Nilkanth Heights

Lapsed

Nashik 422010 |Promoter: Metaliya Developers

Residential / Group HousingRERAP51600022762
16 Oct 2019Registered with MahaRERA
30 Dec 2024Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
2
Land area for this project
699 sq m (7,520 sq ft)
Permissible built-up area
1,261 sq m (13,572 sq ft)
Sanctioned built-up area
1,261 sq m (13,572 sq ft)
Planning authority
NASHIK MUNICIPAL CORPORATION
Address
Plot 13 14 15 Survey No 316/3, Pathardi, PathardiPIN 422010
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.95337, 73.76003
Nilkanth Heights is at latitude 19.95337, longitude 73.76003.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
16 Oct 2019
Promised
30 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002276216 Oct 201930 Dec 2024—Metaliya DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P51600022762)——
Nilkanth Heights5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered6480072
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Nilkanth Heights

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAt the time of Completion0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)At the time of Completion0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAt the time of Completion0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAt the time of Completion0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

42 documents held by Deedo, 46 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1 (2)

Form 2 (2)

Show all 88 documentsShow fewer documents

Registration certificate

Other (30)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTitleReport.pdf · uploaded 10 Oct 2019View
  • Details of encumbrancesEcumbaranceCert.pdf · uploaded 10 Oct 2019View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 10 Oct 2019View
  • Building Plan Approval / NA Order for plotted developmentPlanCompressed.pdf · uploaded 10 Oct 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 10 Oct 2019View
  • Declaration in FORM BForm B.pdf · uploaded 10 Oct 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Cert.pdf · uploaded 10 Oct 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)EngineeringCert.pdf · uploaded 10 Oct 2019View
  • Proforma of Allotment letterDraftSaleAgr.pdf · uploaded 10 Oct 2019View
  • Status of ConveyanceDeclarationDeed_compressed.pdf · uploaded 1 Apr 2025View
  • Other – LegalDeclarationDeed_compressed.pdf · uploaded 1 Apr 2025View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • OthersForm 2A.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View
  • OthersForm 2A.pdf · uploaded 12 Aug 2026View
  • Form 1Form 1.pdf · uploaded 12 Aug 2026View
  • Form 2Form 2.pdf · uploaded 12 Aug 2026View
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold.pdf · uploaded 12 Aug 2026View

Promoter documents

  • Legal Title reportTitleReport.pdf · uploaded 10 Oct 2019View
  • Declaration Form BForm B.pdf · uploaded 10 Oct 2019View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalPlanCompressed.pdfView

Other legal documents

  • Other – LegalDeclarationDeed_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterDraftSaleAgr.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

316/3PLOT 13 14 15 SURVEY NO 316/3

As published on MahaRERA's project page

PLOT 13 14 15 SURVEY NO 316/3

Boundaries

North
Plot No 12
South
Survey No 315 P
East
Plot No 1 And 2
West
9 Meter Colony Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAli Munir Khan—
Chartered accountantSonali R Gujarathi—
EngineerManish Navaparia—
OtherManish Velani—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology