded 7 Oct 2022Source
- DocumentP52100034348 · 1-compressed.pdf · uploaded 22 Dec 2022Source
- DocumentP52100049554 · 6_compressed (1).pdf · uploaded 12 Jan 2023Source
- DocumentP52100049554 · 7_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentP52100049554 · 2_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 3_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 4_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 5_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 7_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 8_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 9_compressed.pdf · uploaded 18 Jan 2023Source
- DocumentP52100049554 · 10_compressed.pdf · uploaded 18 Jan 2023Source
- Other – TechnicalP52100049554 · Area Declaration.pdf · uploaded 20 Jan 2023Source
- Other – TechnicalP52100049554 · Rera Letter - La Centra.pdf · uploaded 2 Feb 2023Source
- DocumentP52100049554 · Layout-compressed Edited.pdf · uploaded 8 Feb 2023Source
- DocumentP52100034348 · 1_11zon Layout Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 2_11zon Basement plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 3_11zon Ground Floor Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 4_11zon 1st Floor Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 5_11zon 2nd Floor Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 6_11zon 3rd to 16 Floor Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 7_11zon 17 Floor Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 8_11zon Building Plan.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 9_11zon.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · 10_11zon.pdf · uploaded 13 Jun 2024Source
- DocumentP52100034348 · Layout Plan 1.pdf · uploaded 9 Jun 2026Source
- DocumentP52100049554 · Layout Plan.pdf · uploaded 30 Jun 2026Source
- OthersP52100049554 · DECLARATION ABOUT COMMENCEMENT LC 2.pdf · uploaded 30 Jun 2026Source
Technical (Architect)
- DocumentP52100034348 · F1 LC .pdf · uploaded 22 Oct 2024Source
- DocumentP52100049554 · F1 LC PH II.pdf · uploaded 22 Oct 2024Source
- DocumentP52100034348 · F1 La centra.pdf · uploaded 16 Jan 2025Source
- DocumentP52100049554 · F1 La centra ph II.pdf · uploaded 16 Jan 2025Source
- DocumentP52100034348 · LA CENTRA Form 1.pdf · uploaded 17 Apr 2025Source
- DocumentP52100049554 · LA CENTRA Phase 2 Form 1.pdf · uploaded 17 Apr 2025Source
- DocumentP52100034348 · FORM 1 _LC_.pdf · uploaded 16 Jul 2026Source
- DocumentP52100049554 · FORM 1_LA CENTRA PH II.pdf · uploaded 21 Aug 2026Source
Technical (Engineer)
- DocumentP52100049554 · F2 LA CENTRA PH II.pdf · uploaded 25 Oct 2024Source
- DocumentP52100034348 · F2 La Centra.pdf · uploaded 16 Jan 2025Source
- DocumentP52100049554 · F2 La Centra Ph II.pdf · uploaded 16 Jan 2025Source
- DocumentP52100034348 · F2 LC.pdf · uploaded 25 Apr 2025Source
- DocumentP52100049554 · F2 LC PH II.pdf · uploaded 25 Apr 2025Source
- DocumentP52100034348 · Form 2 LC .pdf · uploaded 16 Jul 2026Source
- DocumentP52100049554 · La Centra Phase II Form 2.pdf · uploaded 21 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Tathwade, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By S No 81 part
- South
- By S No 81 Part
- East
- By S No 82
- West
- By Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Kimaya Associates | — | P52100034348 |
| Architect | Kimaya Associates | — | P52100049554 |
| Chartered accountant | A S A K & Co | — | P52100049554 |
| Chartered accountant | A S A K & Co | — | P52100034348 |
| Chartered accountant | Mkgn & Associates | — | P52100034348 |
| Chartered accountant | Patel and Sharma | — | P52100034348 |
| Chartered accountant | Patel & Sharma | — | P52100049554 |
| Engineer | Mr. Premkumar Somani | — | P52100049554 |
Show all 11 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Engineer | Premkumar Somani | — | P52100034348 |
| Engineer | Ravindra Gaikwad | — | P52100049554 |
| Engineer | Ravindra Gaikwad | — | P52100034348 |
Source: MahaRERA project page. Contact details are not shown.