Anandtara Iris Residences Phase II
Certificate SignedKeshavnagar Mundwa, Pune 411036 |Promoter: Anandtara Infrastructure
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK37 units in all
- Address
- New survey No. 52/2, old Survey No. 52/4 Corresponding CTS No. 1938/2, Mundhwa road, KeshavnagarPIN 411036
- Designated bank account
- 87
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 14 Mar 2024
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100055274 | 14 Mar 2024 | 31 Dec 2026 | 31 Dec 2026 | Anandtara Infrastructure | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building B type | 14 | 37 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
2 of 37 units booked (5%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 46.38 sq m · 499 sq ft | 1 | 0 |
| 2BHK | 59.77 sq m · 643 sq ft | 18 | 1 |
| 2BHK | 61.75 sq m · 665 sq ft | 9 | 0 |
| 2BHK | 61.9 sq m · 666 sq ft | 9 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 154 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 13 Feb 2024Source
Legal
- Legal Title reportTITLE REPORT.pdf · uploaded 13 Feb 2024Source
- Declaration Form BOWNER DECLARATION FORM B.pdf · uploaded 13 Feb 2024Source
- Other – Legal20 R titile deed 2873 of 2020.pdf · uploaded 28 Feb 2024Source
- Other – Legal20 R title deed 2875 of 2020.pdf · uploaded 28 Feb 2024Source
- Declaration Form Bttile report as per new plan 1.pdf · uploaded 18 Dec 2025Source
Migrated
- 1 PAN CardPAN.pdf · uploaded 13 Feb 2024Source
Show all 155 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 13 Feb 2024Source
- 1 a Details of encumbrances concerned to FinanceDETAILS OF ENCUM.pdf · uploaded 13 Feb 2024Source
- 1 b Details of encumbrances concerned to LegalDETAILS OF ENCUM.pdf · uploaded 13 Feb 2024Source
- 1 Copy of Layout Approval (in case of layout)bp layout.pdf · uploaded 13 Feb 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentB type floor wise 6 of 9.pdf · uploaded 13 Feb 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentsection n elevation 7 of 9 WITH NOTE.pdf · uploaded 13 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentParking layout 2 of 9.pdf · uploaded 13 Feb 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentParking layout 3 of 9.pdf · uploaded 13 Feb 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentC C 2475.pdf · uploaded 13 Feb 2024Source
- 1 Declaration about Commencement CertificateCC DECLARATION.pdf · uploaded 13 Feb 2024Source
- 1 Declaration in FORM BOWNER DECLARATION FORM B.pdf · uploaded 13 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 13 Feb 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 13 Feb 2024Source
- 1 CERSAI detailsCERSAI UNDERTAKING.pdf · uploaded 13 Feb 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 13 Feb 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP ANNEXURE A.pdf · uploaded 13 Feb 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsR ANNEXURE A.pdf · uploaded 13 Feb 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsS ANNEXURE A.pdf · uploaded 13 Feb 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsV ANNEXURE A.pdf · uploaded 13 Feb 2024Source
- 1 Proforma of Agreement for saleagreement model copy.pdf · uploaded 13 Feb 2024Source
- 1 Proforma of Allotment letterallotment letter profarma.pdf · uploaded 13 Feb 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameseparate bank acc declaration.pdf · uploaded 13 Feb 2024Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION AL.pdf · uploaded 13 Feb 2024Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION AGR.pdf · uploaded 13 Feb 2024Source
- 1 Other – TechnicalANNEXURE A UNDERTAKING.pdf · uploaded 17 Feb 2024Source
- 2 Other – Technicaldeclaration regarding project area.pdf · uploaded 20 Feb 2024Source
- 1 Other – Legal20 R titile deed 2873 of 2020.pdf · uploaded 28 Feb 2024Source
- 2 Other – Legal20 R title deed 2875 of 2020.pdf · uploaded 28 Feb 2024Source
- 2 a Details of encumbrances concerned to FinanceENCUM OF LEGAL.pdf · uploaded 29 Feb 2024Source
- 2 b Details of encumbrances concerned to LegalENCUM OF LEGAL.pdf · uploaded 29 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 19 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2-_B_wing_ph2.pdf · uploaded 19 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)IRIS_form-3_Phase_II.pdf · uploaded 20 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form one of phase two.pdf · uploaded 1 Aug 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 PHASE II.pdf · uploaded 1 Aug 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 PHASE 2.pdf · uploaded 1 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 8 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 8 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 8 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentC C 1714 high lighted.pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmenthighlighted plan 1.pdf · uploaded 8 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentfloor plan highlighted.pdf · uploaded 8 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2 A.pdf · uploaded 8 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5.pdf · uploaded 8 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5.pdf · uploaded 8 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)REVISED FORM 3.pdf · uploaded 11 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 11 Oct 2024Source
- 1 Proforma of Agreement for salePHASE AGR UPLOADED AFTER REVISE PLAN.pdf · uploaded 18 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 phase II.pdf · uploaded 20 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)phase 2 form 1.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)phase 2 form 3.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)PHASE 2 FORM 2.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 PHASE 2.pdf · uploaded 23 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 PHASE 2.pdf · uploaded 23 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)phase 2 form 2.pdf · uploaded 23 Apr 2025Source
- Withdrawal Update Form 1FORM 1 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1FORM 1 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1FORM 1 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1FORM 1 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1FORM 1 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1FORM 1 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2FORM 2 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3FORM 3 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3FORM 3 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3FORM 3 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3FORM 3 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3FORM 3 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3FORM 3 PHASE 2.pdf · uploaded 31 Jul 2025Source
- Form 1form 1 phase 2.pdf · uploaded 6 Aug 2025Source
- Form 1FORM 1 PHASE 2.pdf · uploaded 6 Aug 2025Source
- Form 2Form_2-_B_wing_ph2.pdf · uploaded 6 Aug 2025Source
- Form 2phase 2 form 2.pdf · uploaded 6 Aug 2025Source
- Form 3FORM_3_PHASE_II.pdf · uploaded 6 Aug 2025Source
- Form 3FORM 3 PHASE 2.pdf · uploaded 6 Aug 2025Source
- Disclosure of Sold and Booked Inventorybook and sold form 3.pdf · uploaded 6 Aug 2025Source
- Disclosure of Sold and Booked Inventorybook and sold inventary.pdf · uploaded 6 Aug 2025Source
- Form 1form one of phase two.pdf · uploaded 3 Sep 2025Source
- Form 1PHASE I FORM 2.pdf · uploaded 3 Sep 2025Source
- Form 1PHASE 1 FORM 2.pdf · uploaded 3 Sep 2025Source
- Form 2FORM 2 PHASE II.pdf · uploaded 3 Sep 2025Source
- Form 2PHASE II FORM 2 SIGNED.pdf · uploaded 3 Sep 2025Source
- Form 2PHASE 2 FORM 2.pdf · uploaded 3 Sep 2025Source
- Form 3FORM 3 PHASE 2.pdf · uploaded 3 Sep 2025Source
- Form 3FORM 3 PHASE 2.pdf · uploaded 3 Sep 2025Source
- Form 3phase 2 form 3.pdf · uploaded 3 Sep 2025Source
- Disclosure of Sold and Booked InventoryAPR TO JUNE 24.pdf · uploaded 3 Sep 2025Source
- Disclosure of Sold and Booked InventoryJULY 2024 TO SEPT 2024.pdf · uploaded 3 Sep 2025Source
- Disclosure of Sold and Booked InventoryOCT 24 TO DEC 24.pdf · uploaded 3 Sep 2025Source
- Withdrawal Update Form 1phase 2 form 1.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 1phase 2 form 1.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 2Form_2-_ph_2_-_Q3_IRIS.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 2Form_2-_ph_2_-_Q3_IRIS.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 3form 3 phase 2.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 3form 3 phase 2.pdf · uploaded 9 Feb 2026Source
- Withdrawal Update Form 1phase 2 form 1.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 1phase 2 form 1.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 2Form_2-_ph_2_-_Q3_IRIS.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 2Form_2-_ph_2_-_Q3_IRIS.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 3form 3 phase 2.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 3form 3 phase 2.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 1phase 2 form 1.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 1phase 2 form 1.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 2phase 2 form 2.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 2phase 2 form 2.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 3phase 2 form 3.pdf · uploaded 13 May 2026Source
- Withdrawal Update Form 3phase 2 form 3.pdf · uploaded 13 May 2026Source
- Form 2A (FY 2025-2026)form 2A 2025 -2026 phase 2 latest format.pdf · uploaded 12 Jun 2026Source
Technical
- Documentbp layout.pdf · uploaded 13 Feb 2024Source
- Documentsection n elevation 7 of 9 WITH NOTE.pdf · uploaded 13 Feb 2024Source
- DocumentB type floor wise 6 of 9.pdf · uploaded 13 Feb 2024Source
- DocumentParking layout 2 of 9.pdf · uploaded 13 Feb 2024Source
- DocumentParking layout 3 of 9.pdf · uploaded 13 Feb 2024Source
- Other – TechnicalANNEXURE A UNDERTAKING.pdf · uploaded 17 Feb 2024Source
- Other – Technicaldeclaration regarding project area.pdf · uploaded 20 Feb 2024Source
- Documenthighlighted plan 1.pdf · uploaded 8 Oct 2024Source
- Documentfloor plan highlighted.pdf · uploaded 8 Oct 2024Source
- Documenthighlighted plan 1.pdf · uploaded 24 Jul 2025Source
- Documentrevised plan 3.pdf · uploaded 8 Aug 2025Source
- Documentfloor_plan_highlighted_2.pdf · uploaded 8 Aug 2025Source
- Documentrevised cc.pdf · uploaded 8 Aug 2025Source
- Documentrevised plan 3.pdf · uploaded 8 Aug 2025Source
- Documentnew cc.pdf · uploaded 8 Aug 2025Source
- Documentfloor_plan_highlighted_2.pdf · uploaded 8 Aug 2025Source
- Documentreccreational highlighted.pdf · uploaded 8 Aug 2025Source
- Documentsection and elecation 7.pdf · uploaded 8 Aug 2025Source
- Documentfloor plan highlighted.pdf · uploaded 12 Aug 2025Source
- Othersbook and sold.pdf · uploaded 29 Aug 2025Source
- OthersJAN TO MARCH 024.pdf · uploaded 3 Sep 2025Source
- OthersAPR TO JUNE 24.pdf · uploaded 3 Sep 2025Source
- OthersJULY 2024 TO SEPT 2024.pdf · uploaded 3 Sep 2025Source
- OthersOCT 24 TO DEC 24.pdf · uploaded 3 Sep 2025Source
- OthersJAN TO MARCH 025.pdf · uploaded 3 Sep 2025Source
- OthersAPR TO JUNE 025.pdf · uploaded 3 Sep 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Keshavnagar-Mundwa, Pune City taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Survey No 52 Hissa No 1
- South
- Survey No 52 Hissa No 3
- East
- Proposed building A
- West
- Proposed Building C
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Manoj Tatooskar | — |
| Chartered accountant | Harshalata M Patil | — |
| Chartered accountant | Pvc And Company Paras Vijapure | — |
| Engineer | Suhas Ashokrao Gaikwad | — |
Source: MahaRERA project page. Contact details are not shown.