Emporio 1 at Quillion Park
Certificate SignedNashik 422009 |Promoter: Viraj Estates Pvt. Ltd. & Two Others
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- Banquet Club House, Cafe, Conference, Convinience Shop, Gym, Multi Purpose Hall, Office space, Panel Room, Restaurant, Shop281 units in all
- Address
- Part of S.No. 777/3/1 and Part of S.No. 785/1/2/3/11, Old Canal Link Road, Govind NagarPIN 422009
- Designated bank account
- 85
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 2 Mar 2021
- Promised
- 30 Jun 2027
- Revised
- 30 Oct 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600028464 | 2 Mar 2021 | 30 Jun 2027 | 30 Oct 2027 | Viraj Estates Pvt. Ltd. & Two Others | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building D | 14 | 248 |
| Building E | 4 | 33 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
111 of 281 units booked (40%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building D | Banquet Club House | 893.45 sq m · 9,617 sq ft | 1 | 0 |
| Building D | Cafe | 160.8 sq m · 1,731 sq ft | 1 | 0 |
| Building D | Conference | 110.93 sq m · 1,194 sq ft | 1 | 0 |
| Building D | Convinience Shop | 36.07 sq m · 388 sq ft | 1 | 0 |
| Building D | Convinience Shop | 36.4 sq m · 392 sq ft | 2 | 0 |
| Building D | Convinience Shop | 39.99 sq m · 430 sq ft | 1 | 0 |
| Building D | Convinience Shop | 43.44 sq m · 468 sq ft | 1 | 0 |
| Building D | Convinience Shop | 61.6 sq m · 663 sq ft | 1 | 0 |
Show all 73 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building D | Gym | 230.57 sq m · 2,482 sq ft | 1 | 0 |
| Building D | Multi Purpose Hall | 73.61 sq m · 792 sq ft | 1 | 0 |
| Building D | Office space | 35.15 sq m · 378 sq ft | 1 | 1 |
| Building D | Office space | 35.18 sq m · 379 sq ft | 3 | 1 |
| Building D | Office space | 35.52 sq m · 382 sq ft | 16 | 10 |
| Building D | Office space | 35.62 sq m · 383 sq ft | 4 | 2 |
| Building D | Office space | 36.07 sq m · 388 sq ft | 16 | 1 |
| Building D | Office space | 36.4 sq m · 392 sq ft | 64 | 7 |
| Building D | Office space | 52.12 sq m · 561 sq ft | 2 | 1 |
| Building D | Office space | 52.73 sq m · 568 sq ft | 1 | 0 |
| Building D | Office space | 53.62 sq m · 577 sq ft | 2 | 0 |
| Building D | Office space | 54.22 sq m · 584 sq ft | 1 | 1 |
| Building D | Office space | 55.72 sq m · 600 sq ft | 4 | 0 |
| Building D | Office space | 60.7 sq m · 653 sq ft | 2 | 0 |
| Building D | Office space | 61.54 sq m · 662 sq ft | 4 | 1 |
| Building D | Office space | 72.23 sq m · 777 sq ft | 2 | 0 |
| Building D | Office space | 73.9 sq m · 795 sq ft | 10 | 0 |
| Building D | Office space | 76.15 sq m · 820 sq ft | 1 | 1 |
| Building D | Office space | 85.96 sq m · 925 sq ft | 1 | 0 |
| Building D | Office space | 87.74 sq m · 944 sq ft | 2 | 1 |
| Building D | Office space | 95.79 sq m · 1,031 sq ft | 1 | 0 |
| Building D | Office space | 109.14 sq m · 1,175 sq ft | 1 | 0 |
| Building D | Office space | 110.93 sq m · 1,194 sq ft | 4 | 0 |
| Building D | Office space | 111.16 sq m · 1,197 sq ft | 1 | 0 |
| Building D | Office space | 112.05 sq m · 1,206 sq ft | 1 | 0 |
| Building D | Office space | 117.2 sq m · 1,262 sq ft | 1 | 0 |
| Building D | Office space | 120.12 sq m · 1,293 sq ft | 1 | 0 |
| Building D | Office space | 131.1 sq m · 1,411 sq ft | 1 | 0 |
| Building D | Office space | 142.08 sq m · 1,529 sq ft | 1 | 0 |
| Building D | Office space | 153.06 sq m · 1,648 sq ft | 1 | 0 |
| Building D | Office space | 153.97 sq m · 1,657 sq ft | 2 | 0 |
| Building D | Office space | 186 sq m · 2,002 sq ft | 1 | 1 |
| Building D | Panel Room | 36.4 sq m · 392 sq ft | 1 | 0 |
| Building D | Restaurant | 270.83 sq m · 2,915 sq ft | 1 | 0 |
| Building D | Restaurant | 274.53 sq m · 2,955 sq ft | 1 | 0 |
| Building D | Restaurant | 300.02 sq m · 3,229 sq ft | 1 | 0 |
| Building D | Restaurant | 323.81 sq m · 3,485 sq ft | 1 | 0 |
| Building D | Shop | 18.53 sq m · 199 sq ft | 1 | 1 |
| Building D | Shop | 32.82 sq m · 353 sq ft | 2 | 2 |
| Building D | Shop | 36.35 sq m · 391 sq ft | 39 | 38 |
| Building D | Shop | 44.83 sq m · 483 sq ft | 1 | 1 |
| Building D | Shop | 46.39 sq m · 499 sq ft | 1 | 1 |
| Building D | Shop | 46.97 sq m · 506 sq ft | 21 | 5 |
| Building D | Shop | 61.56 sq m · 663 sq ft | 1 | 1 |
| Building D | Shop | 75.62 sq m · 814 sq ft | 1 | 1 |
| Building D | Shop | 155.17 sq m · 1,670 sq ft | 2 | 0 |
| Building D | Shop | 155.54 sq m · 1,674 sq ft | 1 | 0 |
| Building D | Shop | 172.24 sq m · 1,854 sq ft | 1 | 0 |
| Building D | Shop | 172.68 sq m · 1,859 sq ft | 1 | 0 |
| Building D | Shop | 254.89 sq m · 2,744 sq ft | 1 | 0 |
| Building D | Shop | 273.56 sq m · 2,945 sq ft | 2 | 1 |
| Building D | Shop | 277.82 sq m · 2,990 sq ft | 2 | 0 |
| Building D | Shop | 303.77 sq m · 3,270 sq ft | 1 | 0 |
| Building D | Shop | 308 sq m · 3,315 sq ft | 1 | 0 |
| Building D | Shop | 309.56 sq m · 3,332 sq ft | 1 | 0 |
| Building E | Shop | 15.36 sq m · 165 sq ft | 4 | 4 |
| Building E | Shop | 16.59 sq m · 179 sq ft | 6 | 6 |
| Building E | Shop | 18.06 sq m · 194 sq ft | 2 | 2 |
| Building E | Shop | 18.55 sq m · 200 sq ft | 4 | 4 |
| Building E | Shop | 19.98 sq m · 215 sq ft | 6 | 6 |
| Building E | Shop | 26.91 sq m · 290 sq ft | 2 | 1 |
| Building E | Shop | 28.63 sq m · 308 sq ft | 3 | 3 |
| Building E | Shop | 30.82 sq m · 332 sq ft | 1 | 1 |
| Building E | Shop | 31.79 sq m · 342 sq ft | 2 | 2 |
| Building E | Shop | 34.66 sq m · 373 sq ft | 3 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 121 filings listed on MahaRERA's project page
Finance
Show all 122 documentsShow fewer documents
Migrated
- 1 PAN CardPAN - VEPL.pdf · uploaded 24 Feb 2021Source
- 2 PAN CardPAN - Arkk.pdf · uploaded 24 Feb 2021Source
- 3 PAN CardPAN - Vedang.pdf · uploaded 24 Feb 2021Source
- 1 Copy of the legal title reportTitle Report.pdf · uploaded 24 Feb 2021Source
- 1 Details of encumbrancesNo Encumbrance.pdf · uploaded 24 Feb 2021Source
- 1 Copy of Layout Approval (in case of layout)Plot Layout 1.pdf · uploaded 24 Feb 2021Source
- 2 Copy of Layout Approval (in case of layout)Plot Layout 2.pdf · uploaded 24 Feb 2021Source
- 3 Copy of Layout Approval (in case of layout)Plot Layout 3.pdf · uploaded 24 Feb 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentSP 1.pdf · uploaded 24 Feb 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentSP 2.pdf · uploaded 24 Feb 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentSP 3.pdf · uploaded 24 Feb 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentSP 4.pdf · uploaded 24 Feb 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentSP 5.pdf · uploaded 24 Feb 2021Source
- 6 Building Plan Approval / NA Order for plotted developmentSP 6.pdf · uploaded 24 Feb 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 24 Feb 2021Source
- 1 Declaration in FORM BForm B.pdf · uploaded 24 Feb 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Feb 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 24 Feb 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 24 Feb 2021Source
- 1 Proforma of Allotment letterAgreement To Sale.pdf · uploaded 24 Feb 2021Source
- 2 Proforma of Allotment letterAlottment Letter.pdf · uploaded 24 Feb 2021Source
- 1 OtherSelf Declaration - Revised Plans.pdf · uploaded 24 Feb 2021Source
- 2 OtherProposed Site Plan.pdf · uploaded 24 Feb 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 2020-21.pdf · uploaded 30 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)New Form 5 - 2021-22.pdf · uploaded 30 Mar 2023Source
- 2 Details of encumbrancesFinancial Encumbrance.pdf · uploaded 7 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 7 Aug 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory.pdf · uploaded 7 Aug 2023Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 7 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account.pdf · uploaded 7 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Emp.pdf · uploaded 25 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Emp.pdf · uploaded 25 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Emp.pdf · uploaded 25 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - 2022-23 - Emp.pdf · uploaded 25 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)New Form 5 - 2022-23.pdf · uploaded 25 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 18 Jan 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account.pdf · uploaded 18 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryInventory 23-24 Q4.pdf · uploaded 5 Aug 2024Source
- 3 Disclosure of sold/ booked inventoryInventory 24-25 Q1.pdf · uploaded 5 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 311223.pdf · uploaded 6 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 2024.pdf · uploaded 6 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 23-24 Q4.pdf · uploaded 13 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 24-25 Q1.pdf · uploaded 13 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 24-25 Q2.pdf · uploaded 13 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 24-25 Q3.pdf · uploaded 13 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 23-24 Q3.pdf · uploaded 13 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SD 24-25 Q3.pdf · uploaded 13 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SD 24-25 Q2.pdf · uploaded 13 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SD 24-25 Q1.pdf · uploaded 13 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SD 23-24 Q4.pdf · uploaded 13 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 23-24 Q4.pdf · uploaded 13 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 24-25 Q1.pdf · uploaded 13 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 24-25 Q2.pdf · uploaded 13 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 24-25 Q3.pdf · uploaded 13 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryInventory 30-06-2024.pdf · uploaded 13 Feb 2025Source
- 2 Disclosure of sold/ booked inventoryInventory 30-09-2024.pdf · uploaded 13 Feb 2025Source
- 3 Disclosure of sold/ booked inventoryInventory 31-12-2024.pdf · uploaded 13 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - 2023-24.pdf · uploaded 13 Feb 2025Source
- Form 1Form 1 23-24 Q4.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 23-24 Q4.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 23-24 Q4.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 31-03-2024.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 24-25 Q1.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 24-25 Q1.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 24-25 Q1.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 30-06-2024.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 24-25 Q2.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 24-25 Q2.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 24-25 Q2.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 30-09-2024.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 24-25 Q3.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 24-25 Q3.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 24-25 Q3.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 31-12-2024.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 24-25 Q4.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 24-25 Q4.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 24-25 Q4.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 24-25 Q4.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 25-26 Q1.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 25-26 Q1.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 25-26 Q1.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 30-06-2025.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 25-26 Q2.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 25-26 Q2.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 25-26 Q2.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 30-09-2025.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 25-26 Q3.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 25-26 Q3.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 25-26 Q3.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 31-12-2025.pdf · uploaded 22 Jun 2026Source
- Form 1Form 1 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Form 2Form 2 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Form 3Form 3 SD 25-26 Q4.pdf · uploaded 22 Jun 2026Source
- Disclosure of Sold and Booked InventoryInventory 31-03-2026.pdf · uploaded 22 Jun 2026Source
Technical
- DocumentPlot Layout 1.pdf · uploaded 24 Feb 2021Source
- DocumentPlot Layout 2.pdf · uploaded 24 Feb 2021Source
- DocumentPlot Layout 3.pdf · uploaded 24 Feb 2021Source
- DocumentSP 1.pdf · uploaded 24 Feb 2021Source
- DocumentSP 2.pdf · uploaded 24 Feb 2021Source
- DocumentSP 3.pdf · uploaded 24 Feb 2021Source
- DocumentSP 4.pdf · uploaded 24 Feb 2021Source
- DocumentSP 5.pdf · uploaded 24 Feb 2021Source
- DocumentSP 6.pdf · uploaded 24 Feb 2021Source
Technical (Architect)
- DocumentForm 1 311223.pdf · uploaded 6 Aug 2024Source
- DocumentForm 1 23-24 Q3.pdf · uploaded 13 Feb 2025Source
- DocumentForm 1 23-24 Q4.pdf · uploaded 13 Feb 2025Source
- DocumentForm 1 24-25 Q1.pdf · uploaded 13 Feb 2025Source
- DocumentForm 1 24-25 Q2.pdf · uploaded 13 Feb 2025Source
- DocumentForm 1 24-25 Q3.pdf · uploaded 13 Feb 2025Source
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nashik, Nashik taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Part of S No 785
- South
- 30 Meter DP Road
- East
- Adj Part of S No 786
- West
- Adj Part of S No 777-3-1 and Open Space
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Pankaj Jadhav | — |
| Architect | Roots Landscape | — |
| Architect | Sanjay Puri Architects | — |
| Chartered accountant | Nirav Shah | — |
| Chartered accountant | Saril Shah | — |
| Engineer | Bhavesh Patel | — |
| Engineer | Kelkar Consultants | — |
| Other | Asit Enterprises | — |
Show all 12 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Other | Bora Buildcon | — |
| Other | Milind Services | — |
| Other | Parag Suryawanshi | — |
| Other | SNS RERA Consultants | — |
Source: MahaRERA project page. Contact details are not shown.
