Radha Krishna Residency

Certificate Signed

Palghar 401404 |Promoter: Radha Krishna Realty

Residential / Group HousingRERAP99000020418
9 Apr 2019Registered with MahaRERA
30 Dec 2023Promised completion
31 Dec 2026Revised completionPushed back 3 years
2Buildings
81Units registered60 booked (74%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
1BHK, 2BHK81 units in all
Address
99/1 Pt, Mahim Road, TembhodePIN 401404
Designated bank account
82
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.69278, 72.75560
Radha Krishna Residency is at latitude 19.69278, longitude 72.75560.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 3 years

Registered
9 Apr 2019
Promised
30 Dec 2023
Revised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P990000204189 Apr 201930 Dec 202331 Dec 2026Radha Krishna RealtyProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
B No 1 Wing A B636
B No 3 Wing A B645

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

60 of 81 units booked (74%), as the promoter reported to MahaRERA

1BHK · 65 units2BHK · 16 units
BuildingTypeCarpet areaUnitsBooked
B No 1 Wing A B1BHK30.47 sq m · 328 sq ft30
B No 1 Wing A B1BHK30.52 sq m · 329 sq ft93
B No 1 Wing A B1BHK30.53 sq m · 329 sq ft10
B No 1 Wing A B1BHK30.99 sq m · 334 sq ft10
B No 1 Wing A B1BHK32.98 sq m · 355 sq ft44
B No 1 Wing A B1BHK33.2 sq m · 357 sq ft55
B No 1 Wing A B1BHK33.29 sq m · 358 sq ft51
B No 1 Wing A B1BHK33.65 sq m · 362 sq ft31
Show all 17 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B No 1 Wing A B2BHK50.59 sq m · 545 sq ft41
B No 1 Wing A B2BHK50.6 sq m · 545 sq ft10
B No 3 Wing A B1BHK30.52 sq m · 329 sq ft2525
B No 3 Wing A B1BHK30.53 sq m · 329 sq ft55
B No 3 Wing A B1BHK33.16 sq m · 357 sq ft11
B No 3 Wing A B1BHK33.41 sq m · 360 sq ft11
B No 3 Wing A B1BHK33.6 sq m · 362 sq ft22
B No 3 Wing A B2BHK45.72 sq m · 492 sq ft99
B No 3 Wing A B2BHK45.78 sq m · 493 sq ft22

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 157 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardCompany Pan Card.pdf · uploaded 6 Apr 2019Source

Legal

  • OtherD A PART 1.pdf · uploaded 6 Apr 2019Source
  • OtherD A PART 2.pdf · uploaded 6 Apr 2019Source
  • OtherPOA PART 1.pdf · uploaded 6 Apr 2019Source
  • OtherPOA PART 2.pdf · uploaded 6 Apr 2019Source
  • Legal Title reportTitle search report-Tembhode11.pdf · uploaded 6 Apr 2019Source
Show all 159 documentsShow fewer documents

Legal

  • Declaration Form BFORM B RKR.pdf · uploaded 6 Apr 2019Source
  • Declaration Form BAffidavit Cum Declaration Notarized.pdf · uploaded 19 Nov 2024Source
  • Declaration Form BAffidavit Cum Declaration Notarized.pdf · uploaded 19 Nov 2024Source

Migrated

  • 1 PAN CardCompany Pan Card.pdf · uploaded 6 Apr 2019Source
  • 1 Copy of the legal title reportTitle search report-Tembhode11.pdf · uploaded 6 Apr 2019Source
  • 1 Details of encumbrancesSELF NO ENCUMBERANCES RKR.pdf · uploaded 6 Apr 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 6 Apr 2019Source
  • 1 Building Plan Approval (IOD)B-1, Wing A.pdf · uploaded 6 Apr 2019Source
  • 2 Building Plan Approval (IOD)B-1, Wing B.pdf · uploaded 6 Apr 2019Source
  • 3 Building Plan Approval (IOD)B-3, Wing A.pdf · uploaded 6 Apr 2019Source
  • 4 Building Plan Approval (IOD)B-3, Wing B.pdf · uploaded 6 Apr 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 6 Apr 2019Source
  • 1 Declaration in FORM BFORM B RKR.pdf · uploaded 6 Apr 2019Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 6 Apr 2019Source
  • 1 Proforma of Allotment letterAGRREMENT FOR SALE RKR.pdf · uploaded 6 Apr 2019Source
  • 2 Proforma of Allotment letterALLOTMENT LETTER RKR.pdf · uploaded 6 Apr 2019Source
  • 1 OtherD A PART 1.pdf · uploaded 6 Apr 2019Source
  • 2 OtherD A PART 2.pdf · uploaded 6 Apr 2019Source
  • 3 OtherPOA PART 1.pdf · uploaded 6 Apr 2019Source
  • 4 OtherPOA PART 2.pdf · uploaded 6 Apr 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RKR Form-1.pdf · uploaded 7 Dec 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2-Cost Incurred Certificate- RKR.pdf · uploaded 30 Mar 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form2A-Quality Certificate RKR.pdf · uploaded 30 Mar 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 ARCHITECT CERTIFICATE.pdf · uploaded 25 Apr 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 ENGINEER CERTIFICATE.pdf · uploaded 25 Apr 2021Source
  • 2 Certificates of CA (Form 3)Form 3.pdf · uploaded 4 May 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form 2 Engineer's Certificate-RKR_31-03-21.pdf · uploaded 25 Jan 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2 Engineer's Certificate RKR-30-06-21.pdf · uploaded 25 Jan 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form 2 Engineer's Certificate-RKR_30-09-21.pdf · uploaded 25 Jan 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 Form 2 Engineer's Certificate-RKR_31-12-21.pdf · uploaded 25 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A for 31032021.pdf · uploaded 25 Jan 2022Source
  • 3 Certificates of CA (Form 3)FORM 3 31032021.pdf · uploaded 25 Jan 2022Source
  • 4 Certificates of CA (Form 3)FORM 3 30062021.pdf · uploaded 25 Jan 2022Source
  • 5 Certificates of CA (Form 3)FORM 3 30092021.pdf · uploaded 25 Jan 2022Source
  • 6 Certificates of CA (Form 3)FORM 3 31122021.pdf · uploaded 25 Jan 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)NA.pdf · uploaded 25 Jan 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)NA.pdf · uploaded 25 Jan 2022Source
  • 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 5 Feb 2022Source
  • 1 Disclosure of sold/ booked inventory30062021.pdf · uploaded 5 Feb 2022Source
  • 2 Disclosure of sold/ booked inventory30092021.pdf · uploaded 5 Feb 2022Source
  • 3 Disclosure of sold/ booked inventory31122021.pdf · uploaded 5 Feb 2022Source
  • 1 CERSAI detailsCersai.pdf · uploaded 5 Feb 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1.pdf · uploaded 23 Jul 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 22.pdf · uploaded 29 Jul 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MAR 22.pdf · uploaded 29 Jul 2022Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUNE 22.pdf · uploaded 29 Jul 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2 A MAR 22.pdf · uploaded 29 Jul 2022Source
  • 7 Certificates of CA (Form 3)FORM 3 MAR 22.pdf · uploaded 29 Jul 2022Source
  • 8 Certificates of CA (Form 3)Form 3 Jun22.pdf · uploaded 29 Jul 2022Source
  • 4 Disclosure of sold/ booked inventoryMARCH 22 INVENTORY.pdf · uploaded 4 Aug 2022Source
  • 5 Disclosure of sold/ booked inventoryJUNE 22 INVENTORY.pdf · uploaded 4 Aug 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Qtr 2.pdf · uploaded 31 Jan 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Qtr 3.pdf · uploaded 31 Jan 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Qtr 2.pdf · uploaded 31 Jan 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Qtr 3.pdf · uploaded 31 Jan 2023Source
  • 6 Disclosure of sold/ booked inventorySold AND Unsold Qtr 3.pdf · uploaded 31 Jan 2023Source
  • 9 Certificates of CA (Form 3)Sep22 Form 3.pdf · uploaded 31 Jan 2023Source
  • 10 Certificates of CA (Form 3)Dec 22 Form 3.pdf · uploaded 31 Jan 2023Source
  • 11 Certificates of CA (Form 3)uPDATED FORM 3.pdf · uploaded 3 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 RADHA KRISHNA 2020.pdf · uploaded 11 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 RADHA KRISHNA 2021.pdf · uploaded 11 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2122.pdf · uploaded 13 Feb 2023Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN FINAL.pdf · uploaded 22 Feb 2023Source
  • 5 Building Plan Approval (IOD)BUILDING PLANS-1-3.pdf · uploaded 22 Feb 2023Source
  • 6 Building Plan Approval (IOD)BUILDING PLANS-4.pdf · uploaded 22 Feb 2023Source
  • 7 Building Plan Approval (IOD)BUILDING PLANS-5 AND 6.pdf · uploaded 22 Feb 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC RADHA KRISHNA.pdf · uploaded 22 Feb 2023Source
  • 1 Proforma of Agreement for saleDraft Agreement.pdf · uploaded 22 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA FORM 5 2223.PDF · uploaded 15 Dec 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31032023 cOMPRESSED.pdf · uploaded 16 Jan 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Jun23_Compressed.pdf · uploaded 16 Jan 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Sep23_compressed.pdf · uploaded 16 Jan 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Dec23_compressed.pdf · uploaded 16 Jan 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 QTR 4 202223_COMPRESSED.pdf · uploaded 16 Jan 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Jun23_Compressed.pdf · uploaded 16 Jan 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Sep23_Compressed.pdf · uploaded 16 Jan 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Dec23_Compressed.pdf · uploaded 16 Jan 2024Source
  • 12 Certificates of CA (Form 3)Form 3 Signed_compressed.pdf · uploaded 16 Jan 2024Source
  • 13 Certificates of CA (Form 3)Form 3 June 23_Compressed.pdf · uploaded 16 Jan 2024Source
  • 14 Certificates of CA (Form 3)Form 3 Sep 23_compressed.pdf · uploaded 16 Jan 2024Source
  • 15 Certificates of CA (Form 3)Form 3 Dec 23_Compressed.pdf · uploaded 16 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A 2122 WITH SIGN.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A MAR 23.pdf · uploaded 18 Jan 2024Source
  • 7 Disclosure of sold/ booked inventory2A MAR 23.pdf · uploaded 18 Jan 2024Source
  • 8 Disclosure of sold/ booked inventoryDisclosure Jun23_compressed.pdf · uploaded 18 Jan 2024Source
  • 9 Disclosure of sold/ booked inventoryDisclosure Sep 23_compressed.pdf · uploaded 18 Jan 2024Source
  • 10 Disclosure of sold/ booked inventoryDisclosure Dec 23_compressed.pdf · uploaded 18 Jan 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Compressed.pdf · uploaded 27 Jul 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Compressed.pdf · uploaded 27 Jul 2024Source
  • 16 Certificates of CA (Form 3)FORM 3 Compressed.pdf · uploaded 27 Jul 2024Source
  • 1 Declaration in FORM BAffidavit Cum Declaration Notarized.pdf · uploaded 19 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2 A.pdf · uploaded 19 Nov 2024Source
  • 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 19 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 19 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INT.pdf · uploaded 19 Nov 2024Source
  • 1 Declaration in FORM BAffidavit Cum Declaration Notarized.pdf · uploaded 19 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 19 Nov 2024Source
  • 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 19 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INT.pdf · uploaded 19 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2 A.pdf · uploaded 19 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEP 24.pdf · uploaded 28 Dec 2024Source
  • 2 Certificates of CA (Form 3)FORM 3 JUNE 24_compressed.pdf · uploaded 28 Dec 2024Source
  • 3 Certificates of CA (Form 3)FORM 3 SEP 24_compressed.pdf · uploaded 28 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEP 24.pdf · uploaded 28 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2324_compressed.pdf · uploaded 28 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure Jun23_compressed.pdf · uploaded 17 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure Sep 23_compressed.pdf · uploaded 17 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC-24.pdf · uploaded 18 Jan 2025Source
  • 1 Certificates of CA (Form 3)FORM 3 DEC-24.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC-24.pdf · uploaded 18 Jan 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD DEC-24.pdf · uploaded 18 Jan 2025Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 18 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 QTR 4 2425.pdf · uploaded 16 May 2025Source
  • 1 Certificates of CA (Form 3)FORM 3 QTR 4 2425.pdf · uploaded 16 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 QTR 4 2425.pdf · uploaded 16 May 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD QTR 4 2425.pdf · uploaded 16 May 2025Source
  • Withdrawal Update Form 1FORM 1 QTR 2.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1FORM 1 QTR 3 .pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 Compressed.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 QTR 3.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Form 3 Qtr 2 compressed.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3FORM 3 QTR 3 compressed.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Form 1 qtr 4 RKR.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 2Form 2 QTR 4 RKR.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 3FORM 3 MAR 26.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 1Form 1 Architect Certificate RKR_r 14 30-06-2026.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2RKR FORM 2 QTR 1.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3RKR FORM 3 QTR 1.pdf · uploaded 12 Aug 2026Source

Technical

  • DocumentLayout.pdf · uploaded 6 Apr 2019Source
  • DocumentB-1, Wing A.pdf · uploaded 6 Apr 2019Source
  • DocumentB-1, Wing B.pdf · uploaded 6 Apr 2019Source
  • DocumentB-3, Wing A.pdf · uploaded 6 Apr 2019Source
  • DocumentB-3, Wing B.pdf · uploaded 6 Apr 2019Source
  • DocumentLAYOUT PLAN FINAL.pdf · uploaded 22 Feb 2023Source
  • DocumentBUILDING PLANS-1-3.pdf · uploaded 22 Feb 2023Source
  • DocumentBUILDING PLANS-4.pdf · uploaded 22 Feb 2023Source
  • DocumentBUILDING PLANS-5 AND 6.pdf · uploaded 22 Feb 2023Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 19 Nov 2024Source
  • DocumentFORM 1.pdf · uploaded 19 Nov 2024Source
  • DocumentFORM 1 SEP 24.pdf · uploaded 28 Dec 2024Source
  • DocumentFORM 1 DEC-24.pdf · uploaded 18 Jan 2025Source
  • DocumentFORM 1 QTR 4 2425.pdf · uploaded 16 May 2025Source
  • DocumentForm 1 Architect Certificate RKR_r 14 30-06-2026.pdf · uploaded 12 Aug 2026Source

Technical (Engineer)

  • DocumentFORM 2.pdf · uploaded 19 Nov 2024Source
  • DocumentFORM 2.pdf · uploaded 19 Nov 2024Source
  • DocumentFORM 2 SEP 24.pdf · uploaded 28 Dec 2024Source
  • DocumentFORM 2 DEC-24.pdf · uploaded 18 Jan 2025Source
  • DocumentFORM 2 QTR 4 2425.pdf · uploaded 16 May 2025Source
  • DocumentRKR FORM 2 QTR 1.pdf · uploaded 12 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Palghar, Palghar taluka

Survey, CTS, gat or plot numbers

99/1 PT

Boundaries

North
S No 99 H No 1 Pt
South
S No 99 H No 1pt
East
S No 99 H No 4
West
S No 86

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSanjay Maloo—
Chartered accountantVipul Jain—
EngineerVishnu Jadhav Of Supreme Engineering—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology