Surabhi City Phase 1

Certificate Signed

Somatane, Pune 410506 |Promoter: Surabhi Group

Residential / Group HousingRERAP52100054701
6 Feb 2024Registered with MahaRERA
31 Dec 2030Promised completion
30 Apr 2031Revised completionPushed back 4 months
3Buildings
382Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
1BHK, 2BHK, 3BHK382 units in all
Address
Gat No 192, 193, 195, 196, 204, 206, 207, 208, 213, 214, 221, Somatane, SomatanePIN 410506
Designated bank account
43
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.69755, 73.68465
Surabhi City Phase 1 is at latitude 18.69755, longitude 73.68465.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
6 Feb 2024
Promised
31 Dec 2030
Revised
30 Apr 2031

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000547016 Feb 202431 Dec 203030 Apr 2031Surabhi GroupProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Building1696
B Building16128
C Building16158

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 382 units booked (0%), as the promoter reported to MahaRERA

1BHK · 126 units2BHK · 192 units3BHK · 64 units
BuildingTypeCarpet areaUnitsBooked
A Building1BHK37.9 sq m · 408 sq ft320
A Building2BHK53.1 sq m · 572 sq ft320
A Building2BHK63.12 sq m · 679 sq ft320
B Building1BHK37.9 sq m · 408 sq ft640
B Building2BHK53.1 sq m · 572 sq ft320
B Building2BHK63.12 sq m · 679 sq ft320
C Building1BHK37.1 sq m · 399 sq ft300
C Building2BHK63.16 sq m · 680 sq ft480
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
C Building2BHK63.57 sq m · 684 sq ft160
C Building3BHK73.39 sq m · 790 sq ft10
C Building3BHK83.05 sq m · 894 sq ft480
C Building3BHK83.52 sq m · 899 sq ft150

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 136 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN Card.pdf · uploaded 18 Oct 2023Source
  • PAN CardSelf Declaration.pdf · uploaded 4 Jan 2024Source
  • Other – FinanceSelf Declaration.pdf · uploaded 4 Jan 2024Source

Legal

  • Declaration Form BForm B.pdf · uploaded 18 Oct 2023Source
  • Legal Title reportTitle Search Report Annexure.pdf · uploaded 5 Jan 2024Source
  • Legal Title reportTitle Search Report.pdf · uploaded 5 Jan 2024Source
Show all 138 documentsShow fewer documents

Legal

  • Other – Legal1.pdf · uploaded 30 Jan 2024Source
  • Declaration Form BSelf Decleration.pdf · uploaded 24 Aug 2025Source

Migrated

  • 1 PAN CardPAN Card.pdf · uploaded 18 Oct 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance Certificate.pdf · uploaded 18 Oct 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance Certificate.pdf · uploaded 18 Oct 2023Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 18 Oct 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 18 Oct 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 18 Oct 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 18 Oct 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 18 Oct 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 18 Oct 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentPlan 6.pdf · uploaded 18 Oct 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentPlan 7.pdf · uploaded 18 Oct 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentPlan 8.pdf · uploaded 18 Oct 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 18 Oct 2023Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 18 Oct 2023Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 18 Oct 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 18 Oct 2023Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 18 Oct 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Letter - Allotment Letter.pdf · uploaded 18 Oct 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report - Agreement.pdf · uploaded 18 Oct 2023Source
  • 2 PAN CardSelf Declaration.pdf · uploaded 4 Jan 2024Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance Certificate.pdf · uploaded 4 Jan 2024Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance Certificate.pdf · uploaded 4 Jan 2024Source
  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 4 Jan 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 4 Jan 2024Source
  • 1 Proforma of Agreement for saleSample Agreement.pdf · uploaded 4 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account Details.pdf · uploaded 4 Jan 2024Source
  • 1 Other – FinanceSelf Declaration.pdf · uploaded 4 Jan 2024Source
  • 1 Copy of the legal title reportTitle Search Report Annexure.pdf · uploaded 5 Jan 2024Source
  • 2 Copy of the legal title reportTitle Search Report.pdf · uploaded 5 Jan 2024Source
  • 1 Other – Legal1.pdf · uploaded 30 Jan 2024Source
  • Form 1Surabhi City Phase I - Form 1 - 30-06-2025.pdf · uploaded 7 Aug 2025Source
  • Form 2Surabhi City Phase I - Form 2 - 30-06-2025.pdf · uploaded 7 Aug 2025Source
  • Form 3Surabhi City Phase I - Form 3 - 30-06-2025.pdf · uploaded 7 Aug 2025Source
  • Disclosure of Sold and Booked InventorySurabhi City Phase I - Disclosure of sold-Booked Inventory.pdf · uploaded 7 Aug 2025Source
  • Form 1Form 1 - Surabhi City Phase I as on March 2024.pdf · uploaded 27 Oct 2025Source
  • Form 1Form 1 - Surabhi City Phase 1 as on June 2024.pdf · uploaded 27 Oct 2025Source
  • Form 1Form 1 - Surabhi City Phase 1 as on Sep 2024.pdf · uploaded 27 Oct 2025Source
  • Form 1Form 1 - Surabhi City Phase 1 as on Dec 2024.pdf · uploaded 27 Oct 2025Source
  • Form 1Form 1 - Surabhi City Phase 1 as on March 2025.pdf · uploaded 27 Oct 2025Source
  • Form 2Form 2 - Surabhi City Phase I as on March 2024.pdf · uploaded 27 Oct 2025Source
  • Form 2Form 2 - Surabhi City Phase 1 as on June 2024.pdf · uploaded 27 Oct 2025Source
  • Form 2Form 2 - Surabhi City Phase 1 as on Sep 2024.pdf · uploaded 27 Oct 2025Source
  • Form 2Form 2 - Surabhi City Phase 1 as on Dec 2024.pdf · uploaded 27 Oct 2025Source
  • Form 2Form 2 - Surabhi City Phase 1 as on March 2025.pdf · uploaded 27 Oct 2025Source
  • Form 3Form 3 - Surabhi City Phase I as on March 2024.pdf · uploaded 27 Oct 2025Source
  • Form 3Form 3 - Surabhi City Phase 1 as on June 2024.pdf · uploaded 27 Oct 2025Source
  • Form 3Form 3 - Surabhi City Phase 1 as on Sep 2024.pdf · uploaded 27 Oct 2025Source
  • Form 3Form 3 - Surabhi City Phase 1 as on Dec 2024.pdf · uploaded 27 Oct 2025Source
  • Form 3Form 3 - Surabhi City Phase 1 as on March 2025.pdf · uploaded 27 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Surabhi City Phase I as on March 2024.pdf · uploaded 27 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Surabhi City Phase 1 as on June 2024.pdf · uploaded 27 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Surabhi City Phase 1 as on Sep 2024.pdf · uploaded 27 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Surabhi City Phase 1 as on Dec 2024.pdf · uploaded 27 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Surabhi City Phase 1 as on March 2025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 3 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 3 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 3 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2025.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Dec 2025.pdf · uploaded 18 Jan 2026Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Dec 2025.pdf · uploaded 18 Jan 2026Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Dec 2025.pdf · uploaded 18 Jan 2026Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 7 May 2026Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 7 May 2026Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on March 2026.pdf · uploaded 7 May 2026Source
  • Withdrawal Update Form 1Form1- Surbhi city phase -1 as on June 2026.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Surbhi city phase -1 as on June 2026.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Surbhi city phase -1 as on June 2026.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - Surabhi City Phase 1 as on Sep 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 2Form 2 - Surabhi City Phase 1 as on Sep 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 3Form 3 - Surabhi City Phase 1 as on Sep 2026.pdf · uploaded 12 Oct 2026Source

Technical

  • DocumentLayout.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 1.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 2.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 3.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 4.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 5.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 6.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 7.pdf · uploaded 18 Oct 2023Source
  • DocumentPlan 8.pdf · uploaded 18 Oct 2023Source
  • OthersSelf Decleration.pdf · uploaded 25 Aug 2025Source
  • DocumentPLAN 10_compressed.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 11.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 12_compressed.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 13.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 14.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 15.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 16.pdf · uploaded 23 Mar 2026Source
  • DocumentPLAN 17.pdf · uploaded 23 Mar 2026Source

Technical (Architect)

  • DocumentForm 1 - Surabhi City Phase 1 as on Sep 2026.pdf · uploaded 12 Oct 2026Source

Technical (Engineer)

  • DocumentForm 2 - Surabhi City Phase 1 as on Sep 2026.pdf · uploaded 12 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Somatane, Mawal taluka

Survey, CTS, gat or plot numbers

193195196204206207208213214221Gat No 192

Boundaries

North
Gat No 164 191 and 190
South
Gat No 233 210 and 212
East
Remaining Land in Gat No 164 191 190 221 215 Road
West
Gat No 197 203 and 205

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAshitosh Shinde—
Chartered accountantSuhas Sathe—
EngineerAswini Pol—
EngineerVijay Gadade—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology