17 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
31 Dec 2019Revised completionPushed back 1 year
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1 BHK, 1BHK, 1 BHK DINNING12 units in all
Land area for this project
283 sq m (3,043 sq ft)
Permissible built-up area
389 sq m (4,192 sq ft)
Sanctioned built-up area
389 sq m (4,192 sq ft)
Address
Plot No 34 Survey No 82/1aPIN 422003
Designated bank account
Kotak Mahindra Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.12393, 72.90944
Govinda B is at latitude 19.12393, longitude 72.90944.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 6 years and 10 months ago.

Registered
17 Aug 2017
Promised
31 Dec 2018
Revised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000726417 Aug 201731 Dec 201831 Dec 2019Sai Anand BuildersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Govinda B612

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

1 BHK · 4 units1BHK · 4 units1 BHK DINNING · 4 units
TypeCarpet areaUnits
1 BHK28.5 sq m · 307 sq ft4
1BHK28.64 sq m · 308 sq ft4
1 BHK DINNING34.56 sq m · 372 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00007
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Govinda B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOAR DONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBER LINES SEPTIC TANK DONE100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTING DONE100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Registration certificate

Form 5 (3)

Show all 44 documentsShow fewer documents

Form 5 (3)

Extension certificate

Occupancy / completion certificate

  • Occupancy / completion certificate7 Sep 2019ViewSource

Form 4 (2)

Other (3)

Layout plan

Building plan (2)

Allotment letter

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 28 Jul 2017View
  • Details of encumbrancesSelf Declaration Regarding Encumbrances.pdf · uploaded 28 Jul 2017View
  • Proforma of Allotment letterAgreement and allotment.pdf · uploaded 28 Jul 2017View
  • Declaration in FORM BForm B Affidavit cum Declaration.pdf · uploaded 28 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 28 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 28 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 28 Jul 2017View
  • Certificates of CA (Form 5)RERA Audit Report.pdf · uploaded 28 Sep 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 7 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4 Architect Certificate.pdf · uploaded 7 Sep 2019View
  • Building Plan Approval (IOD)Plan.pdf · uploaded 10 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 5 Jan 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration of Apartment.pdf · uploaded 5 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Sai Anand Builders FY 18-19.pdf · uploaded 29 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Sai Anand Builders Fy 19-20.pdf · uploaded 29 Apr 2023View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 28 Jul 2017View
  • Declaration Form BForm B Affidavit cum Declaration.pdf · uploaded 28 Jul 2017View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalPlan.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement and allotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

3482/1APLOT NO 34 SURVEY NO 82/1A

As published on MahaRERA's project page

PLOT NO 34 SURVEY NO 82/1A

Boundaries

North
Plot No 33
South
Colony Road
East
Plot No 35 And 36
West
Colony Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHrishikesh Kashinath Pawar—
EngineerRavindrakumar Namwar Singh—
OtherArati Ravindra Yadav—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology