Certificate SignedLavale, Pune 412115 |Promoter: Image Realty Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 4
- Phases
- 4
- Buildings
- 8
- Unit types
- 1BHK DuplexB, 1BHK DuplexE, 1BHK DuplexF, 3BHK B, 3BHK C, 3BHK F, 4BHK A, 4BHK B, 4BHK C, 4BHK DuplexA, 4BHK DuplexB, 1BHK Duplex C, 1BHK Duplex D, 2BHK A, 2BHK B, 2BHK C, 3BHK D, 3BHK E, 4BHK Duplex C, 4BHK Duplex D, 1BHK Duplex A, 1BHK Duplex B, 1BHK Duplex E, 3BHK A, 4BHK Duplex A, 4BHK Duplex B, Shop, 1BHK Duplex F, 1 BHK Duplex E, 1 BHK Duplex F543 units in all
- Address
- Gat No. 1659(Pt), 1660(Pt), OCR 1, Oxford City Township, LavalePIN 412115
- Designated bank account
- 85
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P52100052376- Registered
- 21 Aug 2023
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
Completion pushed back 4 months
P52100052531- Registered
- 8 Sep 2023
- Promised
- 31 Dec 2029
- Revised
- 30 Apr 2030
Completion pushed back 4 months
P52100052530- Registered
- 8 Sep 2023
- Promised
- 31 Dec 2029
- Revised
- 30 Apr 2030
Completion pushed back 4 months
P52100052522- Registered
- 8 Sep 2023
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
4 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052376 | 21 Aug 2023 | 31 Dec 2028 | 30 Apr 2029 | Image Realty Private Limited | Project page |
| P52100052531 | 8 Sep 2023 | 31 Dec 2029 | 30 Apr 2030 | Image Realty Private Limited | Project page |
| P52100052530 | 8 Sep 2023 | 31 Dec 2029 | 30 Apr 2030 | Image Realty Private Limited | Project page |
| P52100052522 | 8 Sep 2023 | 31 Dec 2028 | 30 Apr 2029 | Image Realty Private Limited | Project page |
8 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Tower- 1 | 22 | 58 |
| Tower- 2 | 22 | 73 |
| Tower- 3 | 22 | 73 |
| Tower- 4 | 22 | 63 |
| Tower- 5 | 23 | 61 |
| Tower- 6 | 23 | 77 |
| Tower- 7 | 23 | 77 |
| Tower- 8 | 23 | 61 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
368 of 543 units booked (68%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100052376 | Tower- 1 | 1BHK DuplexB | 60.63 sq m · 653 sq ft | 2 | 2 |
| P52100052376 | Tower- 1 | 1BHK DuplexE | 60.69 sq m · 653 sq ft | 2 | 2 |
| P52100052376 | Tower- 1 | 1BHK DuplexF | 60.63 sq m · 653 sq ft | 1 | 1 |
| P52100052376 | Tower- 1 | 3BHK B | 116.85 sq m · 1,258 sq ft | 10 | 10 |
| P52100052376 | Tower- 1 | 3BHK C | 117.4 sq m · 1,264 sq ft | 20 | 19 |
| P52100052376 | Tower- 1 | 3BHK F | 116.85 sq m · 1,258 sq ft | 1 | 1 |
| P52100052376 | Tower- 1 | 4BHK A | 183.01 sq m · 1,970 sq ft | 1 | 1 |
| P52100052376 | Tower- 1 | 4BHK B | 183.01 sq m · 1,970 sq ft | 5 | 5 |
Show all 82 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100052376 | Tower- 1 | 4BHK C | 183.46 sq m · 1,975 sq ft | 10 | 9 |
| P52100052376 | Tower- 1 | 4BHK DuplexA | 250.98 sq m · 2,702 sq ft | 2 | 1 |
| P52100052376 | Tower- 1 | 4BHK DuplexB | 251.1 sq m · 2,703 sq ft | 4 | 0 |
| P52100052376 | Tower- 2 | 1BHK Duplex C | 62.6 sq m · 674 sq ft | 1 | 1 |
| P52100052376 | Tower- 2 | 1BHK Duplex D | 62.6 sq m · 674 sq ft | 4 | 4 |
| P52100052376 | Tower- 2 | 2BHK A | 81.31 sq m · 875 sq ft | 2 | 2 |
| P52100052376 | Tower- 2 | 2BHK B | 80.31 sq m · 864 sq ft | 10 | 10 |
| P52100052376 | Tower- 2 | 2BHK C | 80.62 sq m · 868 sq ft | 20 | 20 |
| P52100052376 | Tower- 2 | 3BHK D | 117.45 sq m · 1,264 sq ft | 10 | 8 |
| P52100052376 | Tower- 2 | 3BHK E | 118.2 sq m · 1,272 sq ft | 20 | 16 |
| P52100052376 | Tower- 2 | 4BHK Duplex C | 249.24 sq m · 2,683 sq ft | 2 | 0 |
| P52100052376 | Tower- 2 | 4BHK Duplex D | 248.67 sq m · 2,677 sq ft | 4 | 0 |
| P52100052522 | Tower- 3 | 1BHK Duplex C | 62.6 sq m · 674 sq ft | 1 | 0 |
| P52100052522 | Tower- 3 | 1BHK Duplex D | 62.6 sq m · 674 sq ft | 4 | 4 |
| P52100052522 | Tower- 3 | 2BHK A | 81.31 sq m · 875 sq ft | 2 | 2 |
| P52100052522 | Tower- 3 | 2BHK B | 80.31 sq m · 864 sq ft | 10 | 10 |
| P52100052522 | Tower- 3 | 2BHK C | 80.62 sq m · 868 sq ft | 20 | 20 |
| P52100052522 | Tower- 3 | 3BHK D | 117.45 sq m · 1,264 sq ft | 10 | 9 |
| P52100052522 | Tower- 3 | 3BHK E | 118.2 sq m · 1,272 sq ft | 20 | 19 |
| P52100052522 | Tower- 3 | 4BHK Duplex C | 249.24 sq m · 2,683 sq ft | 2 | 0 |
| P52100052522 | Tower- 3 | 4BHK Duplex D | 248.67 sq m · 2,677 sq ft | 4 | 2 |
| P52100052522 | Tower- 4 | 1BHK Duplex A | 60.69 sq m · 653 sq ft | 1 | 1 |
| P52100052522 | Tower- 4 | 1BHK Duplex B | 60.63 sq m · 653 sq ft | 2 | 2 |
| P52100052522 | Tower- 4 | 1BHK Duplex E | 60.69 sq m · 653 sq ft | 2 | 2 |
| P52100052522 | Tower- 4 | 3BHK A | 117.71 sq m · 1,267 sq ft | 1 | 1 |
| P52100052522 | Tower- 4 | 3BHK B | 116.85 sq m · 1,258 sq ft | 10 | 4 |
| P52100052522 | Tower- 4 | 3BHK C | 117.4 sq m · 1,264 sq ft | 20 | 17 |
| P52100052522 | Tower- 4 | 4BHK A | 183.01 sq m · 1,970 sq ft | 1 | 1 |
| P52100052522 | Tower- 4 | 4BHK B | 183.01 sq m · 1,970 sq ft | 5 | 4 |
| P52100052522 | Tower- 4 | 4BHK C | 183.46 sq m · 1,975 sq ft | 10 | 9 |
| P52100052522 | Tower- 4 | 4BHK Duplex A | 250.98 sq m · 2,702 sq ft | 2 | 0 |
| P52100052522 | Tower- 4 | 4BHK Duplex B | 251.1 sq m · 2,703 sq ft | 4 | 1 |
| P52100052522 | Tower- 4 | Shop | 32.31 sq m · 348 sq ft | 3 | 0 |
| P52100052522 | Tower- 4 | Shop | 42.12 sq m · 453 sq ft | 2 | 0 |
| P52100052531 | Tower- 5 | 1BHK Duplex A | 60.63 sq m · 653 sq ft | 1 | 0 |
| P52100052531 | Tower- 5 | 1BHK Duplex C | 60.63 sq m · 653 sq ft | 2 | 2 |
| P52100052531 | Tower- 5 | 1BHK Duplex D | 60.69 sq m · 653 sq ft | 2 | 2 |
| P52100052531 | Tower- 5 | 3BHK A | 117.71 sq m · 1,267 sq ft | 1 | 0 |
| P52100052531 | Tower- 5 | 3BHK C | 117.71 sq m · 1,267 sq ft | 10 | 10 |
| P52100052531 | Tower- 5 | 3BHK D | 118.26 sq m · 1,273 sq ft | 22 | 20 |
| P52100052531 | Tower- 5 | 4BHK A | 183.01 sq m · 1,970 sq ft | 1 | 1 |
| P52100052531 | Tower- 5 | 4BHK B | 183.01 sq m · 1,970 sq ft | 5 | 4 |
| P52100052531 | Tower- 5 | 4BHK C | 183.46 sq m · 1,975 sq ft | 11 | 5 |
| P52100052531 | Tower- 5 | 4BHK Duplex A | 251.02 sq m · 2,702 sq ft | 2 | 1 |
| P52100052531 | Tower- 5 | 4BHK Duplex B | 250.45 sq m · 2,696 sq ft | 4 | 1 |
| P52100052531 | Tower- 6 | 1BHK Duplex E | 62.6 sq m · 674 sq ft | 1 | 0 |
| P52100052531 | Tower- 6 | 1BHK Duplex F | 62.6 sq m · 674 sq ft | 4 | 3 |
| P52100052531 | Tower- 6 | 2BHK A | 81.31 sq m · 875 sq ft | 2 | 1 |
| P52100052531 | Tower- 6 | 2BHK B | 80.31 sq m · 864 sq ft | 10 | 8 |
| P52100052531 | Tower- 6 | 2BHK C | 80.62 sq m · 868 sq ft | 22 | 6 |
| P52100052531 | Tower- 6 | 3BHK E | 117.63 sq m · 1,266 sq ft | 10 | 0 |
| P52100052531 | Tower- 6 | 3BHK F | 118.2 sq m · 1,272 sq ft | 22 | 2 |
| P52100052531 | Tower- 6 | 4BHK Duplex C | 249.24 sq m · 2,683 sq ft | 2 | 0 |
| P52100052531 | Tower- 6 | 4BHK Duplex D | 248.67 sq m · 2,677 sq ft | 4 | 0 |
| P52100052530 | Tower- 7 | 1 BHK Duplex E | 62.6 sq m · 674 sq ft | 1 | 1 |
| P52100052530 | Tower- 7 | 1 BHK Duplex F | 62.6 sq m · 674 sq ft | 4 | 4 |
| P52100052530 | Tower- 7 | 2BHK A | 81.31 sq m · 875 sq ft | 2 | 2 |
| P52100052530 | Tower- 7 | 2BHK B | 80.31 sq m · 864 sq ft | 10 | 7 |
| P52100052530 | Tower- 7 | 2BHK C | 80.62 sq m · 868 sq ft | 22 | 10 |
| P52100052530 | Tower- 7 | 3BHK E | 117.63 sq m · 1,266 sq ft | 10 | 6 |
| P52100052530 | Tower- 7 | 3BHK F | 118.2 sq m · 1,272 sq ft | 22 | 6 |
| P52100052530 | Tower- 7 | 4BHK Duplex C | 249.24 sq m · 2,683 sq ft | 2 | 0 |
| P52100052530 | Tower- 7 | 4BHK Duplex D | 248.67 sq m · 2,677 sq ft | 4 | 1 |
| P52100052530 | Tower- 8 | 1BHK Duplex B | 60.69 sq m · 653 sq ft | 1 | 0 |
| P52100052530 | Tower- 8 | 1BHK Duplex C | 60.63 sq m · 653 sq ft | 2 | 2 |
| P52100052530 | Tower- 8 | 1BHK Duplex D | 60.69 sq m · 653 sq ft | 2 | 2 |
| P52100052530 | Tower- 8 | 3BHK B | 117.71 sq m · 1,267 sq ft | 1 | 0 |
| P52100052530 | Tower- 8 | 3BHK C | 117.71 sq m · 1,267 sq ft | 10 | 7 |
| P52100052530 | Tower- 8 | 3BHK D | 118.26 sq m · 1,273 sq ft | 22 | 21 |
| P52100052530 | Tower- 8 | 4BHK A | 183.01 sq m · 1,970 sq ft | 1 | 1 |
| P52100052530 | Tower- 8 | 4BHK B | 183.01 sq m · 1,970 sq ft | 5 | 4 |
| P52100052530 | Tower- 8 | 4BHK C | 183.46 sq m · 1,975 sq ft | 11 | 5 |
| P52100052530 | Tower- 8 | 4BHK Duplex A | 251.02 sq m · 2,702 sq ft | 2 | 0 |
| P52100052530 | Tower- 8 | 4BHK Duplex B | 250.45 sq m · 2,696 sq ft | 4 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
4 documents held by Deedo, 505 filings listed on MahaRERA's project page
Registration certificate (4)
Show all 509 documentsShow fewer documents
Finance
Legal
- Other – LegalP52100052530 · 1 Other – Legal.pdf · uploaded 8 Aug 2023Source
- Other – LegalP52100052530 · 2 Other – Legal.pdf · uploaded 8 Aug 2023Source
- Other – LegalP52100052530 · 3 Other – Legal.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052530 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052530 · Dv14706 Legal Title Report - 1177_11zon.pdf · uploaded 8 Aug 2023Source
- Declaration Form BP52100052530 · Form B.pdf · uploaded 8 Aug 2023Source
- Other – LegalP52100052376 · POA.pdf · uploaded 8 Aug 2023Source
- Other – LegalP52100052376 · Share Sub Agg.pdf · uploaded 8 Aug 2023Source
- Other – LegalP52100052376 · Shareholder Agreement_11zon.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052376 · Final 1659 Title_11zon.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052376 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- Declaration Form BP52100052376 · Form B Signed.pdf · uploaded 8 Aug 2023Source
- Other – LegalP52100052531 · 1 Other – Legal.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052531 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052531 · Dv14706 Legal Title Report - 1177_11zon.pdf · uploaded 8 Aug 2023Source
- Declaration Form BP52100052531 · Form B.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052522 · Final 1659 Title_11zon.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052522 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- Declaration Form BP52100052522 · Form B.pdf · uploaded 8 Aug 2023Source
- Legal Title reportP52100052522 · Declaration_ Title Report.pdf · uploaded 22 Aug 2023Source
- Legal Title reportP52100052530 · Phase 4 - Declaration.pdf · uploaded 26 Aug 2023Source
- Legal Title reportP52100052531 · Phase 3 - Declaration.pdf · uploaded 26 Aug 2023Source
- Other – LegalP52100052522 · Phase 2 - Declaration.pdf · uploaded 26 Aug 2023Source
- Legal Title reportP52100052522 · Phase 2 - Declaration.pdf · uploaded 26 Aug 2023Source
- Legal Title reportP52100052530 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052530 · Addendum RERA Report-1177.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052376 · Addendum RERA Report-1659.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052376 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052531 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052531 · Addendum RERA Report-1177.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052522 · Addendum RERA Report-1659.pdf · uploaded 17 Feb 2024Source
- Legal Title reportP52100052522 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
Migrated
- 1 PAN CardP52100052530 · 1 PAN Card.pdf · uploaded 8 Aug 2023Source
- 1 Copy of the legal title reportP52100052530 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- 2 Copy of the legal title reportP52100052530 · Dv14706 Legal Title Report - 1177_11zon.pdf · uploaded 8 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052530 · encum legal.pdf · uploaded 8 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052530 · encum legal.pdf · uploaded 8 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052530 · Final Plan_11zon (1).pdf · uploaded 8 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052530 · Final Plan_11zon (1).pdf · uploaded 8 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052530 · Common.pdf · uploaded 8 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052530 · 47-93.pdf · uploaded 8 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100052530 · 48-93.pdf · uploaded 8 Aug 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100052530 · Part 1.pdf · uploaded 8 Aug 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100052530 · Part 2.pdf · uploaded 8 Aug 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100052530 · Part 3.pdf · uploaded 8 Aug 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100052530 · Part 4.pdf · uploaded 8 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052530 · CC_ 03 08 2023 (2).pdf · uploaded 8 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100052530 · Format DD.pdf · uploaded 8 Aug 2023Source
- 1 Declaration in FORM BP52100052530 · Form B.pdf · uploaded 8 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · Final CA Certificate Signed_11zon (1).pdf · uploaded 8 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052530 · 1 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Allotment letterP52100052530 · Allotment letter-OCR Phase 1B_ Project 4-Golfland VII and VIII.pdf · uploaded 8 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052530 · Format A.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052530 · Dev_Project 4.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052530 · 1-86 AFS_merged.pdf · uploaded 8 Aug 2023Source
- 1 Other – LegalP52100052530 · 1 Other – Legal.pdf · uploaded 8 Aug 2023Source
- 2 Other – LegalP52100052530 · 2 Other – Legal.pdf · uploaded 8 Aug 2023Source
- 3 Other – LegalP52100052530 · 3 Other – Legal.pdf · uploaded 8 Aug 2023Source
- 1 PAN CardP52100052376 · 1 PAN Card (5).pdf · uploaded 8 Aug 2023Source
- 1 Copy of the legal title reportP52100052376 · Final 1659 Title_11zon.pdf · uploaded 8 Aug 2023Source
- 2 Copy of the legal title reportP52100052376 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052376 · 1 a Details of encumbrances concerned to Finance (3).pdf · uploaded 8 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100052376 · 2 b Details of encumbrances concerned to Legal.pdf · uploaded 8 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052376 · 1 a Details of encumbrances concerned to Finance (3).pdf · uploaded 8 Aug 2023Source
- 2 b Details of encumbrances concerned to LegalP52100052376 · 2 b Details of encumbrances concerned to Legal.pdf · uploaded 8 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052376 · Copy of layout final_11zon (2).pdf · uploaded 8 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052376 · Copy of layout final_11zon (2).pdf · uploaded 8 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052376 · Common.pdf · uploaded 8 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052376 · 05-93.pdf · uploaded 8 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100052376 · 06-93.pdf · uploaded 8 Aug 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100052376 · Part 1 T1 T2.pdf · uploaded 8 Aug 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100052376 · Part 2 T1 T2.pdf · uploaded 8 Aug 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100052376 · Part 3 T1 T2.pdf · uploaded 8 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052376 · CC_ 03 08 2023 (2).pdf · uploaded 8 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100052376 · Format D Signed.pdf · uploaded 8 Aug 2023Source
- 1 Declaration in FORM BP52100052376 · Form B Signed.pdf · uploaded 8 Aug 2023Source
- 1 CERSAI detailsP52100052376 · 1 CERSAI details (1).pdf · uploaded 8 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052376 · Final Signed Form 3_11zon.pdf · uploaded 8 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052376 · Annexure A Signed.pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Allotment letterP52100052376 · 1 Proforma of Allotment letter (3).pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Agreement for saleP52100052376 · Final Agreement for Sale-Golfland I and II.pdf · uploaded 8 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052376 · 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same (2).pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052376 · Dev_ Project 1.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052376 · Dev AFS Ph 1_merged (1).pdf · uploaded 8 Aug 2023Source
- 1 Other – LegalP52100052376 · POA.pdf · uploaded 8 Aug 2023Source
- 2 Other – LegalP52100052376 · Share Sub Agg.pdf · uploaded 8 Aug 2023Source
- 3 Other – LegalP52100052376 · Shareholder Agreement_11zon.pdf · uploaded 8 Aug 2023Source
- 1 Other – TechnicalP52100052376 · 1 Other – Technical (1).pdf · uploaded 8 Aug 2023Source
- 1 PAN CardP52100052531 · 1 PAN Card.pdf · uploaded 8 Aug 2023Source
- 1 Copy of the legal title reportP52100052531 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- 2 Copy of the legal title reportP52100052531 · Dv14706 Legal Title Report - 1177_11zon.pdf · uploaded 8 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052531 · final plan_11zon.pdf · uploaded 8 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052531 · Common.pdf · uploaded 8 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052531 · 47-93.pdf · uploaded 8 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100052531 · 48-93.pdf · uploaded 8 Aug 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100052531 · Part 1.pdf · uploaded 8 Aug 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100052531 · Part 2.pdf · uploaded 8 Aug 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100052531 · Part 3.pdf · uploaded 8 Aug 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100052531 · Part 4.pdf · uploaded 8 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052531 · CC_ 03 08 2023 (2).pdf · uploaded 8 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100052531 · Format DD.pdf · uploaded 8 Aug 2023Source
- 1 Declaration in FORM BP52100052531 · Form B.pdf · uploaded 8 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052531 · Final CA Certificate Signed_11zon.pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Allotment letterP52100052531 · Allotment letter-OCR Phase 1B_ Project 3_Golfland V and VI.pdf · uploaded 8 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052531 · Format A.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052531 · Dev_Project 3.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052531 · Dev AFS 1-81_merged.pdf · uploaded 8 Aug 2023Source
- 1 Other – LegalP52100052531 · 1 Other – Legal.pdf · uploaded 8 Aug 2023Source
- 1 Other – TechnicalP52100052531 · ilovepdf_merged (3).pdf · uploaded 8 Aug 2023Source
- 1 PAN CardP52100052522 · 1 PAN Card (5).pdf · uploaded 8 Aug 2023Source
- 1 Copy of the legal title reportP52100052522 · Final 1659 Title_11zon.pdf · uploaded 8 Aug 2023Source
- 2 Copy of the legal title reportP52100052522 · Final 1660 Title_11zon.pdf · uploaded 8 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052522 · Finance Encum Golfland 3 and 4 final.pdf · uploaded 8 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100052522 · Encum legal.pdf · uploaded 8 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052522 · Finance Encum Golfland 3 and 4 final.pdf · uploaded 8 Aug 2023Source
- 2 b Details of encumbrances concerned to LegalP52100052522 · Encum legal.pdf · uploaded 8 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052522 · Plan_11zon.pdf · uploaded 8 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052522 · Common.pdf · uploaded 8 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052522 · 05-93.pdf · uploaded 8 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100052522 · 06-93.pdf · uploaded 8 Aug 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100052522 · Part 1.pdf · uploaded 8 Aug 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100052522 · Part 2.pdf · uploaded 8 Aug 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100052522 · Part 3.pdf · uploaded 8 Aug 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100052522 · Part 4.pdf · uploaded 8 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052522 · CC_ 03 08 2023 (2).pdf · uploaded 8 Aug 2023Source
- 1 Declaration about Commencement CertificateP52100052522 · Format DD.pdf · uploaded 8 Aug 2023Source
- 1 Declaration in FORM BP52100052522 · Form B.pdf · uploaded 8 Aug 2023Source
- 1 CERSAI detailsP52100052522 · Cersai Report Asset- Golfland 3 and 4.pdf · uploaded 8 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052522 · Final CA Signed_11zon.pdf · uploaded 8 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052522 · 1 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Allotment letterP52100052522 · Allotment letter-OCR Phase 1A_ Project 2-Golfland III and IV (1).pdf · uploaded 8 Aug 2023Source
- 1 Proforma of Agreement for saleP52100052522 · Final AFS.pdf · uploaded 8 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052522 · Format A.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052522 · Dev_Project 2.pdf · uploaded 8 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052522 · Proj 2 AFS Dev_merged.pdf · uploaded 8 Aug 2023Source
- 1 Other – TechnicalP52100052522 · Plot Area Dec_merged.pdf · uploaded 8 Aug 2023Source
- 2 Other – TechnicalP52100052376 · Golfland I and II CC confirmation.pdf · uploaded 11 Aug 2023Source
- 3 Copy of the legal title reportP52100052522 · Declaration_ Title Report.pdf · uploaded 22 Aug 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100052522 · Legal Encumbrance_ Project 2.pdf · uploaded 22 Aug 2023Source
- 3 b Details of encumbrances concerned to LegalP52100052522 · Legal Encumbrance_ Project 2.pdf · uploaded 22 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052522 · 1 Copy of Layout Approval (in case of layout) (48).pdf · uploaded 22 Aug 2023Source
- 2 Other – TechnicalP52100052522 · 2 Other – Technical (2).pdf · uploaded 22 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100052530 · All Documents_ Project 4_3-end.pdf · uploaded 23 Aug 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100052530 · Legal Encumbrance.pdf · uploaded 23 Aug 2023Source
- 2 b Details of encumbrances concerned to LegalP52100052530 · All Documents_ Project 4_3-end.pdf · uploaded 23 Aug 2023Source
- 3 b Details of encumbrances concerned to LegalP52100052530 · Legal Encumbrance.pdf · uploaded 23 Aug 2023Source
- 1 CERSAI detailsP52100052530 · Asset Based Search Report - v vi.pdf · uploaded 23 Aug 2023Source
- 1 Proforma of Agreement for saleP52100052530 · Final 1 Proforma of Agreement for sale_Golf Land 7 8_ SP (1).pdf · uploaded 23 Aug 2023Source
- 1 Other – TechnicalP52100052530 · output (1).pdf · uploaded 23 Aug 2023Source
- 2 Other – TechnicalP52100052530 · 2 Other – Technical (3).pdf · uploaded 23 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052531 · All Documents_ Project 3_4-4.pdf · uploaded 23 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100052531 · All Documents_ Project 3_5-end.pdf · uploaded 23 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052531 · All Documents_ Project 3_4-4.pdf · uploaded 23 Aug 2023Source
- 2 b Details of encumbrances concerned to LegalP52100052531 · All Documents_ Project 3_5-end.pdf · uploaded 23 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052531 · 1 Copy of Layout Approval (in case of layout) (49).pdf · uploaded 23 Aug 2023Source
- 1 CERSAI detailsP52100052531 · Asset Based Search Report - v vi.pdf · uploaded 23 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052531 · output (2) (3).pdf · uploaded 23 Aug 2023Source
- 1 Proforma of Agreement for saleP52100052531 · AFS-Golfland 5 and 6 (1)_SP.pdf · uploaded 23 Aug 2023Source
- 3 Copy of the legal title reportP52100052530 · Phase 4 - Declaration.pdf · uploaded 26 Aug 2023Source
- 2 CERSAI detailsP52100052530 · 2 CERSAI details.pdf · uploaded 26 Aug 2023Source
- 1 Other – FinanceP52100052530 · 2 CERSAI details.pdf · uploaded 26 Aug 2023Source
- 3 Copy of the legal title reportP52100052531 · Phase 3 - Declaration.pdf · uploaded 26 Aug 2023Source
- 2 CERSAI detailsP52100052531 · Phase 3 CERSAI.pdf · uploaded 26 Aug 2023Source
- 1 Other – FinanceP52100052531 · Phase 3 CERSAI.pdf · uploaded 26 Aug 2023Source
- 4 Copy of the legal title reportP52100052522 · Phase 2 - Declaration.pdf · uploaded 26 Aug 2023Source
- 2 CERSAI detailsP52100052522 · CERSAI - Phase 2.pdf · uploaded 26 Aug 2023Source
- 1 Other – LegalP52100052522 · Phase 2 - Declaration.pdf · uploaded 26 Aug 2023Source
- 1 Other – FinanceP52100052522 · CERSAI - Phase 2.pdf · uploaded 26 Aug 2023Source
- 2 Proforma of Allotment letterP52100052376 · Allotment letter-OCR Phase 1A-Golf-1.pdf · uploaded 11 Sep 2023Source
- 2 Proforma of Agreement for saleP52100052522 · AFS.pdf · uploaded 11 Sep 2023Source
- 4 a Details of encumbrances concerned to FinanceP52100052530 · Legal Encumbrance_ Project 4.pdf · uploaded 27 Sep 2023Source
- 4 b Details of encumbrances concerned to LegalP52100052530 · Legal Encumbrance_ Project 4.pdf · uploaded 27 Sep 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100052531 · Legal Encumbrance_Project 3.pdf · uploaded 27 Sep 2023Source
- 3 b Details of encumbrances concerned to LegalP52100052531 · Legal Encumbrance_Project 3.pdf · uploaded 27 Sep 2023Source
- 3 Proforma of Allotment letterP52100052376 · Allotment letter-Golfland I II.pdf · uploaded 4 Oct 2023Source
- 2 Proforma of Allotment letterP52100052522 · Allotment Letter Golfland III IV.pdf · uploaded 4 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · Architect Certificate_Sept 2023.pdf · uploaded 20 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Engineer Certificate_ Project_4.pdf · uploaded 20 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Engineer Certificate_Sept 2023.pdf · uploaded 20 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryP52100052530 · Sold Unsold Golfland VII and VIII.pdf · uploaded 20 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryP52100052522 · Sold Unsold Golfland III and IV.pdf · uploaded 30 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · Declaration Form I and II.pdf · uploaded 31 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Declaration Form I and II.pdf · uploaded 31 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryP52100052376 · Sold Unsold Golfland I and II.pdf · uploaded 31 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Declaration V and VI.pdf · uploaded 31 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Declaration V and VI.pdf · uploaded 31 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryP52100052531 · Sold-Unsold Inventory Golfland V and VI.pdf · uploaded 31 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · Declaration Form I and II.pdf · uploaded 31 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Sold Unsold Golfland III and IV.pdf · uploaded 31 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Sold Unsold Golfland III and IV.pdf · uploaded 31 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · Declaration_Dec 2023_Golfland VII and VIII.pdf · uploaded 23 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · Architect Certificate Golfland VII and VIII.pdf · uploaded 23 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052530 · Sold Unsold Units_Golfland VII and VIII.pdf · uploaded 23 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052376 · Sold Unsold Units_Golfland I and II.pdf · uploaded 23 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Declaration_Golfland V and VII.pdf · uploaded 23 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Declaration_Golfland V and VII.pdf · uploaded 23 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052531 · Sold Unsold Units Golfland V and VI.pdf · uploaded 23 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · Arch Cert Golfland VII and VIII.pdf · uploaded 7 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Golfland VII and VIII_Engi Cert.pdf · uploaded 7 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · Arch Cert Golfland I and II.pdf · uploaded 7 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Golfland I and II_Eng Cert.pdf · uploaded 7 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Arch Cert Golfland V and VI.pdf · uploaded 7 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Golfland V and VI_Eng Cert.pdf · uploaded 7 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · Arch Cert Golfland III and IV.pdf · uploaded 7 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Golfland III and IV_Eng Cert.pdf · uploaded 7 Feb 2024Source
- 4 Copy of the legal title reportP52100052530 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- 5 Copy of the legal title reportP52100052530 · Addendum RERA Report-1177.pdf · uploaded 17 Feb 2024Source
- 2 Proforma of Agreement for saleP52100052530 · AFS -Golfland 7 and 8- Post Demerger Amendment RERA Version.pdf · uploaded 17 Feb 2024Source
- 3 Copy of the legal title reportP52100052376 · Addendum RERA Report-1659.pdf · uploaded 17 Feb 2024Source
- 4 Copy of the legal title reportP52100052376 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- 2 Proforma of Agreement for saleP52100052376 · AFS -Golfland 1 and 2 - Post Demerger RERA Version.pdf · uploaded 17 Feb 2024Source
- 4 Copy of the legal title reportP52100052531 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- 5 Copy of the legal title reportP52100052531 · Addendum RERA Report-1177.pdf · uploaded 17 Feb 2024Source
- 2 Proforma of Agreement for saleP52100052531 · AFS -Golfland 5 and 6- Post Demerger Amendment RERA Version.pdf · uploaded 17 Feb 2024Source
- 5 Copy of the legal title reportP52100052522 · Addendum RERA Report-1659.pdf · uploaded 17 Feb 2024Source
- 6 Copy of the legal title reportP52100052522 · Addendum RERA Report-1660.pdf · uploaded 17 Feb 2024Source
- 3 Proforma of Agreement for saleP52100052522 · AFS -Golfland 3 and 4 - Post Demerger Amendment RERA Version.pdf · uploaded 17 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · Golfland I and II_22 02 2024.pdf · uploaded 9 Mar 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Golfland I and II 22 02 2024.pdf · uploaded 9 Mar 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · Golfland III and IV_22 02 2024.pdf · uploaded 9 Mar 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Golfland III and IV 22 02 2024.pdf · uploaded 9 Mar 2024Source
- 3 Other – TechnicalP52100052530 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- 3 Other – TechnicalP52100052376 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- 2 Other – TechnicalP52100052531 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- 3 Other – TechnicalP52100052522 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · Golfland VII and VIII.pdf · uploaded 18 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · Golfland I and II.pdf · uploaded 18 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Golfland 1.pdf · uploaded 18 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Golfland V and VI.pdf · uploaded 18 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · Golfland III and IV.pdf · uploaded 18 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Golfland 2.pdf · uploaded 18 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · Self Declaration for CA Certificate Golfland VII and VIII.pdf · uploaded 19 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052531 · Self Declaration for CA Certificate Golfland V and VI.pdf · uploaded 19 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052530 · Form 2A Golfland VII and VIII.pdf · uploaded 5 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052376 · Form 2A Golfland I and II.pdf · uploaded 5 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052531 · Form 2A Golfland V and VI.pdf · uploaded 5 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052522 · Form 2A Golfland III and IV.pdf · uploaded 5 Jul 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · 20231231 Form 3 Golfland VII and VIII.pdf · uploaded 21 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · 20240930 Form 3 Golfland VII and VIII.pdf · uploaded 21 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052376 · 20231231 Form 3 Golfland I and II.pdf · uploaded 21 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052376 · 20240219 Form 3 Golfland I and II.pdf · uploaded 21 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052376 · 20240930 Form 3 Golfland I and II.pdf · uploaded 21 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100052376 · Sold-Unsold Golfland I and II.pdf · uploaded 21 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052531 · 20231231 Form 3 Golfland V and VI.pdf · uploaded 21 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052531 · Sold-Unsold Inventory Golfland V and VI.pdf · uploaded 21 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052522 · 20231231 Form 3 Golfland III and IV.pdf · uploaded 21 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052522 · 20240219 Form 3 Golfland III and IV.pdf · uploaded 21 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052522 · 20240930 Form 3 Golfland III and IV.pdf · uploaded 21 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052530 · Form 5 OCR 1 T7 T8 Golf Lands VII and VIII.pdf · uploaded 10 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052531 · Form 5 OCR 1 T5 T6 Golf Lands V and VI.pdf · uploaded 10 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052522 · Form 5 OCR 1 T3 T4 Golf Lands III and IV.pdf · uploaded 10 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · Format_Progress Report_Dec 2024_Golfland VII and VIII.pdf · uploaded 9 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052530 · Sold-Unsold Inventory Golfland VII and VIII.pdf · uploaded 9 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052531 · Sold-Unsold Inventory Golfland V and VI.pdf · uploaded 9 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · MahaRERA Architect Certificate Golfland I and II Marxh 25.pdf · uploaded 7 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · MahaRERA Architect Certificate Golfland I and II 19 10 2024.pdf · uploaded 8 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · MahaRERA_Architect Certificate_Golfland I and II 21 01 2025.pdf · uploaded 8 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · MahaRERA Architect Certificate Golfland I and II 28 03 2025.pdf · uploaded 8 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052376 · Format_Progress Report_Mar 2025_Golfland I and II.pdf · uploaded 8 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052376 · MahaRERA_Architect Certificate_Golfland I and II 17 12 2024.pdf · uploaded 8 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052376 · 20250331 RERA Certificate OCR 1 T1_2 Golf Land I and II Form 3.pdf · uploaded 8 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Golfland I and II.pdf · uploaded 8 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Engineer Certificate_ Golfland I and II.pdf · uploaded 8 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Eng Cert Golfland I and II.pdf · uploaded 8 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Golfland I and II.pdf · uploaded 8 Apr 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052376 · Eng Cert Golfland I and II.pdf · uploaded 8 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · MahaRERA_Architect Certificate Golfland III and IV 19 10 2024.pdf · uploaded 8 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV 17 12 2024.pdf · uploaded 8 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV Certificate 21 01 2025.pdf · uploaded 8 Apr 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV 28 03 2025.pdf · uploaded 8 Apr 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052522 · Format_Progress Report_Mar 2025_Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052522 · Engineer Certificate_ Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Engineer Certificate_ Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Eng Cert Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052522 · Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052530 · Golfland VII and VIII.pdf · uploaded 21 Apr 2025Source
- 2 Disclosure of sold/ booked inventoryP52100052530 · Sold-Unsold Inventory Golfland VII and VIII.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052376 · Sold-Unsold Golfland I and II.pdf · uploaded 21 Apr 2025Source
- 2 Disclosure of sold/ booked inventoryP52100052376 · Sold-Unsold Golfland I and II.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052531 · Sold-Unsold Inventory Golfland V and VI.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052522 · Golfland III and IV.pdf · uploaded 21 Apr 2025Source
- 2 Disclosure of sold/ booked inventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 21 Apr 2025Source
- 3 Disclosure of sold/ booked inventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 21 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · MahaRERA_Architect Certificate_Golfland VII and VIII 28 03 2025.pdf · uploaded 13 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052530 · MahaRERA_Architect Certificate_Golfland VII and VIII 21 01 2025.pdf · uploaded 13 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · 20240331 RERA Certificate OCR 1 T7_8 Golf Land VII and VIII.pdf · uploaded 13 May 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · 20240930 Form 3 Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · 23 02 2025 RERA Certificate OCR 1 T7_8 Golf Land VII and VIII - RERA.pdf · uploaded 13 May 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052530 · 20250331 RERA Certificate OCR 1 T7_8 Golf Land VII and VIII Form 3.pdf · uploaded 13 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Golfland VII and VIII_Eng Cert.pdf · uploaded 13 May 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Engineer Certificate_ Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Eng Cert Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052530 · Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Golfland V and VI_Certificate_31 03 2024.pdf · uploaded 13 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Golfland V and VI.pdf · uploaded 13 May 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · MahaRERA_Architect Certificate Golfland V and VI 19 10 2024.pdf · uploaded 13 May 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Architect Cert Golfland V and VI.pdf · uploaded 13 May 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · Architect Certificate_Golfland V and VI 21 01 2025.pdf · uploaded 13 May 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052531 · MahaRERA_Architect Certificate_Golfland V and VI 28 03 2025.pdf · uploaded 13 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052531 · RERA Certificate OCR 1 T5_6 Golfland V and VI.pdf · uploaded 13 May 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052531 · 23 02 2025 RERA Certificate OCR 1 T5_6 Golf Land V and VI - RERA.pdf · uploaded 13 May 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052531 · 20250331 RERA Certificate OCR 1 T5_6 Golf Land V and VI Form 3.pdf · uploaded 13 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Golfland V and VI_Eng Cert.pdf · uploaded 13 May 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Golfland V and VI.pdf · uploaded 13 May 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Engineer Certificate_ Golfland V and VI.pdf · uploaded 13 May 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052531 · Golfland V and VI.pdf · uploaded 13 May 2025Source
- Form 1P52100052530 · Architect Certificate Golfland VII and VIII_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 2P52100052530 · Eng Cert Golfland VII and VIII_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 3P52100052530 · CA RERA Certificate OCR 1 T7_8 Golf Land VII and VIII.pdf · uploaded 15 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100052530 · Sold-Unsold Inventory Golfland VII and VIII.pdf · uploaded 15 Jul 2025Source
- Form 1P52100052376 · Architect Certificate Golfland I and II_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 2P52100052376 · Eng Cert Golfland I and II_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 3P52100052376 · CA Certificate OCR 1 T1_2 Golf Land I and II.pdf · uploaded 15 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100052376 · Sold-Unsold Golfland I and II.pdf · uploaded 15 Jul 2025Source
- Form 1P52100052531 · Architect Certificate Golfland V and VI_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 2P52100052531 · Eng Cert Golfland V and VI_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 3P52100052531 · CA Certificate OCR 1 T5_6 Golf Land V and VI.pdf · uploaded 15 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100052531 · Sold-Unsold Inventory Golfland V and VI.pdf · uploaded 15 Jul 2025Source
- Form 1P52100052522 · Architect Certificate Golfland III and IV _01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 2P52100052522 · Eng Cert Golfland III and IV_01 07 2025.pdf · uploaded 15 Jul 2025Source
- Form 3P52100052522 · CA Certificate OCR 1 T3_4 Golf Land III and IV.pdf · uploaded 15 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 15 Jul 2025Source
- Form 1P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV 28 03 2025.pdf · uploaded 26 Sep 2025Source
- Form 2P52100052522 · Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 3P52100052522 · 20250331 RERA Certificate OCR 1 T3_4 Golf Land III and IV Form 3.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 1P52100052522 · MahaRERA_Architect Certificate Golfland III and IV 19 10 2024.pdf · uploaded 26 Sep 2025Source
- Form 2P52100052522 · Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 3P52100052522 · 20240930 Form 3 Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 1P52100052522 · Architect Cert Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 2P52100052522 · Engineer Certificate_ Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 3P52100052522 · 20241231 RERA Certificate OCR 1 T3_4 Golf Land III & IV - RERA.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryP52100052522 · Sold-Unsold Golfland III and IV.pdf · uploaded 26 Sep 2025Source
- Form 5 (FY 2024-2025)P52100052530 · Form 5 OCR 1 T7_T8 Golf Lands VII & VIII.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2024-2025)P52100052376 · Form 5 OCR 1 T1_T2 Golf Lands I & II.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2024-2025)P52100052531 · Form 5 OCR 1 T5_T6 Golf Lands V & VI.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2024-2025)P52100052522 · Form 5 OCR 1 T3_T4 Golf Lands III & IV.pdf · uploaded 30 Sep 2025Source
- Form 1P52100052530 · Architect Certificate_OCR 1 T7 and T8.pdf · uploaded 20 Oct 2025Source
- Form 2P52100052530 · Golfland VII and VIII.pdf · uploaded 20 Oct 2025Source
- Form 3P52100052530 · 20250930 RERA Certificate OCR 1 T7_8 Golf Land VII & VIII - RERA.pdf · uploaded 20 Oct 2025Source
- Disclosure of Sold and Booked InventoryP52100052530 · Sold-Unsold Inventory Golfland VII and VIII.pdf · uploaded 20 Oct 2025Source
- Form 3P52100052376 · 20250930 RERA Certificate OCR 1 T1_2 Golf Land I & II - RERA.pdf · uploaded 20 Oct 2025Source
- Form 1P52100052376 · Architect Certificate_OCR 1 T1 and T2.pdf · uploaded 20 Oct 2025Source
- Form 2P52100052376 · Golfland I and II.pdf · uploaded 20 Oct 2025Source
- Disclosure of Sold and Booked InventoryP52100052376 · Sold-Unsold Golfland I & II.pdf · uploaded 20 Oct 2025Source
- Form 1P52100052531 · Architect Certificate_OCR 1 T5 and T6.pdf · uploaded 20 Oct 2025Source
- Form 2P52100052531 · Golfland V and VI.pdf · uploaded 20 Oct 2025Source
- Form 3P52100052531 · 20250930 RERA Certificate OCR 1 T5_6 Golf Land V & VI - RERA.pdf · uploaded 20 Oct 2025Source
- Disclosure of Sold and Booked InventoryP52100052531 · Sold-Unsold Inventory Golfland V and VI.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1P52100052530 · MahaRERA_Architect Certificate_Golfland VII and VIII_31 12 2025.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2P52100052530 · 31 12 2025 Engineer Certificate_ Golfland VII and VIII.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3P52100052530 · 20251231 RERA Certificate OCR 1 T7 and T8 Golf Land VII and VIII.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1P52100052376 · MahaRERA_Architect Certificate_Golfland I and II_31 12 2025.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2P52100052376 · 31 12 2025 Engineer Certificate_ Golfland I and II.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3P52100052376 · 20251231 RERA Certificate OCR 1 T1 and T2 Golf Land I and II.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1P52100052531 · MahaRERA_Architect Certificate_Golfland V and VI_31 12 2025.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2P52100052531 · Golfland V and VI_Eng Cert.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3P52100052531 · 20251231 RERA Certificate OCR 1 T5 and T6 Golf Land V and VI.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV_31 12 2025.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV_31 12 2025.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2P52100052522 · 31 12 2025 Engineer Certificate_ Golfland III and IV.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2P52100052522 · 31 12 2025 Engineer Certificate_ Golfland III and IV.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3P52100052522 · Architect Certificate_OCR 1 T3 and T4.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3P52100052522 · 20251231 RERA Certificate OCR 1 T3 and T4 Golf Land III and IV.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1P52100052530 · MahaRERA_Architect Certificate_Golfland VII and VIII_31 12 2025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2P52100052530 · 31 12 2025 Engineer Certificate_ Golfland VII and VIII.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3P52100052530 · 20251231 RERA Certificate OCR 1 T7 and T8 Golf Land VII and VIII.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1P52100052376 · MahaRERA_Architect Certificate_Golfland I and II_31 12 2025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2P52100052376 · 31 12 2025 Engineer Certificate_ Golfland I and II.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3P52100052376 · 20251231 RERA Certificate OCR 1 T1 and T2 Golf Land I and II.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1P52100052522 · MahaRERA_Architect Certificate_Golfland III and IV_31 12 2025.pdf · uploaded 5 Feb 2026Source
- Withdrawal Update Form 2P52100052522 · 31 12 2025 Engineer Certificate_ Golfland III and IV.pdf · uploaded 5 Feb 2026Source
- Withdrawal Update Form 3P52100052522 · 20250930 RERA Certificate OCR 1 T3 4 Golf Land III and IV.pdf · uploaded 5 Feb 2026Source
- Withdrawal Update Form 1P52100052530 · Architect Certificate Golfland VII and VIII Certificate 31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100052530 · Engineer Certificate Golfland VII and VIII 31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100052530 · 20260331 RERA Certificate OCR 1 T7 and 8 Golf Land VII and VIII.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100052376 · Architect Certificate Golfland I and II 31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100052376 · Engineer Certificate_Golfland I and II 31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100052376 · 20260331 RERA Certificate OCR 1 T1 Golf Land I and II.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100052531 · Architect Certificate Golfland V and VI Certificate 31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100052531 · Engineer Certificate Golfland V and VI 31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100052531 · 20260331 RERA Certificate OCR 1 T5 Golf Land V and VI.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100052522 · Engineer Certificate_Golfland III and IV_31 03 2026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100052522 · Eng Certificate Golfland III and IV.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100052522 · 20260331 RERA Certificate OCR 1 T3 Golf Land III and IV.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100052530 · architect certificates - Golfland VII VIII.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100052530 · Eng Certificates VII VIII 30 June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100052530 · CA RERA Certificate Golf Land VII VIII - RERA.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 1P52100052376 · architect certificates - Golfland I II.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100052376 · Eng Certificates I II 30 June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100052376 · CA RERA Certificate Golf Land I II - RERA.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 1P52100052531 · architect certificates - Golfland V VI.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100052531 · Eng Certificates V VI 30 June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100052531 · CA RERA Certificate Golf Land V VI - RERA.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 1P52100052522 · architect certificates - Golfland III IV.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100052522 · Eng Certificates III IV 30 June 2026.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100052522 · CA RERA Certificate Golf Land III IV - RERA.pdf · uploaded 21 Jul 2026Source
- Form 5 (FY 2025-2026)P52100052531 · P52100052531 Golfland V and VI.pdf · uploaded 24 Aug 2026Source
- Form 5 (FY 2025-2026)P52100052530 · P52100052530 Golfland VII and VIII.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100052376 · P52100052376 Golfland I and II.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100052522 · P52100052522 Golfland III and IV.pdf · uploaded 30 Sep 2026Source
Technical
- DocumentP52100052530 · Final Plan_11zon (1).pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · Final Plan_11zon (1).pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · Common.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · 47-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · 48-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · Part 1.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · Part 2.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · Part 3.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052530 · Part 4.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · Copy of layout final_11zon (2).pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · Copy of layout final_11zon (2).pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · Common.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · 05-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · 06-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · Part 1 T1 T2.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · Part 2 T1 T2.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052376 · Part 3 T1 T2.pdf · uploaded 8 Aug 2023Source
- Other – TechnicalP52100052376 · 1 Other – Technical (1).pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · final plan_11zon.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · Common.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · 47-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · 48-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · Part 1.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · Part 2.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · Part 3.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052531 · Part 4.pdf · uploaded 8 Aug 2023Source
- Other – TechnicalP52100052531 · ilovepdf_merged (3).pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · Common.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · 05-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · 06-93.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · Part 1.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · Part 2.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · Part 3.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · Part 4.pdf · uploaded 8 Aug 2023Source
- DocumentP52100052522 · Plan_11zon.pdf · uploaded 8 Aug 2023Source
- Other – TechnicalP52100052522 · Plot Area Dec_merged.pdf · uploaded 8 Aug 2023Source
- Other – TechnicalP52100052376 · Golfland I and II CC confirmation.pdf · uploaded 11 Aug 2023Source
- DocumentP52100052522 · 1 Copy of Layout Approval (in case of layout) (48).pdf · uploaded 22 Aug 2023Source
- Other – TechnicalP52100052522 · 2 Other – Technical (2).pdf · uploaded 22 Aug 2023Source
- Other – TechnicalP52100052530 · output (1).pdf · uploaded 23 Aug 2023Source
- Other – TechnicalP52100052530 · 2 Other – Technical (3).pdf · uploaded 23 Aug 2023Source
- DocumentP52100052531 · 1 Copy of Layout Approval (in case of layout) (49).pdf · uploaded 23 Aug 2023Source
- Other – TechnicalP52100052530 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- Other – TechnicalP52100052376 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- Other – TechnicalP52100052531 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
- Other – TechnicalP52100052522 · OCR -1_North Orientation.pdf · uploaded 14 Mar 2024Source
Technical (Architect)
- DocumentP52100052530 · Format_Progress Report_Dec 2024_Golfland VII and VIII.pdf · uploaded 9 Jan 2025Source
- DocumentP52100052376 · MahaRERA Architect Certificate Golfland I and II Marxh 25.pdf · uploaded 7 Apr 2025Source
- DocumentP52100052376 · MahaRERA Architect Certificate Golfland I and II 19 10 2024.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · MahaRERA_Architect Certificate_Golfland I and II 21 01 2025.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · MahaRERA Architect Certificate Golfland I and II 28 03 2025.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · Format_Progress Report_Mar 2025_Golfland I and II.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · MahaRERA_Architect Certificate Golfland III and IV 19 10 2024.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · MahaRERA_Architect Certificate_Golfland III and IV 17 12 2024.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · MahaRERA_Architect Certificate_Golfland III and IV Certificate 21 01 2025.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · MahaRERA_Architect Certificate_Golfland III and IV 28 03 2025.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · Format_Progress Report_Mar 2025_Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052530 · MahaRERA_Architect Certificate_Golfland VII and VIII 28 03 2025.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · MahaRERA_Architect Certificate_Golfland VII and VIII 21 01 2025.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Golfland V and VI_Certificate_31 03 2024.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Golfland V and VI.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · MahaRERA_Architect Certificate Golfland V and VI 19 10 2024.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Architect Cert Golfland V and VI.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Architect Certificate_Golfland V and VI 21 01 2025.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · MahaRERA_Architect Certificate_Golfland V and VI 28 03 2025.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · architect certificates - Golfland VII VIII.pdf · uploaded 21 Jul 2026Source
- DocumentP52100052376 · architect certificates - Golfland I II.pdf · uploaded 21 Jul 2026Source
- DocumentP52100052531 · architect certificates - Golfland V VI.pdf · uploaded 21 Jul 2026Source
- DocumentP52100052522 · architect certificates - Golfland III IV.pdf · uploaded 21 Jul 2026Source
Technical (Engineer)
- DocumentP52100052376 · Golfland I and II.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · Engineer Certificate_ Golfland I and II.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · Eng Cert Golfland I and II.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · Golfland I and II.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052376 · Eng Cert Golfland I and II.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · Engineer Certificate_ Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · Eng Cert Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052522 · Golfland III and IV.pdf · uploaded 8 Apr 2025Source
- DocumentP52100052530 · Golfland VII and VIII_Eng Cert.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · Engineer Certificate_ Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · Eng Cert Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · Golfland VII and VIII.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Golfland V and VI_Eng Cert.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Golfland V and VI.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Engineer Certificate_ Golfland V and VI.pdf · uploaded 13 May 2025Source
- DocumentP52100052531 · Golfland V and VI.pdf · uploaded 13 May 2025Source
- DocumentP52100052530 · Eng Certificates VII VIII 30 June 2026.pdf · uploaded 16 Jul 2026Source
- DocumentP52100052522 · Eng Certificates III IV 30 June 2026.pdf · uploaded 16 Jul 2026Source
- DocumentP52100052376 · Eng Certificates I II 30 June 2026.pdf · uploaded 21 Jul 2026Source
- DocumentP52100052531 · Eng Certificates V VI 30 June 2026.pdf · uploaded 21 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Lavale, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- OCR- 1Pt
- South
- 21Mtr Wide Road
- East
- Gat No- 1659 Pt
- West
- Golfland III
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Parag Deshpande | — | P52100052530 |
| Architect | Parag Deshpande | — | P52100052376 |
| Architect | Parag Deshpande | — | P52100052531 |
| Architect | Parag Deshpande | — | P52100052522 |
| Chartered accountant | Bhavesh Nagda | — | P52100052376 |
| Engineer | Ajit Kulkarni | — | P52100052522 |
| Engineer | Ajit Kulkarni | — | P52100052531 |
| Engineer | Ajit Kulkarni | — | P52100052530 |
Show all 11 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Engineer | Ajit Kulkarni | — | P52100052376 |
| Engineer | Ajit Suresh Kulkarni | — | P52100052376 |
| Engineer | Ajit Suresh Kulkarni | — | P52100052530 |
Source: MahaRERA project page. Contact details are not shown.