Construction Of 49 Ts Mig

Completed

Nashik 422003 |Promoter: Nashik Housing And Area Development Board

Residential / Group HousingRERAP51600013395
4 Oct 2017Registered with MahaRERA
30 Dec 2021Promised completion
1Building
49Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2 BHK, 2BHK49 units in all
Land area for this project
1,516 sq m (16,318 sq ft)
Permissible built-up area
3,380 sq m (36,380 sq ft)
Sanctioned built-up area
3,380 sq m (36,380 sq ft)
Address
G No 493 AdgaonPIN 422003
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.44177, 73.83188
Construction Of 49 Ts Mig is at latitude 18.44177, longitude 73.83188.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
4 Oct 2017
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000133954 Oct 201730 Dec 2021—Nashik Housing And Area Development BoardProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Construction Of 49 Ts Mig949

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

49 units registered

2 BHK · 42 units2BHK · 7 units
TypeCarpet areaUnits
2 BHK59.11 sq m · 636 sq ft35
2 BHK59.88 sq m · 645 sq ft7
2BHK59.27 sq m · 638 sq ft7

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000087
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Construction Of 49 Ts Mig

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCompleted100%
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 20 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Building Plan Approval (IOD)1.pdf · uploaded 2 Aug 2017View
  • Building Plan Approval (IOD)2.pdf · uploaded 2 Aug 2017View
  • Copy of Layout Approval (in case of layout)layout.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement 1.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement 2.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement 3.pdf · uploaded 2 Aug 2017View
  • Copy of the legal title reporttitle cert 493 adgaon.pdf · uploaded 3 Aug 2017View
  • Details of encumbrances493 encumbrance.pdf · uploaded 3 Aug 2017View
  • Declaration in FORM BAfidavit0001.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title report712 493.pdf · uploaded 3 Aug 2017View
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 3 Aug 2017View
  • Architect’s Certificate on Completion of Project (Form 4)Architect Certificate 493 Adgaon .pdf · uploaded 12 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentNew Doc 2021-07-12 (2)_1.pdf · uploaded 12 Jul 2021View

Promoter documents

  • Declaration Form BAfidavit0001.pdf · uploaded 3 Aug 2017View
  • Legal Title reporttitle cert 493 adgaon.pdf · uploaded 3 Aug 2017View
  • Legal Title report712 493.pdf · uploaded 3 Aug 2017View

Technical documents

  • Building Plan Approval1.pdfView
  • Building Plan Approval2.pdfView
  • Layout Approvallayout.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

G NO 493 ADGAON

As published on MahaRERA's project page

G NO 493 ADGAON

Boundaries

North
G No 490
South
9 M Wide Colony Road
East
Plot No 2 And 3
West
Retention Land

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVaishali Somawanshi—
EngineerChaya Consulting Engineers—
OtherB P Sangle Construction Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology