Skip to content
Deedo home
Menu

Bilipatra Apartment

Completed

Nashik 422009 |Promoter: Royal Buildcon

Residential / Group HousingRERAP51600020476
15 Apr 2019Registered with MahaRERA
30 Dec 2022Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3BHK16 units in all
Land area for this project
747 sq m (8,041 sq ft)
Permissible built-up area
1,438 sq m (15,476 sq ft)
Sanctioned built-up area
1,338 sq m (14,400 sq ft)
Address
S.no. 775/4/2 Plot No. 9 And 10, Karmayogi Nagar, UntwadiPIN 422009
Designated bank account
Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Bilipatra Apartment is at latitude 0.00000, longitude 0.00000.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
15 Apr 2019
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002047615 Apr 201930 Dec 2022—Royal BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Bilipatra Apartment616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

3BHK · 16 units
TypeCarpet areaUnits
3BHK75.38 sq m · 811 sq ft4
3BHK78.87 sq m · 849 sq ft4
3BHK79.15 sq m · 852 sq ft4
3BHK79.2 sq m · 853 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000017
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Bilipatra Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWILL OBTAIN FROM NMC AFTER COMPLETION0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank Done100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingBY NMC100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting done100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationIndividual Meters Taken100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title report

Commencement certificate

Encumbrance details

Form B

Form 2

Registration certificate

Form 1

Occupancy / completion certificate

  • Occupancy / completion certificate6 Apr 2023ViewSource
Show all 32 documentsShow fewer documents

Form 4

Other (3)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 8 Apr 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 8 Apr 2019View
  • Copy of Layout Approval (in case of layout)Plot Layout.pdf · uploaded 8 Apr 2019View
  • Building Plan Approval (IOD)Sanctioned Plan.pdf · uploaded 8 Apr 2019View
  • Details of encumbrancesNo Encumbrance.pdf · uploaded 9 Apr 2019View
  • Declaration in FORM BForm B.pdf · uploaded 9 Apr 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 9 Apr 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 9 Apr 2019View
  • Proforma of Allotment letterAlottment Letter.pdf · uploaded 9 Apr 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 6 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 6 Apr 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 6 Apr 2023View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 8 Apr 2019View
  • Declaration Form BForm B.pdf · uploaded 9 Apr 2019View

Technical documents

  • Building Plan ApprovalSanctioned Plan.pdfView
  • Layout ApprovalPlot Layout.pdfView

Proforma allotment letter

  • Proforma allotment letterAlottment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik, Nashik taluka

Survey, CTS, gat or plot numbers

1010775/4/29S.NO. 775/4/2 PLOT NO. 9

As published on MahaRERA's project page

S.NO. 775/4/2 PLOT NO. 9 AND 10

Boundaries

North
12 Meter Road
South
Adj S No 994 Part
East
Plot No 11
West
Plot No 8

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAvinash Kothawade—
Chartered accountantNirav S Shah—
EngineerBhavesh Patel—
EngineerSagar S Shah—
OtherDattatray Contractor—
OtherDipak Pandit—
OtherGyaneshwar Wagh—
OtherNaragi Pawar—
Show all 13 professionalsShow fewer professionals
RoleNameRegistration no.
OtherNivrutti Khangale—
OtherPramod Chaudhari—
OtherSns Rera Consultants—
OtherVenkatappa Bonapatti—
OtherYash Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology