Shubham Apartment

Completed

Nashik 422003 |Promoter: Vasant Shivaji Vasani

Residential / Group HousingRERAP51600021407
26 Jun 2019Registered with MahaRERA
30 Mar 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
823 sq m (8,857 sq ft)
Permissible built-up area
1,476 sq m (15,891 sq ft)
Sanctioned built-up area
1,476 sq m (15,891 sq ft)
Address
45 46 47 48, S No 172 Plot No 45 46 47 48, Tamboli Nagar Hirawadi Road PanchavatiPIN 422003
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.01834, 73.80730
Shubham Apartment is at latitude 20.01834, longitude 73.80730.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
26 Jun 2019
Promised
30 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002140726 Jun 201930 Mar 2023—Vasant Shivaji VasaniProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shubham Apartment6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000021
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shubham Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure60%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBORE WELL0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WIP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWIP0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWIP0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 26 filings listed on MahaRERA's project page

Commencement certificate

Form B

Form 1

Form 2

Title report (2)

Encumbrance details

Form 2A (6)

Show all 49 documentsShow fewer documents

Form 2A (6)

Occupancy / completion certificate (2)

  • Occupancy / completion certificate7 Jul 2020ViewSource
  • Occupancy / completion certificate26 Jun 2021ViewSource

Form 5

Form 4

Registration certificate

Other (2)

Layout plan

Building plan

Allotment letter

Document library

  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE-compressed.pdf · uploaded 11 Jun 2019View
  • Declaration in FORM BFORM B VASANT VASANI_Compressed.PDF · uploaded 11 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architects certificate.PDF · uploaded 11 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engeenier's certificate0002.PDF · uploaded 11 Jun 2019View
  • Building Plan Approval (IOD)BUILDING PLAN 2.pdf · uploaded 11 Jun 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 11 Jun 2019View
  • Proforma of Allotment letterAGREEMENT DRAFT 3.pdf · uploaded 11 Jun 2019View
  • Details of encumbrancesENCUMBRANCE CERTIFICATE_compressed.pdf · uploaded 14 Jun 2019View
  • Copy of the legal title reporttitle report pankaj.PDF · uploaded 14 Jun 2019View
  • Copy of the legal title reporttitle report vasant vasani.PDF · uploaded 14 Jun 2019View
  • Form 2AFORM 2 A.PDF · uploaded 14 Jun 2019View
  • Form 2AVASANT VASANI 2A.pdf · uploaded 20 Feb 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPART COMPLETION.pdf · uploaded 7 Jul 2020View
  • Form 2AFORM 2 A MARCH 2020.pdf · uploaded 7 Jul 2020View
  • Form 2AFORM 2 A JUNE 20.pdf · uploaded 7 Jul 2020View
  • Form 2AFORM 2 A SEP 20.pdf · uploaded 23 Jan 2021View
  • Form 2AFORM 2A DEC 20.pdf · uploaded 23 Jan 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)VASANT VASANI FORM NO-5 19-20 SCAN .pdf · uploaded 18 Mar 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentBUILDING COMPLETION.pdf · uploaded 26 Jun 2021View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 ARCHITECT.PDF · uploaded 16 Jul 2021View

Promoter documents

  • Declaration Form BFORM B VASANT VASANI_Compressed.PDF · uploaded 11 Jun 2019View
  • Legal Title reporttitle report pankaj.PDF · uploaded 14 Jun 2019View
  • Legal Title reporttitle report vasant vasani.PDF · uploaded 14 Jun 2019View

Technical documents

  • Building Plan ApprovalBUILDING PLAN 2.pdfView
  • Layout ApprovalLAYOUT PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT DRAFT 3.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

45 46 47 48

As published on MahaRERA's project page

45 46 47 48

Boundaries

North
Plot No 44
South
9 Mt
East
Plot No 17 18 19 20
West
9 Mt

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManoj H Gupta—
EngineerChimanbhai Dhanjibhai Patel—

Source: MahaRERA project page. Contact details are not shown.