Pinnacle Neelanchal Phase III
Certificate SignedSus, Pune 411021 |Promoter: Pinnacle Vastunirman Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 3
- Unit types
- 2BHK, 3BHK188 units in all
- Address
- S No 19/1/2/3/4, 20/1, 20/2/1 & 20/2/2 &21/A/1, 21/A/2 & 21/B, Sus, Tal Mulshi, Dist Pune, Vibgyor School Road, SusPIN 411021
- Designated bank account
- 76
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2025
The latest completion date on record passed 10 months ago.
- Registered
- 3 Oct 2022
- Promised
- 31 Dec 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047091 | 3 Oct 2022 | 31 Dec 2025 | 31 Dec 2025 | Pinnacle Vastunirman Private Limited | Project page |
3 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Pinnacle Neelanchal Phase III Wing F | 14 | — |
| Pinnacle Neelanchal Phase III Wing G | 14 | 94 |
| Pinnacle Neelanchal Phase III Wing H | 14 | 94 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 188 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Pinnacle Neelanchal Phase III Wing G | 2BHK | 65.97 sq m · 710 sq ft | 86 | 0 |
| Pinnacle Neelanchal Phase III Wing G | 2BHK | 69.82 sq m · 752 sq ft | 8 | 0 |
| Pinnacle Neelanchal Phase III Wing H | 2BHK | 77.69 sq m · 836 sq ft | 42 | 0 |
| Pinnacle Neelanchal Phase III Wing H | 2BHK | 82.62 sq m · 889 sq ft | 4 | 0 |
| Pinnacle Neelanchal Phase III Wing H | 3BHK | 97.88 sq m · 1,054 sq ft | 44 | 0 |
| Pinnacle Neelanchal Phase III Wing H | 3BHK | 103.47 sq m · 1,114 sq ft | 4 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 238 filings listed on MahaRERA's project page
Finance
- PAN CardCompany Pan Card.pdf · uploaded 26 Jul 2022Source
Legal
- Declaration Form BForm-B_Neelanchal_PH3.pdf · uploaded 28 Jul 2022Source
- Legal Title reportNeelanchal Format A.pdf · uploaded 13 Sep 2022Source
- Legal Title report2016 Title Search Report 21A 2.pdf · uploaded 13 Sep 2022Source
- Legal Title report2016 Title Search Report 21A 1.pdf · uploaded 13 Sep 2022Source
- Legal Title report2.pdf · uploaded 13 Sep 2022Source
- Legal Title report4.pdf · uploaded 13 Sep 2022Source
Show all 239 documentsShow fewer documents
Legal
- Legal Title report5.pdf · uploaded 13 Sep 2022Source
- Legal Title report6.pdf · uploaded 13 Sep 2022Source
- Legal Title report7.pdf · uploaded 13 Sep 2022Source
- Legal Title report8.pdf · uploaded 13 Sep 2022Source
- Legal Title report8.pdf · uploaded 13 Sep 2022Source
- Legal Title report8.pdf · uploaded 13 Sep 2022Source
- Legal Title report8.pdf · uploaded 13 Sep 2022Source
- Legal Title report2016 Title Search.pdf · uploaded 13 Sep 2022Source
- Legal Title report2016 Title Search 21 B.pdf · uploaded 13 Sep 2022Source
Migrated
- 1 PAN CardCompany Pan Card.pdf · uploaded 26 Jul 2022Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 28 Jul 2022Source
- 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 28 Jul 2022Source
- 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 28 Jul 2022Source
- 4 Copy of Layout Approval (in case of layout)4.pdf · uploaded 28 Jul 2022Source
- 5 Copy of Layout Approval (in case of layout)5.pdf · uploaded 28 Jul 2022Source
- 6 Copy of Layout Approval (in case of layout)6.pdf · uploaded 28 Jul 2022Source
- 7 Copy of Layout Approval (in case of layout)7.pdf · uploaded 28 Jul 2022Source
- 8 Copy of Layout Approval (in case of layout)8.pdf · uploaded 28 Jul 2022Source
- 9 Copy of Layout Approval (in case of layout)9.pdf · uploaded 28 Jul 2022Source
- 10 Copy of Layout Approval (in case of layout)10.pdf · uploaded 28 Jul 2022Source
- 11 Copy of Layout Approval (in case of layout)11.pdf · uploaded 28 Jul 2022Source
- 12 Copy of Layout Approval (in case of layout)12.pdf · uploaded 28 Jul 2022Source
- 13 Copy of Layout Approval (in case of layout)13.pdf · uploaded 28 Jul 2022Source
- 14 Copy of Layout Approval (in case of layout)14.pdf · uploaded 28 Jul 2022Source
- 15 Copy of Layout Approval (in case of layout)15.pdf · uploaded 28 Jul 2022Source
- 16 Copy of Layout Approval (in case of layout)16.pdf · uploaded 28 Jul 2022Source
- 17 Copy of Layout Approval (in case of layout)17.pdf · uploaded 28 Jul 2022Source
- 18 Copy of Layout Approval (in case of layout)18.pdf · uploaded 28 Jul 2022Source
- 19 Copy of Layout Approval (in case of layout)19.pdf · uploaded 28 Jul 2022Source
- 20 Copy of Layout Approval (in case of layout)20.pdf · uploaded 28 Jul 2022Source
- 21 Copy of Layout Approval (in case of layout)21.pdf · uploaded 28 Jul 2022Source
- 22 Copy of Layout Approval (in case of layout)22.pdf · uploaded 28 Jul 2022Source
- 23 Copy of Layout Approval (in case of layout)23.pdf · uploaded 28 Jul 2022Source
- 24 Copy of Layout Approval (in case of layout)24.pdf · uploaded 28 Jul 2022Source
- 25 Copy of Layout Approval (in case of layout)25.pdf · uploaded 28 Jul 2022Source
- 26 Copy of Layout Approval (in case of layout)26.pdf · uploaded 28 Jul 2022Source
- 27 Copy of Layout Approval (in case of layout)27.pdf · uploaded 28 Jul 2022Source
- 28 Copy of Layout Approval (in case of layout)28.pdf · uploaded 28 Jul 2022Source
- 29 Copy of Layout Approval (in case of layout)29.pdf · uploaded 28 Jul 2022Source
- 30 Copy of Layout Approval (in case of layout)30.pdf · uploaded 28 Jul 2022Source
- 31 Copy of Layout Approval (in case of layout)31.pdf · uploaded 28 Jul 2022Source
- 32 Copy of Layout Approval (in case of layout)32.pdf · uploaded 28 Jul 2022Source
- 33 Copy of Layout Approval (in case of layout)33.pdf · uploaded 28 Jul 2022Source
- 34 Copy of Layout Approval (in case of layout)34.pdf · uploaded 28 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 28 Jul 2022Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 28 Jul 2022Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 28 Jul 2022Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 28 Jul 2022Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 28 Jul 2022Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 28 Jul 2022Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 28 Jul 2022Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 28 Jul 2022Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 28 Jul 2022Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 28 Jul 2022Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 28 Jul 2022Source
- 12 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 28 Jul 2022Source
- 13 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 28 Jul 2022Source
- 14 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 28 Jul 2022Source
- 15 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 28 Jul 2022Source
- 16 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 28 Jul 2022Source
- 17 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 28 Jul 2022Source
- 18 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 28 Jul 2022Source
- 19 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 28 Jul 2022Source
- 20 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 28 Jul 2022Source
- 21 Building Plan Approval / NA Order for plotted development21.pdf · uploaded 28 Jul 2022Source
- 22 Building Plan Approval / NA Order for plotted development22.pdf · uploaded 28 Jul 2022Source
- 23 Building Plan Approval / NA Order for plotted development23.pdf · uploaded 28 Jul 2022Source
- 24 Building Plan Approval / NA Order for plotted development24.pdf · uploaded 28 Jul 2022Source
- 25 Building Plan Approval / NA Order for plotted development25.pdf · uploaded 28 Jul 2022Source
- 26 Building Plan Approval / NA Order for plotted development26.pdf · uploaded 28 Jul 2022Source
- 27 Building Plan Approval / NA Order for plotted development27.pdf · uploaded 28 Jul 2022Source
- 28 Building Plan Approval / NA Order for plotted development28.pdf · uploaded 28 Jul 2022Source
- 29 Building Plan Approval / NA Order for plotted development29.pdf · uploaded 28 Jul 2022Source
- 30 Building Plan Approval / NA Order for plotted development30.pdf · uploaded 28 Jul 2022Source
- 31 Building Plan Approval / NA Order for plotted development31.pdf · uploaded 28 Jul 2022Source
- 32 Building Plan Approval / NA Order for plotted development32.pdf · uploaded 28 Jul 2022Source
- 33 Building Plan Approval / NA Order for plotted development33.pdf · uploaded 28 Jul 2022Source
- 34 Building Plan Approval / NA Order for plotted development34.pdf · uploaded 28 Jul 2022Source
- 1 Declaration about Commencement CertificateFormD_merged.pdf · uploaded 28 Jul 2022Source
- 1 Declaration in FORM BForm-B_Neelanchal_PH3.pdf · uploaded 28 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 28 Jul 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Jul 2022Source
- 1 CERSAI detailsCERSAI Search Report.pdf · uploaded 28 Jul 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Separate Bank Account.pdf · uploaded 29 Jul 2022Source
- 1 a Details of encumbrances concerned to FinanceDetails of Encubrance certifcate Finance.pdf · uploaded 23 Aug 2022Source
- 1 b Details of encumbrances concerned to LegalDetails of Encubrance certifcate legal.pdf · uploaded 23 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate (1).pdf · uploaded 23 Aug 2022Source
- 1 Proforma of Allotment letterAFS.pdf · uploaded 23 Aug 2022Source
- 2 Proforma of Allotment letterAllotment Letter-Pinnacle Neelanchal Phase III.pdf · uploaded 23 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 2 Sep 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation of Allotment Letter.pdf · uploaded 2 Sep 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation for AFS FINAL.pdf · uploaded 2 Sep 2022Source
- 1 Copy of the legal title reportNeelanchal Format A.pdf · uploaded 13 Sep 2022Source
- 2 Copy of the legal title report2016 Title Search Report 21A 2.pdf · uploaded 13 Sep 2022Source
- 3 Copy of the legal title report2016 Title Search Report 21A 1.pdf · uploaded 13 Sep 2022Source
- 4 Copy of the legal title report2.pdf · uploaded 13 Sep 2022Source
- 5 Copy of the legal title report4.pdf · uploaded 13 Sep 2022Source
- 6 Copy of the legal title report5.pdf · uploaded 13 Sep 2022Source
- 7 Copy of the legal title report6.pdf · uploaded 13 Sep 2022Source
- 8 Copy of the legal title report7.pdf · uploaded 13 Sep 2022Source
- 9 Copy of the legal title report8.pdf · uploaded 13 Sep 2022Source
- 10 Copy of the legal title report8.pdf · uploaded 13 Sep 2022Source
- 11 Copy of the legal title report8.pdf · uploaded 13 Sep 2022Source
- 12 Copy of the legal title report8.pdf · uploaded 13 Sep 2022Source
- 13 Copy of the legal title report2016 Title Search.pdf · uploaded 13 Sep 2022Source
- 14 Copy of the legal title report2016 Title Search 21 B.pdf · uploaded 13 Sep 2022Source
- Form 1FORM 1 Q3 FY 2023-24.pdf · uploaded 23 Jan 2026Source
- Form 1FORM 1 Q1 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 1FORM 1 Q2 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 1FORM 1 Q3 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 1FORM 1 Q4 FY 2023-24.pdf · uploaded 23 Jan 2026Source
- Form 2FORM 2 Q3 FY 2023-24.pdf · uploaded 23 Jan 2026Source
- Form 2FORM 2 Q1 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 2FORM 2 Q2 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 2FORM 2 Q3 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 2FORM 2 Q4 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 3FORM 3 Q3 FY 2023-24.pdf · uploaded 23 Jan 2026Source
- Form 3FORM 3 Q1 FY 2024-25_compressed.pdf · uploaded 23 Jan 2026Source
- Form 3FORM 3 Q2 FY 2024-25_compressed.pdf · uploaded 23 Jan 2026Source
- Form 3FORM 3 Q3 FY 2024-25_compressed.pdf · uploaded 23 Jan 2026Source
- Form 3FORM 3 Q4 FY 2024-25_compressed.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD_UNSOLD Q3 FY 2023-24.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD_UNSOLD Q1 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD_UNSOLD Q2 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD_UNSOLD Q3 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD_UNSOLD Q4 FY 2024-25.pdf · uploaded 23 Jan 2026Source
- Form 1FORM 1 Q1 23 24.pdf · uploaded 28 Jan 2026Source
- Form 1FORM 1 Q2 FY 2023-24.pdf · uploaded 28 Jan 2026Source
- Form 1FORM 1 Q4 FY 2023-24.pdf · uploaded 28 Jan 2026Source
- Form 1FORM 1 Q3 FY 2022-23.pdf · uploaded 28 Jan 2026Source
- Form 1FORM 1 Q4 FY 2022-23.pdf · uploaded 28 Jan 2026Source
- Form 2FORM 2 Q1 FY 2023-24.pdf · uploaded 28 Jan 2026Source
- Form 2FORM 2 Q2 FY 2023-24.pdf · uploaded 28 Jan 2026Source
- Form 2FORM 2 Q4 FY 2023-24.pdf · uploaded 28 Jan 2026Source
- Form 2FORM 2 Q3 FY 2022-23.pdf · uploaded 28 Jan 2026Source
- Form 2FORM 2 Q4 FY 2022-23.pdf · uploaded 28 Jan 2026Source
- Form 3FORM 3 Q1 23 24_compressed.pdf · uploaded 28 Jan 2026Source
- Form 3FORM3 PH 3 Q2 23 24_compressed.pdf · uploaded 28 Jan 2026Source
- Form 3FORM3 PH 3 Q4 23-24_compressed.pdf · uploaded 28 Jan 2026Source
- Form 3FORM3 PH 3 Q3 22-23_compressed.pdf · uploaded 28 Jan 2026Source
- Form 3FORM3 PH 3 Q4 22-23_compressed.pdf · uploaded 28 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Q1.pdf · uploaded 28 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Q2 23-24.pdf · uploaded 28 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Q4 23-24.pdf · uploaded 28 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Q3_compressed.pdf · uploaded 28 Jan 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Q4 22-23.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 1FORM 1 Q1 FY 2025-26_compressed.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1FORM 1 Q2 FY 2025-26.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2FORM2 Q1 FY 2025-26.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2FORM 2 Q2 FY 2025-26.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3FORM 3 Q1 FY 2025 26_compressed.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3FORM 3 Q1 FY 2025 26_compressed.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1FORM 1_compressed (1) (1).pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 3Form 3 Signed Phase III Q3_compressed.pdf · uploaded 6 Feb 2026Source
- Form 2A (FY 2022-2023)Q4 FY 2022-23.pdf · uploaded 11 Feb 2026Source
- Form 2A (FY 2023-2024)Q4 FY 2023-24.pdf · uploaded 11 Feb 2026Source
- Form 2A (FY 2024-2025)Q4 FY 2024-25.pdf · uploaded 11 Feb 2026Source
- Form 5 (FY 2022-2023)2022-23.pdf · uploaded 12 Feb 2026Source
- Form 5 (FY 2023-2024)2023-24.pdf · uploaded 12 Feb 2026Source
- Form 5 (FY 2024-2025)2024-25.pdf · uploaded 12 Feb 2026Source
Technical
- Document1.pdf · uploaded 28 Jul 2022Source
- Document2.pdf · uploaded 28 Jul 2022Source
- Document3.pdf · uploaded 28 Jul 2022Source
- Document4.pdf · uploaded 28 Jul 2022Source
- Document5.pdf · uploaded 28 Jul 2022Source
- Document6.pdf · uploaded 28 Jul 2022Source
- Document7.pdf · uploaded 28 Jul 2022Source
- Document8.pdf · uploaded 28 Jul 2022Source
- Document9.pdf · uploaded 28 Jul 2022Source
- Document10.pdf · uploaded 28 Jul 2022Source
- Document11.pdf · uploaded 28 Jul 2022Source
- Document12.pdf · uploaded 28 Jul 2022Source
- Document13.pdf · uploaded 28 Jul 2022Source
- Document14.pdf · uploaded 28 Jul 2022Source
- Document15.pdf · uploaded 28 Jul 2022Source
- Document16.pdf · uploaded 28 Jul 2022Source
- Document17.pdf · uploaded 28 Jul 2022Source
- Document18.pdf · uploaded 28 Jul 2022Source
- Document19.pdf · uploaded 28 Jul 2022Source
- Document20.pdf · uploaded 28 Jul 2022Source
- Document21.pdf · uploaded 28 Jul 2022Source
- Document22.pdf · uploaded 28 Jul 2022Source
- Document23.pdf · uploaded 28 Jul 2022Source
- Document24.pdf · uploaded 28 Jul 2022Source
- Document25.pdf · uploaded 28 Jul 2022Source
- Document26.pdf · uploaded 28 Jul 2022Source
- Document27.pdf · uploaded 28 Jul 2022Source
- Document28.pdf · uploaded 28 Jul 2022Source
- Document29.pdf · uploaded 28 Jul 2022Source
- Document30.pdf · uploaded 28 Jul 2022Source
- Document31.pdf · uploaded 28 Jul 2022Source
- Document32.pdf · uploaded 28 Jul 2022Source
- Document33.pdf · uploaded 28 Jul 2022Source
- Document34.pdf · uploaded 28 Jul 2022Source
- Document1.pdf · uploaded 28 Jul 2022Source
- Document2.pdf · uploaded 28 Jul 2022Source
- Document3.pdf · uploaded 28 Jul 2022Source
- Document4.pdf · uploaded 28 Jul 2022Source
- Document5.pdf · uploaded 28 Jul 2022Source
- Document6.pdf · uploaded 28 Jul 2022Source
- Document7.pdf · uploaded 28 Jul 2022Source
- Document8.pdf · uploaded 28 Jul 2022Source
- Document9.pdf · uploaded 28 Jul 2022Source
- Document10.pdf · uploaded 28 Jul 2022Source
- Document11.pdf · uploaded 28 Jul 2022Source
- Document12.pdf · uploaded 28 Jul 2022Source
- Document13.pdf · uploaded 28 Jul 2022Source
- Document14.pdf · uploaded 28 Jul 2022Source
- Document15.pdf · uploaded 28 Jul 2022Source
- Document16.pdf · uploaded 28 Jul 2022Source
- Document17.pdf · uploaded 28 Jul 2022Source
- Document18.pdf · uploaded 28 Jul 2022Source
- Document19.pdf · uploaded 28 Jul 2022Source
- Document20.pdf · uploaded 28 Jul 2022Source
- Document21.pdf · uploaded 28 Jul 2022Source
- Document22.pdf · uploaded 28 Jul 2022Source
- Document23.pdf · uploaded 28 Jul 2022Source
- Document24.pdf · uploaded 28 Jul 2022Source
- Document25.pdf · uploaded 28 Jul 2022Source
- Document26.pdf · uploaded 28 Jul 2022Source
- Document27.pdf · uploaded 28 Jul 2022Source
- Document28.pdf · uploaded 28 Jul 2022Source
- Document29.pdf · uploaded 28 Jul 2022Source
- Document30.pdf · uploaded 28 Jul 2022Source
- Document31.pdf · uploaded 28 Jul 2022Source
- Document32.pdf · uploaded 28 Jul 2022Source
- Document33.pdf · uploaded 28 Jul 2022Source
- Document34.pdf · uploaded 28 Jul 2022Source
Technical (Architect)
- DocumentFORM 1_compressed (1) (1).pdf · uploaded 6 Feb 2026Source
Technical (Engineer)
- DocumentFORM 2.pdf · uploaded 6 Feb 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Sus, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 24 M Government Road
- South
- Nala
- East
- Survey No 22 of Sus Village
- West
- Nala
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hrishikesh Kulkarni | — |
| Chartered accountant | CA Nikita A. Bajaj | — |
| Engineer | Mahesh Sidramappa Mashalkar | — |
| Engineer | Ranjit Dhobale | — |
| Other | Mahesh sidramappa Mashalkar | — |
Source: MahaRERA project page. Contact details are not shown.