Silicon Business Centre

Completed

Nashik 422010 |Promoter: Pooja Devlopers

25 Aug 2019Registered with MahaRERA
30 Dec 2023Promised completion
30 Jun 2024Revised completionPushed back 6 months
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
2
Land area for this project
2,358 sq m (25,376 sq ft)
Permissible built-up area
5,840 sq m (62,857 sq ft)
Sanctioned built-up area
5,840 sq m (62,857 sq ft)
Address
3 and 4 S No 6/6/1/3, Pathardi Road, Pathardi villagePIN 422010
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Silicon Business Centre is at latitude 0.00000, longitude 0.00000.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 months

The latest completion date on record passed 2 years and 4 months ago.

Registered
25 Aug 2019
Promised
30 Dec 2023
Revised
30 Jun 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002194825 Aug 201930 Dec 202330 Jun 2024Pooja DevlopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Silicon——
Silicon Business Centre12—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered0000286
Open Space000013

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Silicon Business Centre

  • Excavation100%
  • Basement (if any)30%
  • Podiums (if any)0%
  • Plinth30%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot Started0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)30 percent done30%
  • Storm Water DrainsNot Started0%
  • Landscaping & Tree PlantingNot Started0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot Started0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot Started0%
  • Electrical meter room, sub-station, receiving stationNot Started0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot Started0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

73 documents held by Deedo, 88 filings listed on MahaRERA's project page

Title report (2)

Commencement certificate (3)

Form B (2)

Encumbrance details (4)

Show all 161 documentsShow fewer documents

Encumbrance details (4)

Form 1 (9)

Form 2 (11)

Allotment letter (2)

Form 2A (7)

Form 5 (6)

Registration certificate

Other (19)

Extension certificate

Occupancy / completion certificate

  • Occupancy / completion certificate9 Jul 2024ViewSource

Form 4

Layout plan (2)

Building plan (2)

Document library

  • Declaration in FORM BDeclaration form B.pdf · uploaded 9 Jul 2019View
  • Copy of the legal title reporttitle report_compressed.pdf · uploaded 9 Jul 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement_compressed.pdf · uploaded 9 Jul 2019View
  • Building Plan Approval (IOD)building layout.pdf · uploaded 9 Jul 2019View
  • OtherPartner Declaration.pdf · uploaded 9 Jul 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer cert.pdf · uploaded 1 Aug 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architecht Certificate.pdf · uploaded 1 Aug 2019View
  • Proforma of Allotment letterallotment letter 25-Jul-2019 15-16-03.pdf · uploaded 1 Aug 2019View
  • Details of encumbrancesEncumbrance-1.pdf · uploaded 1 Aug 2019View
  • Proforma of Allotment letterSilicon business center.pdf · uploaded 2 Aug 2019View
  • Copy of Layout Approval (in case of layout)layout.pdf · uploaded 10 Aug 2019View
  • Copy of Layout Approval (in case of layout)compresed.pdf · uploaded 10 Aug 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)QA.pdf · uploaded 9 Mar 2020View
  • Copy of the legal title reportpooja dev (1).pdf · uploaded 9 Mar 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)rera engineer certificate.pdf · uploaded 9 Mar 2020View
  • OtherBROCHURE 1-8.pdf · uploaded 9 Mar 2020View
  • OtherBrochure 9-16.pdf · uploaded 9 Mar 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)ANNUAL REPORT (1)-compressed.pdf · uploaded 27 Feb 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Final Form 5.pdf · uploaded 30 Sep 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect.pdf · uploaded 4 Oct 2021View
  • Declaration about Commencement Certificatecommencement certificate.pdf · uploaded 4 Oct 2021View
  • Disclosure of sold/ booked inventoryDisclosure of sold booked inventory.pdf · uploaded 4 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)annual report on statement of acccount.pdf · uploaded 4 Oct 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form-2 31-3-2021.pdf · uploaded 4 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2A 31-03-2021.pdf · uploaded 4 Oct 2021View
  • Disclosure of sold/ booked inventorySold Inventory 30-6-21-Comp.pdf · uploaded 27 Oct 2021View
  • Disclosure of sold/ booked inventorySold Inventory 30-9-21-Comp.pdf · uploaded 27 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)certificate of assurance 2A 30062021-Comp.pdf · uploaded 27 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2A 30092021-Comp.pdf · uploaded 27 Oct 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGCERTIFICATE30062021.pdf · uploaded 27 Oct 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG 2130092021.pdf · uploaded 27 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate_3.pdf · uploaded 27 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate_1.pdf · uploaded 27 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate_2.pdf · uploaded 27 Oct 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE -Q1.pdf · uploaded 6 Sep 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE-Q2.pdf · uploaded 6 Sep 2023View
  • Disclosure of sold/ booked inventoryDisclosure Q1.pdf · uploaded 6 Sep 2023View
  • Disclosure of sold/ booked inventoryDisclosure Q2.pdf · uploaded 6 Sep 2023View
  • Disclosure of sold/ booked inventoryDisclosure Q3.pdf · uploaded 6 Sep 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1FY 22-23 Q4.pdf · uploaded 29 Dec 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1FY 23-24- Q 1.pdf · uploaded 29 Dec 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1FY 23-24 - Q2.pdf · uploaded 29 Dec 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 FY 22-23 Q4.pdf · uploaded 29 Dec 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 FY 23-24 Q1.pdf · uploaded 29 Dec 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 FY 23-24 Q2.pdf · uploaded 29 Dec 2023View
  • Disclosure of sold/ booked inventorySOLD UNSOLD FY 22-23 Q4.pdf · uploaded 29 Dec 2023View
  • Disclosure of sold/ booked inventorySOLD UNSOLD FY 23-24 Q1.pdf · uploaded 29 Dec 2023View
  • Disclosure of sold/ booked inventorySOLD UNSOLD FY 23-24 Q2.pdf · uploaded 29 Dec 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 21-22.pdf · uploaded 29 Dec 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 22-23.pdf · uploaded 29 Dec 2023View
  • Commencement Certificates / NA Order for plotted developmentcommencement highlight.pdf · uploaded 29 Dec 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 22-23.pdf · uploaded 29 Dec 2023View
  • Building Plan Approval (IOD)7TH FLOOR.pdf · uploaded 29 Dec 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 1-7-23.pdf · uploaded 29 Dec 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate 010124.pdf · uploaded 1 Feb 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 01012024.pdf · uploaded 1 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form2A 010124.pdf · uploaded 1 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form2A 010124.pdf · uploaded 1 Feb 2024View
  • Disclosure of sold/ booked inventorysold unsold invetory.pdf · uploaded 1 Feb 2024View
  • Disclosure of Interest in Other Real Estate Organizationsdiscloser of interest in other organazation.pdf · uploaded 1 Feb 2024View
  • a Details of encumbrances concerned to Finance1 Details of encumbrances.pdf · uploaded 1 Feb 2024View
  • b Details of encumbrances concerned to Legal1 Details of encumbrances.pdf · uploaded 1 Feb 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank declaration.pdf · uploaded 1 Feb 2024View
  • a Details of encumbrances concerned to FinanceEbcumbrance Certificate.pdf · uploaded 1 Feb 2024View
  • b Details of encumbrances concerned to LegalEbcumbrance Certificate.pdf · uploaded 1 Feb 2024View
  • CERSAI detailsCERSAI_Search_Report_200295418353_For_Asset_Based_Search_01_02_2024_15_35_49_251.pdf · uploaded 6 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 31032022.pdf · uploaded 6 Feb 2024View
  • CERSAI detailsexuberance certificate.pdf · uploaded 6 Feb 2024View
  • a Details of encumbrances concerned to Financeexuberance certificate.pdf · uploaded 6 Feb 2024View
  • b Details of encumbrances concerned to Legalexuberance certificate.pdf · uploaded 6 Feb 2024View
  • Declaration in FORM BFORM B.pdf · uploaded 6 Feb 2024View
  • CERSAI detailsdeclaration.pdf · uploaded 10 Feb 2024View
  • Disclosure of Interest in Other Real Estate Organizationsannexure A BCB_merged.pdf · uploaded 10 Feb 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFULL COMPLETION.pdf · uploaded 9 Jul 2024View
  • Architect’s Certificate on Completion of Project (Form 4)KISHORBHAI 001 (1).pdf · uploaded 9 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5.pdf · uploaded 1 Apr 2025View

Promoter documents

  • Declaration Form BDeclaration form B.pdf · uploaded 9 Jul 2019View
  • Legal Title reporttitle report_compressed.pdf · uploaded 9 Jul 2019View
  • Legal Title reportpooja dev (1).pdf · uploaded 9 Mar 2020View
  • Declaration Form BFORM B.pdf · uploaded 6 Feb 2024View

Technical documents

  • Building Plan Approvalbuilding layout.pdfView
  • Layout Approvallayout.pdfView
  • Layout Approvalcompresed.pdfView
  • Building Plan Approval7TH FLOOR.pdfView

Other legal documents

  • OtherBROCHURE 1-8.pdfView
  • OtherBrochure 9-16.pdfView
  • OtherPartner Declaration.pdfView

Proforma allotment letter

  • Proforma allotment letterSilicon business center.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

34 S No 6/6/1/36/6/1/3

As published on MahaRERA's project page

3 and 4 S No 6/6/1/3

Boundaries

North
Plot No 02
South
9 M Road
East
Plot No 05 06 07 08
West
30 M Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGaikwad Associates—
Chartered accountantHitesh Rajkumar Issrani—
EngineerRajesh Chandrakant Dindorkar—
OtherKrrisha Construction—

Source: MahaRERA project page. Contact details are not shown.