Kamdhenu Co Operative Housing Society

Completed

Nashik 422010 |Promoter: Kamdhenu Co Operative Housing Society Limited Nashik

Residential / Group HousingRERAP51600016952
22 Jun 2018Registered with MahaRERA
30 Jun 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,402 sq m (15,087 sq ft)
Permissible built-up area
3,333 sq m (35,874 sq ft)
Sanctioned built-up area
3,333 sq m (35,874 sq ft)
Address
Plot No 02 06 07 S No 28/2-1 5/2/28 4 55/1a/1, Kamatwade, KamatwadePIN 422010
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Kamdhenu Co Operative Housing Society is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
22 Jun 2018
Promised
30 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001695222 Jun 201830 Jun 2023—Kamdhenu Co Operative Housing Society Limited NashikProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Kamdhenu Co Operative Housing Society9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000013
Open Space000027

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Kamdhenu Co Operative Housing Society

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Internal Roads & FootpathsNot applicable
  • Water SupplyCONNECTION TAKEN FROM NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DONE100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
Show all 17 activitiesShow fewer activities
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingDONE100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNO SEPRATE ROOM100%
  • Electrical meter room, sub-station, receiving stationNO SEPERATE ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingDONE100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 25 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Allotment letter (2)

Form 1

Form 2

Show all 47 documentsShow fewer documents

Form 2A

Form 5 (2)

Occupancy / completion certificate

  • Occupancy / completion certificate12 Aug 2020ViewSource

Form 4

Other (5)

Registration certificate

Layout plan (2)

Building plan

Document library

  • Declaration in FORM BForm B - Affidavit .pdf · uploaded 14 Jun 2018View
  • Details of encumbrancesEncumbarance Certificate.pdf · uploaded 14 Jun 2018View
  • Copy of the legal title reportTitle Search Report.pdf · uploaded 14 Jun 2018View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate compressed.pdf · uploaded 14 Jun 2018View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 14 Jun 2018View
  • Copy of Layout Approval (in case of layout)Land Layout 1.pdf · uploaded 14 Jun 2018View
  • Copy of Layout Approval (in case of layout)Land layout 2.pdf · uploaded 14 Jun 2018View
  • Proforma of Allotment letterDRAFT - Agreement to Sale.pdf · uploaded 16 Jun 2018View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 16 Jun 2018View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Kamdhenu - Compressed.pdf · uploaded 12 Aug 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Kamdhenu - Compressed.pdf · uploaded 12 Aug 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Kamdhenu.pdf · uploaded 12 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 (Final).pdf · uploaded 12 Aug 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 12 Aug 2020View
  • OtherDeclaration of Completion.pdf · uploaded 12 Aug 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Kamdhenu.pdf · uploaded 13 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Kamdhenu Form 5 F Y 2019 2020.pdf · uploaded 13 Aug 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Kamdhenu Declaration of Society Certificate.pdf · uploaded 21 Aug 2021View

Promoter documents

  • Declaration Form BForm B - Affidavit .pdf · uploaded 14 Jun 2018View
  • Legal Title reportTitle Search Report.pdf · uploaded 14 Jun 2018View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLand Layout 1.pdfView
  • Layout ApprovalLand layout 2.pdfView

Other legal documents

  • OtherDeclaration of Completion.pdfView

Proforma allotment letter

  • Proforma allotment letterDRAFT - Agreement to Sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

PLOT NO 02 06 07 S NO 28/21 5/2/28 4 55/1A/1

As published on MahaRERA's project page

PLOT NO 02 06 07 S NO 28/2-1 5/2/28 4 55/1A/1

Boundaries

North
18 MTR DP ROAD and Open Space
South
7 5 Mtr Colony Road Plot No 5joint S No 55 1a
East
PLOT NO 1 of S No 28 2
West
Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHiteshbhai Rakholiya—
Chartered accountantAkshay Ashok Shah—
EngineerHiteshbhai Rakholiya—
EngineerRameshbhai Rampariya—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology