Skip to content
Deedo home
Menu

Shiv Shakti Row Houses

Completed

Nashik 422003 |Promoter: Dineshbhai Mavjibhai Virmagama

Residential / Group HousingRERAP51600009562
22 Aug 2017Registered with MahaRERA
30 Jun 2028Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Land area for this project
1,903 sq m (20,487 sq ft)
Permissible built-up area
2,094 sq m (22,536 sq ft)
Sanctioned built-up area
1,899 sq m (20,445 sq ft)
Address
S No 544 540 541 542 546 543 544P Plot No 1 2 15 16 17 18 19 11 12 13 14PIN 422003
Designated bank account
Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 16.85240, 74.58148
Shiv Shakti Row Houses is at latitude 16.85240, longitude 74.58148.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2028

Registered
22 Aug 2017
Promised
30 Jun 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000956222 Aug 201730 Jun 2028—Dineshbhai Mavjibhai VirmagamaProject page

3 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Shiv Shakti Row Houses Type AClosed/Covered00000
Shiv Shakti Row Houses Type AOpen Space000013
Shiv Shakti Row Houses Type BClosed/Covered00000
Shiv Shakti Row Houses Type BOpen Space000010
Shiv Shakti Row Houses Type CClosed/Covered00000
Shiv Shakti Row Houses Type COpen Space00008

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shiv Shakti Row Houses Type A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Shiv Shakti Row Houses Type B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Shiv Shakti Row Houses Type C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyObtained From NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank done100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingBy NMC100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting done100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationIndividual Meters Taken100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAs Per Plan100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 26 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 2

Form 5 (2)

Form 1

Show all 48 documentsShow fewer documents

Occupancy / completion certificate (3)

  • Occupancy / completion certificate14 Aug 2021ViewSource
  • Occupancy / completion certificate14 Aug 2021ViewSource
  • Occupancy / completion certificate14 Aug 2021ViewSource

Form 4

Other (5)

Registration certificate

Layout plan

Building plan (2)

Allotment letter

Document library

  • Details of encumbrancesSelf Declaration.pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BForm B.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterAlottment Letter.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)Sanctioned Plan.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportTitle Certificate.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)Plot Layout.PDF · uploaded 16 Aug 2017View
  • Certificates of CA (Form 5)Dineshbhai - Form 5.pdf · uploaded 30 Sep 2018View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration - A Wing.pdf · uploaded 14 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate 1.pdf · uploaded 14 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate 2.pdf · uploaded 14 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration - B Wing.pdf · uploaded 14 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration - C Wing.pdf · uploaded 14 Aug 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 14 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate 3.pdf · uploaded 14 Aug 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 2018-19.pdf · uploaded 2 Sep 2021View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 16 Aug 2017View
  • Legal Title reportTitle Certificate.pdf · uploaded 16 Aug 2017View

Technical documents

  • Building Plan ApprovalPlot Layout.PDFView
  • Layout ApprovalLayout Approval.pdfView
  • Building Plan ApprovalSanctioned Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAlottment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

S No 544 540 541 542 546 543 544P Plot No 1 2 15 16 17 18 19 11 12 13 14

As published on MahaRERA's project page

S No 544 540 541 542 546 543 544P Plot No 1 2 15 16 17 18 19 11 12 13 14

Boundaries

North
6 Mtr Road
South
Plot No 20 28
East
6 Mtr Road
West
Colony Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManish Navaparia—
EngineerManish Navaparia—
OtherSNS RERA Consultants—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology