Shri Ganesh Castle Ph-2

Lapsed

Nashik Road, Nashik 422101 |Promoter: Viva Highways Limited

Residential / Group HousingRERAP51600016001
11 Apr 2018Registered with MahaRERA
30 Mar 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
2,340 sq m (25,188 sq ft)
Permissible built-up area
6,591 sq m (70,948 sq ft)
Sanctioned built-up area
1,669 sq m (17,960 sq ft)
Address
S. No. 11/1/1A/1 and Plot No. 1, S. No. 11/1/1A/3, Dasak Shiwar, Dasak ShiwarPIN 422101
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.97136, 73.83382
Shri Ganesh Castle Ph-2 is at latitude 19.97136, longitude 73.83382.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2024

The latest completion date on record passed 2 years and 7 months ago.

Registered
11 Apr 2018
Promised
30 Mar 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001600111 Apr 201830 Mar 2024—Viva Highways LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Wing18—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000015

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Wing

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & Footpaths0%
  • Internal Roads & Footpaths0%
  • Water Supply0%
  • Water Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank and Soak Pit0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank and Soak Pit0%
  • Storm Water Drains0%
  • Storm Water Drains0%
  • Landscaping & Tree Planting0%
  • Landscaping & Tree Planting0%
  • Street Lighting0%
  • Street Lighting0%
  • Community BuildingsNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0%
  • Water conservation /Rain water harvesting0%
  • Energy managemcntNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements0%
  • Fire protection and fire safety requirements0%
  • Electrical meter room, sub-station, receiving station0%
  • Electrical meter room, sub-station, receiving station0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking0%
  • Open Parking0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 36 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration in FORM BForm B - Affidavit-Ph-2-LowRes.pdf · uploaded 5 Apr 2018View
  • Copy of the legal title reportTitle Report-LowRes.pdf · uploaded 5 Apr 2018View
  • Details of encumbrancesAttach - 5 Encumbrances Ph - 2.pdf · uploaded 5 Apr 2018View
  • Copy of the legal title reportTitle Report 2-LowRes.pdf · uploaded 5 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentCommencement-Certificate.pdf · uploaded 5 Apr 2018View
  • Proforma of Allotment letterAttached - 6 Self Declaration Ph-2.pdf · uploaded 5 Apr 2018View
  • Copy of Layout Approval (in case of layout)Pg-1.pdf · uploaded 5 Apr 2018View
  • Building Plan Approval (IOD)Pg-1.pdf · uploaded 5 Apr 2018View
  • Building Plan Approval (IOD)Pg-2.pdf · uploaded 5 Apr 2018View
  • Building Plan Approval (IOD)Pg-3.pdf · uploaded 5 Apr 2018View
  • Building Plan Approval (IOD)Pg-4.pdf · uploaded 5 Apr 2018View
  • Building Plan Approval (IOD)Pg-5.pdf · uploaded 5 Apr 2018View
  • Building Plan Approval (IOD)Pg-6.pdf · uploaded 5 Apr 2018View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)VHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)VHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)VHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)VHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)VHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)VHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Status of ConveyanceVHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • OtherVHL Declaration SGC Ph2.PDF · uploaded 24 Feb 2020View
  • Details of encumbrancesSelf Declaration Encumbrances_1.PDF · uploaded 9 May 2022View
  • Declaration in FORM BSelf Declaration- federal bank affidavit.pdf · uploaded 9 May 2022View

Promoter documents

  • Declaration Form BForm B - Affidavit-Ph-2-LowRes.pdf · uploaded 5 Apr 2018View
  • Legal Title reportTitle Report-LowRes.pdf · uploaded 5 Apr 2018View
  • Legal Title reportTitle Report 2-LowRes.pdf · uploaded 5 Apr 2018View
  • Declaration Form BSelf Declaration- federal bank affidavit.pdf · uploaded 9 May 2022View

Technical documents

  • Layout ApprovalPg-1.pdfView
  • Building Plan ApprovalPg-1.pdfView
  • Building Plan ApprovalPg-2.pdfView
  • Building Plan ApprovalPg-3.pdfView
  • Building Plan ApprovalPg-4.pdfView
  • Building Plan ApprovalPg-5.pdfView
  • Building Plan ApprovalPg-6.pdfView

Other legal documents

  • OtherVHL Declaration SGC Ph2.PDFView

Proforma allotment letter

  • Proforma allotment letterAttached - 6 Self Declaration Ph-2.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik Road, Nashik taluka

Survey, CTS, gat or plot numbers

111/1/1A/111/1/1A/3Plot No. 1S. No. 11/1/1A/1S. No. 11/1/1A/3

As published on MahaRERA's project page

S. No. 11/1/1A/1 and Plot No. 1, S. No. 11/1/1A/3

Boundaries

North
Adj S No 11-1B-3
South
Adj S No 3A
East
30M Wide DP Road
West
Adj Plot No 3 and 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Vivek Jaykhedkar—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology