Samraat Symphony Project 02

Completed

Nashik 422009 |Promoter: M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.

Residential / Group HousingRERAP51600002742
4 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
31 Dec 2019Revised completionPushed back 1 year
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
973 sq m (10,479 sq ft)
Permissible built-up area
1,799 sq m (19,368 sq ft)
Sanctioned built-up area
1,799 sq m (19,368 sq ft)
Address
Plot No 84 Survey No 899/1, 899/2/1, 899/3/1/84, Nashik, NashikPIN 422009
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.60666, 73.75247
Samraat Symphony Project 02 is at latitude 18.60666, longitude 73.75247.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 6 years and 10 months ago.

Registered
4 Aug 2017
Promised
31 Dec 2018
Revised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000027424 Aug 201731 Dec 201831 Dec 2019M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.Project page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building 1 - Wing D10—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000020
Open Space00008

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building 1 - Wing D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsPaved Driveway for vehicular movement100%
  • Water SupplyObtained From NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Done100%
  • Storm Water DrainsDone100%
  • Landscaping & Tree PlantingDone100%
  • Street LightingDone100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsClub and Gymnasium100%
  • Treatment And Disposal Of Sewage And Sullage WaterSTP ready100%
  • Solid Waste Management And DisposalNMC Ghantagadi100%
  • Water conservation /Rain water harvestingRain Water Harvesting100%
  • Energy managemcntUse of LED lighting100%
  • Fire protection and fire safety requirementsDone100%
  • Electrical meter room, sub-station, receiving stationSub-Station Ready100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingDone100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

47 documents held by Deedo, 70 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

Commencement certificate (2)

Form 1 (7)

Show all 117 documentsShow fewer documents

Form 1 (7)

Allotment letter (3)

Form B

Form 2 (5)

Registration certificate

Form 5 (2)

Extension certificate

Form 4

Other (7)

Layout plan (2)

Building plan (12)

Document library

  • Copy of the legal title reportTITLE CERTIFICATE.pdf · uploaded 24 Jul 2017View
  • Details of encumbrancesSymphony Index II.pdf · uploaded 24 Jul 2017View
  • Proforma of Allotment letterAgreement of Sale - Symphony - Residential.pdf · uploaded 24 Jul 2017View
  • Copy of Layout Approval (in case of layout)FINAL LAYOUT LETTER.pdf · uploaded 24 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout_899.pdf · uploaded 24 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER -Symphony Residential.pdf · uploaded 24 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate_Symphony Project 02.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)IOD APPLICATION.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Symphony Sheet 1 Of 6.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Symphony Sheet 2 Of 6.pdf · uploaded 24 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Symphony Sheet 3 Of 6.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Symphony Sheet 4 Of 6.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Symphony Sheet 5 Of 6.pdf · uploaded 24 Jul 2017View
  • Building Plan Approval (IOD)Symphony Sheet 6 Of 6.pdf · uploaded 24 Jul 2017View
  • Declaration in FORM BB Form Symphony Project II.pdf · uploaded 25 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engi certificate.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Symphony_Project 0211102017.pdf · uploaded 16 Oct 2017View
  • Proforma of Allotment letterAgreement of Sale -Symphony 11102017.pdf · uploaded 16 Oct 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Attach_3_Engineer Certificate_symphony181017.pdf · uploaded 18 Oct 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE--FOR -D-WING-DATED--4-12-2017.pdf · uploaded 9 Dec 2017View
  • Building Plan Approval (IOD)Symphony Wing D 4-12-17 01.pdf · uploaded 9 Dec 2017View
  • Building Plan Approval (IOD)Symphony Wing D 4-12-17 02.pdf · uploaded 9 Dec 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate__ Symphony 02 200118.pdf · uploaded 22 Jan 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg certificate Symphony_Jan18.pdf · uploaded 24 Jan 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Symphony architect certificate 16042018.pdf · uploaded 25 Apr 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg certificate Symphony May2018.pdf · uploaded 14 May 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Symphony architects Ceritificate 50718compressed.pdf · uploaded 5 Jul 2018View
  • Details of encumbrancesSYMPHONY MORTGAGE DEED.pdf · uploaded 26 Sep 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate Symphony 280918.pdf · uploaded 28 Sep 2018View
  • Certificates of CA (Form 5)Symphony_RERA FORM V.pdf · uploaded 30 Sep 2018View
  • Building Plan Approval (IOD)Full Completion Symphony Project 02 110319.pdf · uploaded 14 Mar 2019View
  • Building Plan Approval (IOD)Sheet 01 Symphony.pdf · uploaded 14 Mar 2019View
  • Building Plan Approval (IOD)Sheet 02 Symphony.pdf · uploaded 14 Mar 2019View
  • Certificates of Architect (Form 4)Form 4 Arch certificate for completion Symphony Project 02.pdf · uploaded 14 Mar 2019View
  • OtherSYMPHONY FINAL FIRE NOC WING D 02-01-2019.pdf · uploaded 15 Mar 2019View
  • Status of ConveyanceSymphony Deed Of Declaration_Part1.pdf · uploaded 20 May 2019View
  • Status of ConveyanceSymphony Deed Of Declaration_Part2.pdf · uploaded 20 May 2019View
  • Status of ConveyanceSymphony Deed Of Declaration_Part3.pdf · uploaded 20 May 2019View
  • Status of ConveyanceSymphony Deed Of Declaration_Part4.pdf · uploaded 20 May 2019View
  • Certificates of Architect (Form 4)Full Completion Symphony Project 02 110319.pdf · uploaded 13 Jun 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Symphony Deed Of Declaration_Part1.pdf · uploaded 13 Jun 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Symphony Deed Of Declaration_Part2.pdf · uploaded 13 Jun 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Symphony Deed Of Declaration_Part3.pdf · uploaded 13 Jun 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Symphony Deed Of Declaration_Part4.pdf · uploaded 13 Jun 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFull Completion Symphony Project 02 110319.pdf · uploaded 27 Sep 2019View
  • Certificates of CA (Form 5)Symphony P-II.pdf · uploaded 30 Sep 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 2018 19 SYM.pdf · uploaded 19 May 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate Form 1 _Symphony 02.pdf · uploaded 20 May 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sym 2.pdf · uploaded 22 May 2023View
  • Proforma of Agreement for sale1 Proforma of AFS SYMPHONY.pdf · uploaded 23 May 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest in other Real Estate.pdf · uploaded 23 May 2023View

Promoter documents

  • Legal Title reportTITLE CERTIFICATE.pdf · uploaded 24 Jul 2017View
  • Declaration Form BB Form Symphony Project II.pdf · uploaded 25 Jul 2017View

Technical documents

  • Layout ApprovalFINAL LAYOUT LETTER.pdfView
  • Layout ApprovalLayout_899.pdfView
  • Building Plan ApprovalIOD APPLICATION.pdfView
  • Building Plan ApprovalSymphony Sheet 1 Of 6.pdfView
  • Building Plan ApprovalSymphony Sheet 2 Of 6.pdfView
  • Building Plan ApprovalSymphony Sheet 3 Of 6.pdfView
  • Building Plan ApprovalSymphony Sheet 4 Of 6.pdfView
  • Building Plan ApprovalSymphony Sheet 5 Of 6.pdfView
  • Building Plan ApprovalSymphony Sheet 6 Of 6.pdfView
  • Building Plan ApprovalSymphony Wing D 4-12-17 01.pdfView
  • Building Plan ApprovalSymphony Wing D 4-12-17 02.pdfView
  • Building Plan ApprovalFull Completion Symphony Project 02 110319.pdfView
  • Building Plan ApprovalSheet 01 Symphony.pdfView
  • Building Plan ApprovalSheet 02 Symphony.pdfView

Other legal documents

  • OtherSYMPHONY FINAL FIRE NOC WING D 02-01-2019.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER -Symphony Residential.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

84899/1899/2/1899/2/1899/3/1/84899/3/1/84Plot No 84 Survey No 899/1

As published on MahaRERA's project page

Plot No 84 Survey No 899/1, 899/2/1, 899/3/1/84

Boundaries

North
6 Meter Wide Road
South
Samraat Symphony Project 03
East
Survey No 898
West
Samraat Symphony Project 01

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Soyuz Talib—
ArchitectAr Tapasya H Bendale—
Chartered accountantBcs And Associates—
Chartered accountantKale & Associates—
EngineerStrudcom—
OtherBaig Enterprises—
OtherHi Tech Electric Engineers—
OtherJayant Electricals—
Show all 16 professionalsShow fewer professionals
RoleNameRegistration no.
OtherMr Sharadchandra Rao—
OtherMr Vikram Y Endait—
OtherRam Constructions—
OtherRidhhi Siddhi Constructions—
OtherSamarth Agencies—
OtherSchindler India Pvt Ltd—
OtherShinde Plumber & Plumbing Consultancy—
OtherSneha Enterprises—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology