Indraprasth
Certificate SignedInduri, Pune 410507 |Promoter: J V Buildcon
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 1RK, 2BHK23 units in all
- Address
- Cts No 318/1, Nr Kanifnath Mandir, IndoriPIN 410507
- Designated bank account
- 220
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 2 years
- Registered
- 9 Feb 2022
- Promised
- 31 Dec 2024
- Revised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033230 | 9 Feb 2022 | 31 Dec 2024 | 31 Dec 2026 | J V Buildcon | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Indraprasth | 4 | 23 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
14 of 23 units booked (61%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 35.86 sq m · 386 sq ft | 4 | 2 |
| 1BHK | 40.4 sq m · 435 sq ft | 3 | 1 |
| 1BHK | 40.48 sq m · 436 sq ft | 2 | 1 |
| 1BHK | 42.93 sq m · 462 sq ft | 1 | 1 |
| 1BHK | 47.69 sq m · 513 sq ft | 2 | 2 |
| 1BHK | 61.77 sq m · 665 sq ft | 2 | 1 |
| 1RK | 20.42 sq m · 220 sq ft | 5 | 3 |
| 1RK | 21.76 sq m · 234 sq ft | 2 | 2 |
| 1RK | 22.24 sq m · 239 sq ft | 1 | 0 |
| 2BHK | 61.19 sq m · 659 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 138 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 21 Jan 2022Source
Legal
- OtherLAND OWNER FORM B_compressed.pdf · uploaded 21 Jan 2022Source
- Legal Title reportSEARCH_compressed (1).pdf · uploaded 21 Jan 2022Source
- Legal Title reportDAPA.pdf · uploaded 21 Jan 2022Source
- Legal Title report7-12 OF SACHIN MARATHE LAND OWNER.pdf · uploaded 21 Jan 2022Source
- Declaration Form BFORM B DEVELOPERS_compressed.pdf · uploaded 21 Jan 2022Source
Show all 140 documentsShow fewer documents
Legal
- Declaration Form BFORM B.pdf · uploaded 9 Apr 2025Source
Migrated
- 1 PAN CardPAN.pdf · uploaded 21 Jan 2022Source
- 1 Copy of the legal title reportSEARCH_compressed (1).pdf · uploaded 21 Jan 2022Source
- 2 Copy of the legal title reportDAPA.pdf · uploaded 21 Jan 2022Source
- 3 Copy of the legal title report7-12 OF SACHIN MARATHE LAND OWNER.pdf · uploaded 21 Jan 2022Source
- 1 Details of encumbrancesENCMB.pdf · uploaded 21 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)layout.PDF · uploaded 21 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentsanction plan and layout.PDF · uploaded 21 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC_compressed (1).pdf · uploaded 21 Jan 2022Source
- 1 Declaration about Commencement Certificatedorm d.pdf · uploaded 21 Jan 2022Source
- 1 Declaration in FORM BFORM B DEVELOPERS_compressed.pdf · uploaded 21 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT.pdf · uploaded 21 Jan 2022Source
- 1 CERSAI detailsCERSAI FINAL.pdf · uploaded 21 Jan 2022Source
- 2 CERSAI detailsCERSAI.pdf · uploaded 21 Jan 2022Source
- 1 OtherLAND OWNER FORM B_compressed.pdf · uploaded 21 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 FINAL.pdf · uploaded 27 Jan 2022Source
- 1 Proforma of Allotment letteragreemnent final as per rera.pdf · uploaded 1 Feb 2022Source
- 1 Proforma of Agreement for saleagreement for sale.pdf · uploaded 21 Feb 2023Source
- 2 Proforma of Agreement for saleaxis 01.pdf · uploaded 21 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 MARCH 2022.pdf · uploaded 6 Mar 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 JUNE 2022.pdf · uploaded 6 Mar 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 SEP 2022.pdf · uploaded 6 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 DEC 2022.pdf · uploaded 6 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 31-03-2023.pdf · uploaded 6 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 30-06-2023.pdf · uploaded 6 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 31-03-2022_compressed.pdf · uploaded 6 Mar 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2 30-06-2022_compressed.pdf · uploaded 6 Mar 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 30-09-2022_compressed.pdf · uploaded 6 Mar 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 31-12-2022_compressed.pdf · uploaded 6 Mar 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 30-06-2023_compressed.pdf · uploaded 6 Mar 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 2 30-09-2023_compressed.pdf · uploaded 6 Mar 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 1 30-09-2023.pdf · uploaded 6 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)F 2 31-03-2023_compressed.pdf · uploaded 6 Mar 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)F 1 30-09-2023.pdf · uploaded 8 Mar 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q1 JAN-MAR 22.pdf · uploaded 12 Mar 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q2 APRIL-JUNE 22.pdf · uploaded 12 Mar 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q3 JULY-SEP 22.pdf · uploaded 12 Mar 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q4 OCT-DEC 22.pdf · uploaded 12 Mar 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q1 JAN-MAR 23.pdf · uploaded 12 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q2 APRIL-JUNE 23.pdf · uploaded 12 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q3 JULY-SEP 23.pdf · uploaded 12 Mar 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM NO 3 Q4 OCT-DEC 23.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM NO 5 2022-23.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FOR NO 5 2021-22.pdf · uploaded 12 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-12-23.pdf · uploaded 15 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)F 1 30-09-2023.pdf · uploaded 15 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM NO 1 31-3-2024.pdf · uploaded 24 Dec 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)form no 1.pdf · uploaded 24 Dec 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form no 2.pdf · uploaded 24 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2a.pdf · uploaded 24 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEP 2024.pdf · uploaded 19 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC 2024.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 2024.pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 1 MARCH 2024.pdf · uploaded 19 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Q_2 JUNE 2024_11zon.pdf · uploaded 19 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Q_2 SEP 2024_11zon.pdf · uploaded 19 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 _Q_4 DEC 2024_11zon.pdf · uploaded 19 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Q_1 MAR 2024_11zon.pdf · uploaded 19 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 July Sept 2024.pdf · uploaded 19 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 Oct dec 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q 2 April June 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q 1 Jan march 2024.pdf · uploaded 19 Feb 2025Source
- 1 Disclosure of sold/ booked inventory30-09-2022.pdf · uploaded 19 Feb 2025Source
- 2 Disclosure of sold/ booked inventory31-12-2022.pdf · uploaded 19 Feb 2025Source
- 3 Disclosure of sold/ booked inventory31-03-2023.pdf · uploaded 19 Feb 2025Source
- 4 Disclosure of sold/ booked inventory30-06-2023.pdf · uploaded 19 Feb 2025Source
- 5 Disclosure of sold/ booked inventory30-09-2023.pdf · uploaded 19 Feb 2025Source
- 6 Disclosure of sold/ booked inventory31-12-2023.pdf · uploaded 19 Feb 2025Source
- 7 Disclosure of sold/ booked inventory31-03-2024.pdf · uploaded 19 Feb 2025Source
- 8 Disclosure of sold/ booked inventory30-06-2024.pdf · uploaded 19 Feb 2025Source
- 9 Disclosure of sold/ booked inventory30-09-2024.pdf · uploaded 19 Feb 2025Source
- 10 Disclosure of sold/ booked inventory31-12-2024.pdf · uploaded 19 Feb 2025Source
- 1 a Details of encumbrances concerned to FinanceLEGAL.pdf · uploaded 9 Apr 2025Source
- 2 a Details of encumbrances concerned to FinanceFINANCIAL.pdf · uploaded 9 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)01 plan_11zon.pdf · uploaded 9 Apr 2025Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 9 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentLetter.pdf · uploaded 9 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted development02 plan_11zon.pdf · uploaded 9 Apr 2025Source
- 1 CERSAI detailsCERSAI.pdf · uploaded 9 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A BANK.pdf · uploaded 9 Apr 2025Source
- 1 Deviation Report with respect to Allotment letterALLOTMENT LETTER.pdf · uploaded 9 Apr 2025Source
- 1 b Details of encumbrances concerned to LegalLEGAL.pdf · uploaded 9 Apr 2025Source
- 2 b Details of encumbrances concerned to LegalFINANCIAL.pdf · uploaded 9 Apr 2025Source
- 1 Other – TechnicalANNEXURE A.pdf · uploaded 9 Apr 2025Source
- 1 Deviation Report with respect to model copy of AgreementDEVIGATION AGGREMENT.pdf · uploaded 9 Apr 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsREAL ESTATE.pdf · uploaded 9 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)arc 2024.pdf · uploaded 24 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)arc 2025.pdf · uploaded 24 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)eng 2025.pdf · uploaded 24 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC.pdf · uploaded 25 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 2025.pdf · uploaded 25 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_compressed (2).pdf · uploaded 25 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG.pdf · uploaded 25 Apr 2025Source
- 1 Disclosure of sold/ booked inventory10 Disclosure of sold_ booked inventory-1_page-0001.pdf · uploaded 25 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5.pdf · uploaded 25 Apr 2025Source
- Form 1f1 june.pdf · uploaded 26 Dec 2025Source
- Form 2f2 june.pdf · uploaded 26 Dec 2025Source
- Form 3f3 june.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysun june.pdf · uploaded 26 Dec 2025Source
- Form 1f1 sepyt.pdf · uploaded 26 Dec 2025Source
- Form 2f2 sep.pdf · uploaded 26 Dec 2025Source
- Form 3f3 sept.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysun sept.pdf · uploaded 26 Dec 2025Source
- Form 5 (FY 2024-2025)f5 2024 2025.pdf · uploaded 26 Dec 2025Source
- Form 2A (FY 2024-2025)20251229030412.pdf · uploaded 29 Dec 2025Source
- Occupational Certificateoc(1) (1)_page-0003.pdf · uploaded 17 Jan 2026Source
- Occupational CertificateMAIL SEND (2).pdf · uploaded 17 Jan 2026Source
Technical
Technical (Architect)
- DocumentF 1 30-09-2023.pdf · uploaded 15 Mar 2024Source
- DocumentFORM NO 1 31-3-2024.pdf · uploaded 24 Dec 2024Source
- Documentform no 1.pdf · uploaded 24 Dec 2024Source
- DocumentFORM 1 MARCH 2024.pdf · uploaded 19 Feb 2025Source
- DocumentFORM 1 JUNE 2024.pdf · uploaded 19 Feb 2025Source
- DocumentFORM 1 SEP 2024.pdf · uploaded 19 Feb 2025Source
- DocumentFORM 1 DEC 2024.pdf · uploaded 19 Feb 2025Source
- Documentarc 2024.pdf · uploaded 24 Apr 2025Source
- Documentarc 2025.pdf · uploaded 24 Apr 2025Source
- DocumentARC.pdf · uploaded 25 Apr 2025Source
- DocumentARC 2025.pdf · uploaded 25 Apr 2025Source
Technical (Engineer)
- DocumentF 1 30-09-2023.pdf · uploaded 8 Mar 2024Source
- Documentform no 2.pdf · uploaded 24 Dec 2024Source
- DocumentForm 2 Q 1 Jan march 2024.pdf · uploaded 19 Feb 2025Source
- DocumentForm 2 Q 2 April June 2024.pdf · uploaded 19 Feb 2025Source
- DocumentForm 2 Q3 July Sept 2024.pdf · uploaded 19 Feb 2025Source
- DocumentForm 2 Q4 Oct dec 2024.pdf · uploaded 19 Feb 2025Source
- Documenteng 2025.pdf · uploaded 24 Apr 2025Source
- DocumentENGG.pdf · uploaded 25 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Induri, Mawal taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 6 Mtr Road
- South
- S No 253
- East
- Cts No 318
- West
- Cts No 318
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shivanand Swami | — |
| Chartered accountant | sanjay w bhalerao | — |
| Chartered accountant | Swanand Vinayak Agashe | — |
| Engineer | Mr Amit Supekar | — |
| Engineer | Ravindra Karnavat | — |
| Engineer | Santosh Padsalge | — |
Source: MahaRERA project page. Contact details are not shown.