Anusha
Certificate SignedPune (M Corp.), Pune 411004 |Promoter: Gokhale Spaces LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- —30 units in all
- Address
- 88A Erandwana, Prabhat Road, ErandwanaPIN 411004
- Designated bank account
- 171
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2025
The latest completion date on record passed 10 months ago.
- Registered
- 18 Feb 2021
- Promised
- 31 Dec 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100028360 | 18 Feb 2021 | 31 Dec 2025 | 31 Dec 2025 | Gokhale Spaces LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Anusha | 14 | 30 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
30 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 30 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 148 filings listed on MahaRERA's project page
Finance
- PAN Card2 - Gokhale Spaces LLP - PAN Card.pdf · uploaded 30 Dec 2020Source
Legal
Migrated
- 1 PAN Card2 - Gokhale Spaces LLP - PAN Card.pdf · uploaded 30 Dec 2020Source
- 1 Copy of the legal title reportAnusha Ttl report.pdf · uploaded 30 Dec 2020Source
- 1 Declaration in FORM BDeclaration-Anusha.pdf · uploaded 30 Dec 2020Source
- 1 Proforma of Allotment letterAnusha-Allotment letter.pdf · uploaded 30 Dec 2020Source
Show all 149 documentsShow fewer documents
Migrated
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Reg Certificate.PDF · uploaded 30 Dec 2020Source
- 2 Proforma of Allotment letterAnusha-Agreement-draft.pdf · uploaded 1 Jan 2021Source
- 1 Details of encumbrancesEncumbrance certificate.PDF · uploaded 7 Jan 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Anusha- RERA Form 1.pdf · uploaded 4 Feb 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 10 Feb 2021Source
- 1 Copy of Layout Approval (in case of layout)Sanctioned Plan 1.pdf · uploaded 13 Feb 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 1.pdf · uploaded 13 Feb 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 2.pdf · uploaded 13 Feb 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.PDF · uploaded 15 Feb 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentAnusha CC.pdf · uploaded 16 Feb 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Anusha.pdf · uploaded 30 Sep 2021Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Anusha.pdf · uploaded 30 Sep 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentRevised Sanction Plan 1-3_compressed.pdf · uploaded 18 Mar 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 18 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Anusha SIGNED.pdf · uploaded 30 Sep 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Anusha Form 3_compressed.pdf · uploaded 17 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ANUSHA.pdf · uploaded 2 Jun 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Anusha 31-03-2023.pdf · uploaded 27 Jun 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Anusha 31-03-2023.PDF · uploaded 12 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)6 Anusha.pdf · uploaded 30 Sep 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 30 06 2023.pdf · uploaded 23 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 30 09 2023.pdf · uploaded 23 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 31 12 2023.pdf · uploaded 23 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 30-09-2022.pdf · uploaded 6 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 31-12-2022.pdf · uploaded 6 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 31-03-2023.pdf · uploaded 6 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 30-06-2023.pdf · uploaded 6 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 30-09-2023.pdf · uploaded 6 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 31-12-2023.pdf · uploaded 6 Feb 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 31 03 2021.pdf · uploaded 9 Feb 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 31 12 2021.pdf · uploaded 9 Feb 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 31 03 2022.pdf · uploaded 9 Feb 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Anusha - 30 06 2022.pdf · uploaded 9 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ANUSHA Q1 2324.pdf · uploaded 23 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ANUSHA Q2 2324.pdf · uploaded 23 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ANUSHA Q3 2324.pdf · uploaded 23 Apr 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)GC_Anusha_Form 1_31032024.pdf · uploaded 30 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 31 03 2024 - Signed.pdf · uploaded 6 May 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 2 - Anusha - 31 12 2021.PDF · uploaded 2 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 31 03 2021.PDF · uploaded 2 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 31 03 2022.PDF · uploaded 2 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 30 06 2022.PDF · uploaded 2 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 30 09 2022.PDF · uploaded 2 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 31 12 2022.PDF · uploaded 2 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Anusha - 30 06 2024.PDF · uploaded 19 Jul 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Anusha 31032024.pdf · uploaded 25 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Anusha 30062024.pdf · uploaded 25 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Anusha.pdf · uploaded 25 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)1_compressed.pdf · uploaded 11 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 11 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted development1_compressed.pdf · uploaded 11 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 11 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted development3_compressed.pdf · uploaded 11 Jan 2025Source
- 4 Building Plan Approval / NA Order for plotted development4_compressed.pdf · uploaded 11 Jan 2025Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 11 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Anusha 30092024.pdf · uploaded 14 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Anusha 31122024.pdf · uploaded 14 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Anusha 31122024.pdf · uploaded 14 Feb 2025Source
- Form 1FORM 1 ARCHITECT CERTIFICATE DATED 30-03-2025.pdf · uploaded 25 Sep 2025Source
- Form 2FORM 2 ENGINEER CERTIFICATE DATED 30-03-2025.pdf · uploaded 25 Sep 2025Source
- Form 3FORM 3 CA CERTIFICATE DATED 30-03-2025.pdf · uploaded 25 Sep 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY DATED 30-03-2025.pdf · uploaded 25 Sep 2025Source
- Form 1FORM 1 ARCHITECT CERTIFICATE DATED 30-06-2025.pdf · uploaded 25 Sep 2025Source
- Form 2FORM 2 ENGINEER CERTIFICATE 30-06-2025.pdf · uploaded 25 Sep 2025Source
- Form 3FORM 3 CA CERTIFICATE DATED 30-06-2025.pdf · uploaded 25 Sep 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD INVENTORY DATED 30-06-2025.pdf · uploaded 25 Sep 2025Source
- Form 5 (FY 2024-2025)form 5 - Anusha.pdf · uploaded 1 Oct 2025Source
- Form 1Anusha - Form1- FY21-22 Q4- 31-03-2022.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY21-22 Q4- 31-03-2022.PDF · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY21-22 Q4- 31-03-2022.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory31-03-2022.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY20-21 Q3- 31-12-2021.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY21-22 Q3- 31-12-2021.PDF · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY21-22 Q3- 31-12-2021.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory31-12-2021.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY22-23 Q1- 30-06-2022.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY22-23 Q1- 30-6-2022.PDF · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY22-23 Q1- 30-06-2022.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory30-06-2022.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory30-09-2022.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY22-23 Q2- 30-09-2022.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY22-23 Q2- 30-09-2022.PDF · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY22-23 Q2- 30-09-2022.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY23-24 Q1- 30-06-2023.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY23-24 Q1- 30-06-2023.pdf · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY23-24 Q1- 30-06-2023.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory30-06-2023.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY23-24 Q2- 30-09-2023.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY23-24 Q2- 30-09-2023.pdf · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY23-24 Q2- 30-09-2023.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory30-09-2023.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory31-12-2023.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY23-24 Q3- 31-12-2023.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY23-24 Q3- 31-12-2023.pdf · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY23-24 Q3- 31-12-2023.pdf · uploaded 12 Jan 2026Source
- Disclosure of Sold and Booked Inventory31-12-24.pdf · uploaded 12 Jan 2026Source
- Form 1Anusha - Form1- FY24-25 Q3- 31-12-2024.pdf · uploaded 12 Jan 2026Source
- Form 2Anusha - Form2- FY24-25 Q3- 31-12-2024.pdf · uploaded 12 Jan 2026Source
- Form 3Anusha - Form3- FY24-25 Q3- 31-12-2024.pdf · uploaded 12 Jan 2026Source
- Form 2A (FY 2021-2022)2A Anusha 21-22 - Signed.pdf · uploaded 13 Jan 2026Source
- Form 1Anusha - Form1- FY23-24 Q4- 31-03-2024.pdf · uploaded 14 Jan 2026Source
- Form 2Anusha - Form2- FY23-24 Q4- 31-03-2024.pdf · uploaded 14 Jan 2026Source
- Form 3Anusha - Form3- FY23-24 Q4- 31-03-2024.pdf · uploaded 14 Jan 2026Source
- Disclosure of Sold and Booked Inventory31-03-2024.pdf · uploaded 14 Jan 2026Source
- Form 1Anusha - Form1- FY24-25 Q1- 30062024.pdf · uploaded 14 Jan 2026Source
- Form 2Anusha - Form2- FY24-25 Q1- 30062024.PDF · uploaded 14 Jan 2026Source
- Form 3Anusha - Form3- FY24-25 Q1- 30062024.pdf · uploaded 14 Jan 2026Source
- Disclosure of Sold and Booked Inventory30-06-20242024.pdf · uploaded 14 Jan 2026Source
- Form 1Anusha - Form1- FY24-25 Q2- 30092024.pdf · uploaded 14 Jan 2026Source
- Form 2Anusha - Form2- FY24-25 Q2- 30092024.pdf · uploaded 14 Jan 2026Source
- Form 3Anusha - Form3- FY24-25 Q2- 30092024.pdf · uploaded 14 Jan 2026Source
- Disclosure of Sold and Booked Inventory30-09-20242024.pdf · uploaded 14 Jan 2026Source
- Form 1Anusha - Form1- FY20-21 Q4- 31-3-21.pdf · uploaded 23 Jul 2026Source
- Form 2Anusha - Form2- FY20-21 Q4- 31-3-2021.PDF · uploaded 23 Jul 2026Source
- Form 3Anusha - Form3- FY20-21 Q4-31-03-2021.pdf · uploaded 23 Jul 2026Source
- Disclosure of Sold and Booked Inventory2021.pdf · uploaded 23 Jul 2026Source
- Form 5 (FY 2020-2021)Anusha 20-21.pdf · uploaded 23 Jul 2026Source
- Form 5 (FY 2021-2022)Anusha 21-22.pdf · uploaded 23 Jul 2026Source
- Form 5 (FY 2022-2023)Anusha 22-23.pdf · uploaded 23 Jul 2026Source
- Form 5 (FY 2023-2024)Anusha 23-24.pdf · uploaded 23 Jul 2026Source
- Form 2A (FY 2020-2021)SIGNED- Form 2A - ANUSHA - 2020-21.pdf · uploaded 25 Jul 2026Source
- Form 2A (FY 2022-2023)SIGNED Form 2A - ANUSHA - 2022-23.pdf · uploaded 25 Jul 2026Source
- Form 2A (FY 2023-2024)SIGNED-Form 2A - ANUSHA - 2023-24.pdf · uploaded 25 Jul 2026Source
- Form 2A (FY 2024-2025)SIGNED Form 2A - ANUSHA - 2024-25.pdf · uploaded 25 Jul 2026Source
- Form 2A (FY 2025-2026)SIGNED Form 2A - ANUSHA - 2025-26.pdf · uploaded 25 Jul 2026Source
- Form 5 (FY 2025-2026)14 Anusha pdf signed.pdf · uploaded 30 Sep 2026Source
Technical
- DocumentSanctioned Plan 1.pdf · uploaded 13 Feb 2021Source
- DocumentSanctioned Plan 1.pdf · uploaded 13 Feb 2021Source
- DocumentSanctioned Plan 2.pdf · uploaded 13 Feb 2021Source
- DocumentRevised Sanction Plan 1-3_compressed.pdf · uploaded 18 Mar 2022Source
- Document1_compressed.pdf · uploaded 11 Jan 2025Source
- Document1_compressed.pdf · uploaded 11 Jan 2025Source
- Document2_compressed.pdf · uploaded 11 Jan 2025Source
- Document3_compressed.pdf · uploaded 11 Jan 2025Source
- Document4_compressed.pdf · uploaded 11 Jan 2025Source
- Document5.pdf · uploaded 11 Jan 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pune (M Corp.), Pune City taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Road
- South
- Road
- East
- Remaining property out of F Plot No 88
- West
- Final Plot No 89
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ajay Amle | — |
| Architect | Siddharth Harischandrakar | — |
| Chartered accountant | Siddharth Smart | — |
| Chartered accountant | Varun Nimbolkar | — |
| Engineer | Mahesh Mate | — |
| Engineer | Vijendra Gaikwad | — |
Source: MahaRERA project page. Contact details are not shown.