Rachit Kalpataru

Completed

Nashik 422009 |Promoter: S. M. Enterprises

Residential / Group HousingRERAP51600016974
26 Jun 2018Registered with MahaRERA
30 May 2022Promised completion
1Building
92Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK92 units in all
Land area for this project
2,500 sq m (26,910 sq ft)
Permissible built-up area
5,625 sq m (60,549 sq ft)
Sanctioned built-up area
5,625 sq m (60,549 sq ft)
Address
Plot No 1b, S No 807/1/2/5 To 7, Off Mumbai Agra Highway, Dipali NagarPIN 422009
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 May 2022

The latest completion date on record passed 4 years and 5 months ago.

Registered
26 Jun 2018
Promised
30 May 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001697426 Jun 201830 May 2022—S. M. EnterprisesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rachit Kalpataru1492

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

92 units registered

2BHK · 72 units3BHK · 20 units
TypeCarpet areaUnits
2BHK39.97 sq m · 430 sq ft22
2BHK50.78 sq m · 547 sq ft4
2BHK52.74 sq m · 568 sq ft22
2BHK53.03 sq m · 571 sq ft24
3BHK59.89 sq m · 645 sq ft20

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000014
Open Space000066

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rachit Kalpataru

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTO BE OBTAINED FROM NMC OM COMPLETION0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK OUTLET WILL BE CONNECTED TO DRAINAGE0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWILL BE COMPLETED AS PER REQUIREMENTS OF DC RULES0%
  • Electrical meter room, sub-station, receiving stationONLY ELECTRIC METER BOX0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 25 filings listed on MahaRERA's project page

Commencement certificate

Title report

Encumbrance details

Form B

Allotment letter (2)

Form 5 (3)

Show all 48 documentsShow fewer documents

Form 5 (3)

Registration certificate

Occupancy / completion certificate

  • Occupancy / completion certificate23 Sep 2021ViewSource

Form 4

Other (8)

Layout plan

Building plan (2)

Document library

  • Commencement Certificates / NA Order for plotted development1 Commencement Certificate.pdf · uploaded 15 Jun 2018View
  • Declaration in FORM B6 Affidavit.pdf · uploaded 18 Jun 2018View
  • Copy of the legal title report2 Title Report.pdf · uploaded 18 Jun 2018View
  • Building Plan Approval (IOD)13 Building Plan.pdf · uploaded 18 Jun 2018View
  • Proforma of Allotment letter5 Allotment Letter.pdf · uploaded 18 Jun 2018View
  • Copy of Layout Approval (in case of layout)4 Layout Copy.pdf · uploaded 18 Jun 2018View
  • Details of encumbrances3 No Encumbrance Certificate.pdf · uploaded 18 Jun 2018View
  • Proforma of Allotment letter5 Agreement Draft Letter.pdf · uploaded 18 Jun 2018View
  • Building Plan Approval (IOD)13 Building Plan 2.pdf · uploaded 19 Jun 2018View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 2018-19_compressed.pdf · uploaded 20 Dec 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)RERA Audit 2019-20_Signed.pdf · uploaded 1 Sep 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate_compressed.pdf · uploaded 23 Sep 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Rachit Kalptaru Architect Certificate Form 4.pdf · uploaded 23 Sep 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration Rachit Kalpataru-1-18.pdf · uploaded 23 Sep 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration Rachit Kalpataru-19-37.pdf · uploaded 23 Sep 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration Rachit Kalpataru-38-58.pdf · uploaded 23 Sep 2021View
  • Status of ConveyanceIndex-II Record - Rachit Kalpataru_compressed-1-27.pdf · uploaded 23 Sep 2021View
  • Status of ConveyanceIndex-II Record - Rachit Kalpataru_compressed-28-55.pdf · uploaded 23 Sep 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RERA Audit signed 20-21.pdf · uploaded 8 Jun 2022View

Promoter documents

  • Declaration Form B6 Affidavit.pdf · uploaded 18 Jun 2018View
  • Legal Title report2 Title Report.pdf · uploaded 18 Jun 2018View

Technical documents

  • Building Plan Approval13 Building Plan.pdfView
  • Layout Approval4 Layout Copy.pdfView
  • Building Plan Approval13 Building Plan 2.pdfView

Proforma allotment letter

  • Proforma allotment letter5 Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

PLOT NO 1BS NO 807/1/2/5 TO 7

As published on MahaRERA's project page

PLOT NO 1B, S NO 807/1/2/5 TO 7

Boundaries

North
Adjoining Layout
South
12 Mtr Wide Dp Road
East
Plot No 1c
West
Plot No 1a

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRupali And Vivek Jaykhedkar Architects—
EngineerSanjeev Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology