Vivek Park

Completed

Nashik 422003 |Promoter: Prathamesh Vivek Gangurde

Residential / Group HousingRERAP51600023541
18 Dec 2019Registered with MahaRERA
30 Dec 2023Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK16 units in all
Land area for this project
408 sq m (4,390 sq ft)
Permissible built-up area
678 sq m (7,299 sq ft)
Sanctioned built-up area
678 sq m (7,299 sq ft)
Address
Plot No. 3/4 S.no/G.no. 473/26 Adgaon, Konark Nagar 2, Adgaon NashikPIN 422003
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
18 Dec 2019
Promised
30 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002354118 Dec 201930 Dec 2023—Prathamesh Vivek GangurdeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vivek Park616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

2BHK · 16 units
TypeCarpet areaUnits
2BHK37.77 sq m · 407 sq ft4
2BHK39.07 sq m · 421 sq ft4
2BHK39.22 sq m · 422 sq ft4
2BHK39.45 sq m · 425 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000010
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vivek Park

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWILL OBTAIN FROM NMC0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK PROPOSED0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING PROPOSED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNO SEPARATE ROOM0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title report

Form B

Allotment letter

Encumbrance details

Commencement certificate

Form 1

Form 2

Occupancy / completion certificate

  • Occupancy / completion certificate13 Aug 2021ViewSource
Show all 42 documentsShow fewer documents

Form 4

Other (7)

Registration certificate

Layout plan

Building plan

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 12 Dec 2019View
  • Details of encumbrancesNo Encumbrance.pdf · uploaded 12 Dec 2019View
  • Copy of Layout Approval (in case of layout)Plot Layout.pdf · uploaded 12 Dec 2019View
  • Building Plan Approval / NA Order for plotted developmentSanctioned Plan.pdf · uploaded 12 Dec 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 12 Dec 2019View
  • Declaration in FORM BForm B.pdf · uploaded 12 Dec 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 12 Dec 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 12 Dec 2019View
  • Proforma of Allotment letterAgreement For Sale.pdf · uploaded 12 Dec 2019View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 12 Dec 2019View
  • OtherCREDAI.pdf · uploaded 12 Dec 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 13 Aug 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 13 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 13 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration_1.pdf · uploaded 13 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration_2.pdf · uploaded 13 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Aug 2021View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 12 Dec 2019View
  • Declaration Form BForm B.pdf · uploaded 12 Dec 2019View

Technical documents

  • Layout ApprovalPlot Layout.pdfView
  • Building Plan ApprovalSanctioned Plan.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

3/4PLOT NO. 3/4 S.NO/G.NO. 473/26 ADGAON

As published on MahaRERA's project page

PLOT NO. 3/4 S.NO/G.NO. 473/26 ADGAON

Boundaries

North
Plot No 2
South
9 Meter Wide Road
East
9 Meter Wide Proposed Road
West
Adj Layout Plot No 2 And 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUmesh Bagul—
Chartered accountantNirav Shah—
EngineerBhavesh Patel—
EngineerSagar Shah—
OtherDilip Suryabhan Thombre—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology