Laxmi Residency

Completed

Nashik 422003 |Promoter: Arun Pundlik Nikam

31 Aug 2017Registered with MahaRERA
30 Jun 2020Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
603 sq m (6,486 sq ft)
Permissible built-up area
873 sq m (9,397 sq ft)
Sanctioned built-up area
873 sq m (9,397 sq ft)
Address
S. No. 26/1/1/2 Plot No 5PIN 422003
Designated bank account
Saraswat Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.98358, 73.80768
Laxmi Residency is at latitude 19.98358, longitude 73.80768.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2020

The latest completion date on record passed 6 years and 4 months ago.

Registered
31 Aug 2017
Promised
30 Jun 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001059131 Aug 201730 Jun 2020—Arun Pundlik NikamProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Laxmi Residency5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00002

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Laxmi Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure80%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWILL BE DONE BEFORE COMPLETION0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WILL BE DONE BEFORE COMPLETION0%
  • Storm Water DrainsWILL BE DONE BEFORE COMPLETION0%
  • Landscaping & Tree PlantingWILL BE DONE BEFORE COMPLETION0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWILL BE DONE BEFORE COMPLETION0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWILL BE DONE BEFORE COMPLETION0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWILL BE DONE BEFORE COMPLETION50%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 24 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 16 Aug 2017View
  • Details of encumbrancesEncumbrances.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BForm B.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineers certificate Laxmi.pdf · uploaded 16 Aug 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Audit Report 17-18.pdf · uploaded 8 Jul 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 18-19.pdf · uploaded 8 Jul 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Audit Report 19-20.pdf · uploaded 8 Jul 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment declaration-1-11 (1).pdf · uploaded 13 Jul 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment declaration-12-22 (1).pdf · uploaded 13 Jul 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment declaration-23-33 (1).pdf · uploaded 13 Jul 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment declaration-34-45 (1).pdf · uploaded 13 Jul 2022View
  • Declaration about Commencement CertificateForm D_compressed.pdf · uploaded 13 Jul 2022View
  • Disclosure of sold/ booked inventorySold Booked_compressed.pdf · uploaded 13 Jul 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 13 Jul 2022View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 16 Aug 2017View
  • Declaration Form BForm B.pdf · uploaded 16 Aug 2017View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLayout.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

26/1/1/25S. NO. 26/1/1/2 PLOT NO 5

As published on MahaRERA's project page

S. NO. 26/1/1/2 PLOT NO 5

Boundaries

North
Survey No 265
South
Plot No 4
East
Open Space For Same Layout
West
30 Meter Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKishor Shinde—

Source: MahaRERA project page. Contact details are not shown.