Nilkanth Rowhouses

Completed

Nashik 422003 |Promoter: Kailash Bharatbhai Adroja & Other Two

Residential / Group HousingRERAP51600017138
16 Jul 2018Registered with MahaRERA
30 Jun 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
683 sq m (7,351 sq ft)
Permissible built-up area
679 sq m (7,304 sq ft)
Sanctioned built-up area
679 sq m (7,304 sq ft)
Address
S No 234/1/1 Plus 2a/2/2, Hirawadi Road, PanchvatiPIN 422003
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
16 Jul 2018
Promised
30 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001713816 Jul 201830 Jun 2023—Kailash Bharatbhai Adroja & Other TwoProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Nilkanth Rowhouses2—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00002
Open Space00008

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Nilkanth Rowhouses

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyObtained from NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank done100%
  • Storm Water Drainswill do before completionNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingProvided by NMC100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting done100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationIndividual Meters obtained100%
  • Aggregate area of recreational Open SpaceNo separate roomNot applicable
  • Open ParkingCompleted As per Plan100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 26 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1 (2)

Form 4

Form 2

Show all 45 documentsShow fewer documents

Form 5

Occupancy / completion certificate

  • Occupancy / completion certificate26 Feb 2020ViewSource

Other (5)

Registration certificate

Layout plan

Building plan

Allotment letter

Document library

  • Declaration in FORM BForm B.pdf · uploaded 30 Jun 2018View
  • Copy of the legal title reportTitle Report.pdf · uploaded 30 Jun 2018View
  • Details of encumbrancesEncumbrance.pdf · uploaded 30 Jun 2018View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 30 Jun 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 30 Jun 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 30 Jun 2018View
  • Copy of Layout Approval (in case of layout)Plot Layout.pdf · uploaded 30 Jun 2018View
  • Building Plan Approval (IOD)Sanctioned Plan.pdf · uploaded 30 Jun 2018View
  • Proforma of Allotment letterAgreement to Sale.pdf · uploaded 9 Jul 2018View
  • OtherAOP Letter.pdf · uploaded 9 Jul 2018View
  • Certificates of Architect (Form 4)Form 4.pdf · uploaded 5 Apr 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Completion.pdf · uploaded 5 Apr 2019View
  • Othercompletion.pdf · uploaded 5 Apr 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 26 Feb 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 26 Feb 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5.pdf · uploaded 26 Feb 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 26 Feb 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration.pdf · uploaded 26 Feb 2020View
  • Status of Conveyance7 12.pdf · uploaded 26 Feb 2020View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 30 Jun 2018View
  • Legal Title reportTitle Report.pdf · uploaded 30 Jun 2018View

Technical documents

  • Building Plan ApprovalSanctioned Plan.pdfView
  • Layout ApprovalPlot Layout.pdfView

Other legal documents

  • Othercompletion.pdfView
  • OtherAOP Letter.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement to Sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

S NO 234/1/1 PLUS 2A/2/2

As published on MahaRERA's project page

S NO 234/1/1 PLUS 2A/2/2

Boundaries

North
Plot No 33
South
9 Meter Road
East
9 Meter Colony Road
West
Plot No 26 27 28

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGaikwad Associates—
Chartered accountantNirav S Shah—
EngineerRamkrushna Ratan Aanerao—
EngineerSagar S Shah—
OtherChaturbhai H Khumpara—
OtherKumjibhai P Kotadiya—
OtherNarendra Maganlal Velumi—
OtherShaileshbhai k Narodiya—
OtherSuresh V Pawar—

Source: MahaRERA project page. Contact details are not shown.