Skip to content

Dwarkadhish Nagar

Certificate Signed

Man, Palghar 401501 |Promoter: Shree Geetanjali Builders

24 May 2022Registered with MahaRERA
31 Mar 2028Promised completion
31 Jul 2028Revised completionPushed back 4 months
6Buildings
256Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
6
Unit types
—256 units in all
Address
Gat Number 159/2, Village Man, Chillar Road, ManPIN 401501
Designated bank account
171
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.53209, 72.85269
Dwarkadhish Nagar is at latitude 19.53209, longitude 72.85269.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
24 May 2022
Promised
31 Mar 2028
Revised
31 Jul 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P9900004548124 May 202231 Mar 202831 Jul 2028Shree Geetanjali BuildersProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building No 1742
Building No 2748
Building No 3761
Building No 4761
Building No 5743
Nil11

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

256 units registered

— · 256 units
BuildingTypeCarpet areaUnits
Building No 1——42
Building No 2——48
Building No 3——61
Building No 4——61
Building No 5——43
Nil——1

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 184 filings listed on MahaRERA's project page

Registration certificate

Legal

  • Legal Title reportLegal Tittle Report.pdf · uploaded 13 May 2022Source
  • Declaration Form BForm B Geetanjali Revised.pdf · uploaded 20 May 2022Source
  • Declaration Form BPartnership deed_compressed-compressed_11zon-compressed (1)_11zon.pdf · uploaded 20 May 2022Source
  • Other – LegalRetirement Deed SGB.pdf · uploaded 19 Feb 2024Source

Migrated

  • 1 Copy of the legal title reportLegal Tittle Report.pdf · uploaded 13 May 2022Source
  • 1 Details of encumbrancesNon Encumbrances Certificate.pdf · uploaded 13 May 2022Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT_scan0035_11zon.pdf · uploaded 13 May 2022Source
Show all 185 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentCC.pdf · uploaded 13 May 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentBN1_3_scan0038_11zon.pdf · uploaded 13 May 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentBN1_scan0036_11zon.pdf · uploaded 13 May 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentBN2_5_scan0039_11zon.pdf · uploaded 13 May 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentBN2_scan0037_11zon.pdf · uploaded 13 May 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentBN3_4_6_scan0040_11zon.pdf · uploaded 13 May 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentBN3_4_scan0034_11zon.pdf · uploaded 13 May 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentBN5_8_scan0042_11zon.pdf · uploaded 13 May 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentBN6_scan_11zon.pdf · uploaded 13 May 2022Source
  • 10 Building Plan Approval / NA Order for plotted developmentBN7_scan0033_11zon.pdf · uploaded 13 May 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 May 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form No 1 Skyline_compressed.pdf · uploaded 13 May 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 13 May 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_1.pdf · uploaded 13 May 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_2.pdf · uploaded 13 May 2022Source
  • 1 Proforma of Allotment letterDraft Letter of Allotment.pdf · uploaded 13 May 2022Source
  • 2 Proforma of Allotment letterDraft Sale Agreement.pdf · uploaded 13 May 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about CC Revised.pdf · uploaded 20 May 2022Source
  • 1 Declaration in FORM BForm B Geetanjali Revised.pdf · uploaded 20 May 2022Source
  • 2 Declaration in FORM BPartnership deed_compressed-compressed_11zon-compressed (1)_11zon.pdf · uploaded 20 May 2022Source
  • 1 CERSAI detailsAsset_CERSAI_Search_Report_200237718598_For_Asset_Based_Search_20_05_2022_12_48_11_105.pdf · uploaded 20 May 2022Source
  • 2 CERSAI detailsDebtor_CERSAI_Search_Report_200237719232_For_Debtor_Based_Search_20_05_2022_12_53_00_489.pdf · uploaded 20 May 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)artichitect certificate.pdf · uploaded 25 Nov 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer certificate.pdf · uploaded 25 Nov 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer certificate.pdf · uploaded 25 Nov 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA CACERTIFICATE_Singed.pdf · uploaded 25 Nov 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect Cetificate.pdf · uploaded 28 Jan 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.pdf · uploaded 28 Jan 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SHREEGEETANJALI Q3.pdf · uploaded 28 Jan 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 20 May 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE.pdf · uploaded 20 May 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 SHREEGEETANJALI Q4.pdf · uploaded 20 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)March.pdf · uploaded 29 Sep 2023Source
  • 1 Disclosure of sold/ booked inventoryRera Update Flat List Update 29-09-2023 1.pdf · uploaded 29 Sep 2023Source
  • 2 Disclosure of sold/ booked inventoryRera Update Flat List Update 29-09-2023 2.pdf · uploaded 29 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)geetanjali form 5.pdf · uploaded 29 Sep 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 14 Dec 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Consultant Certificate.pdf · uploaded 14 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Shree geetanjali.pdf · uploaded 14 Dec 2023Source
  • 1 Other – LegalRetirement Deed SGB.pdf · uploaded 19 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 9 Mar 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DWARKADHISH NAGAR.pdf · uploaded 9 Mar 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 9 Mar 2024Source
  • 1 Proforma of Agreement for salePROFORMA OF AGREEMENT FOR SALE.pdf · uploaded 4 May 2024Source
  • 3 Proforma of Allotment letterPROFORMA OF ALLOTMENT LETTER.pdf · uploaded 4 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineer Certificate 2024.pdf · uploaded 27 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 q4 fy 2023-24.pdf · uploaded 1 Aug 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 q4 fy 2023-24.pdf · uploaded 1 Aug 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 q4 fy 2023-24.pdf · uploaded 1 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 q1 fy2024-25.pdf · uploaded 15 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 15 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 shree geetanjali builders.pdf · uploaded 15 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect.pdf · uploaded 19 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 Shree Geetanjali.pdf · uploaded 19 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINNER CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 architect Q3 FY 24-25.pdf · uploaded 3 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 Q3 FY 24-25.pdf · uploaded 3 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINNER Q3 FY 24-25.pdf · uploaded 3 Feb 2025Source
  • Form 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 4 Aug 2025Source
  • Form 21 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 4 Aug 2025Source
  • Form 3RERA form 3 Q1.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory01_Q1 FY 2022-23 sold unsold.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1 Arcitect Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 2Form 2 Engineer certificate.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 RERA CACERTIFICATE_.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory02_Q2 FY 2022-23 sold unsold.pdf · uploaded 4 Aug 2025Source
  • Form 1architect Cetificate.pdf · uploaded 4 Aug 2025Source
  • Form 2Engineer's Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 3FORM 3 SHREEGEETANJALI Q3.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory03_Q3 FY 2022-23 unsold sold.pdf · uploaded 4 Aug 2025Source
  • Form 1Architect Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 2ENGINEER'S CERTIFICATE.pdf · uploaded 4 Aug 2025Source
  • Form 3form 3 SHREEGEETANJALI Q4.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory04_Q4 FY 2022-23.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1 Architect Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 2Form 2 Consultant Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 Shree geetanjali.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory06_Q2 FY 2023-24.pdf · uploaded 4 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 4 Aug 2025Source
  • Form 2FORM 2 DWARKADHISH NAGAR.pdf · uploaded 4 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory07_Q3 FY2023-24.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1 q4 fy 2023-24.pdf · uploaded 4 Aug 2025Source
  • Form 2Form 2 q4 fy 2023-24.pdf · uploaded 4 Aug 2025Source
  • Form 3Form 3 q4 fy 2023-24 orginal.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory08_Q4 FY 2023-24.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1.pdf · uploaded 4 Aug 2025Source
  • Form 2form 2.pdf · uploaded 4 Aug 2025Source
  • Form 3form 3 q1 fy2024-25.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory09_Q1 FY 2024-25.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1 Architect.pdf · uploaded 4 Aug 2025Source
  • Form 2Form 2 ENGINNER CERTIFICATE.pdf · uploaded 4 Aug 2025Source
  • Form 3form 3 Shree Geetanjali.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory10_Q2 FY 2024-25.pdf · uploaded 4 Aug 2025Source
  • Form 1Form 1 architect Q3 FY 24-25.pdf · uploaded 4 Aug 2025Source
  • Form 2Form 2 ENGINNER Q3 FY 24-25.pdf · uploaded 4 Aug 2025Source
  • Form 3form 3 Q3 FY 24-25.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory11_Q3 FY 2024-25.pdf · uploaded 4 Aug 2025Source
  • Form 1Architect Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 2RERA NEW FORMAT-13 Engineer Certificate.pdf · uploaded 4 Aug 2025Source
  • Form 3Rera form 3 SGB q4 FY 2024-25.pdf · uploaded 4 Aug 2025Source
  • Disclosure of Sold and Booked Inventory12_Q4 FY 2024-25.pdf · uploaded 4 Aug 2025Source
  • Form 5 (FY 2024-2025)Shree Geetaanjali builder FY 2024-25.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1Form 1 q1 fy2025-26.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 2Form 2 q1 fy2025-26.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 3Form 3 q1 fy2025-26.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 1RERA Form 1 Q2 Fy 2025-26.pdf · uploaded 13 Nov 2025Source
  • Withdrawal Update Form 2RERA Form 2 Q2 Fy 2025-26.pdf · uploaded 13 Nov 2025Source
  • Withdrawal Update Form 3Form3 Rera.pdf · uploaded 13 Nov 2025Source
  • Withdrawal Update Form 1Architecture Certificate.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 1Architecture Certificate.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 1Architecture Certificate.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2ENGINNER CERTIFICATE.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 3Form 3 (2).pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 25 Jun 2026Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 25 Jun 2026Source
  • Form 2A (FY 2022-2023)Engg- Cert- 22-23 27-Jun-2026 14-59-31.pdf · uploaded 27 Jun 2026Source
  • Form 2A (FY 2023-2024)23-24 27-Jun-2026 15-04-28.pdf · uploaded 27 Jun 2026Source
  • Form 2A (FY 2024-2025)24-25 27-Jun-2026 15-06-37.pdf · uploaded 27 Jun 2026Source
  • Form 2A (FY 2025-2026)25-26 27-Jun-2026 15-09-07.pdf · uploaded 27 Jun 2026Source
  • Form 5 (FY 2022-2023)geetanjali form 5.pdf · uploaded 27 Jun 2026Source
  • Form 5 (FY 2023-2024)Form 5 shree geetanjali builders.pdf · uploaded 27 Jun 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 3 Aug 2026Source
  • Form 5 (FY 2025-2026)FORM 5.pdf · uploaded 26 Sep 2026Source

Technical

  • DocumentLAYOUT_scan0035_11zon.pdf · uploaded 13 May 2022Source
  • DocumentCC.pdf · uploaded 13 May 2022Source
  • DocumentBN1_3_scan0038_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN1_scan0036_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN2_5_scan0039_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN2_scan0037_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN3_4_6_scan0040_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN3_4_scan0034_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN5_8_scan0042_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN6_scan_11zon.pdf · uploaded 13 May 2022Source
  • DocumentBN7_scan0033_11zon.pdf · uploaded 13 May 2022Source
  • Documentlayout plan sgb.pdf · uploaded 17 Dec 2025Source
  • Document4cdabddc-3070-429c-a66f-1c5e7bb0fab1.pdf · uploaded 31 Dec 2025Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 15 Oct 2024Source
  • DocumentForm 1 Architect.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 1 architect Q3 FY 24-25.pdf · uploaded 3 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 25 Jun 2026Source

Technical (Engineer)

  • Documentform 2.pdf · uploaded 15 Oct 2024Source
  • DocumentForm 2 ENGINNER CERTIFICATE.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 2 ENGINNER Q3 FY 24-25.pdf · uploaded 3 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 25 Jun 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Man, Palghar taluka

Survey, CTS, gat or plot numbers

Gat Number 159/2

Boundaries

North
Open Land
South
Chillar Road
East
Internal Village Raod
West
Petrol Pump

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSkyline Pouraj Kore—
Chartered accountantArti Parasnath Yadav—
Chartered accountantBharat Dhonde & Co—
Chartered accountantKalpana Manish Garg—
EngineerGanesh Balu Vartha Balu Vartha—
EngineerYogesh Vaza Darsh Consult—
OtherRanjeet Singh—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology