Shiv Pride

Completed

Nashik 422009 |Promoter: Jagdish Babubhai Kothiya

Residential / Group HousingRERAP51600013284
21 Sep 2017Registered with MahaRERA
30 Jun 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.61873, 73.75367
Shiv Pride is at latitude 18.61873, longitude 73.75367.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2022

The latest completion date on record passed 4 years and 4 months ago.

Registered
21 Sep 2017
Promised
30 Jun 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001328421 Sep 201730 Jun 2022—Jagdish Babubhai KothiyaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shiv Pride6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000024
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shiv Pride

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyObtained from NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank done100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingBy NMC100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting done100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationIndividual Meters Taken100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 29 filings listed on MahaRERA's project page

Title report (2)

Encumbrance details

Commencement certificate (2)

Form B

Allotment letter (2)

Show all 53 documentsShow fewer documents

Form 5 (3)

Form 1

Form 2

Occupancy / completion certificate

  • Occupancy / completion certificate12 Jul 2021ViewSource

Form 4

Other (4)

Registration certificate

Layout plan (2)

Building plan (2)

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 12 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout Approval.PDF · uploaded 12 Aug 2017View
  • Copy of Layout Approval (in case of layout)Plot Layout.pdf · uploaded 12 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 12 Aug 2017View
  • Details of encumbrancesSelf Declaration.pdf · uploaded 12 Aug 2017View
  • Declaration in FORM BAffidavit Cum Declaration.pdf · uploaded 12 Aug 2017View
  • Building Plan Approval (IOD)Sanctioned Plan.pdf · uploaded 12 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 12 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 12 Aug 2017View
  • Building Plan Approval (IOD)Plot Layout.pdf · uploaded 12 Aug 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 12 Aug 2017View
  • Proforma of Allotment letterAgreement to Sell.pdf · uploaded 23 Nov 2017View
  • Building Plan Approval (IOD)Revised Sanctioned Plan.pdf · uploaded 23 Nov 2017View
  • Commencement Certificates / NA Order for plotted developmentRevised Commencement.pdf · uploaded 23 Nov 2017View
  • Copy of the legal title reportRevised Title Search.pdf · uploaded 23 Nov 2017View
  • Certificates of CA (Form 5)Monika - Form 5.pdf · uploaded 30 Sep 2018View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration.pdf · uploaded 12 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 12 Jul 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 12 Jul 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 12 Jul 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 12 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 2018-19.pdf · uploaded 12 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 2019-20.pdf · uploaded 12 Jul 2021View

Technical documents

  • Layout ApprovalLayout Approval.PDFView
  • Layout ApprovalPlot Layout.pdfView
  • Building Plan ApprovalSanctioned Plan.pdfView
  • Building Plan ApprovalPlot Layout.pdfView
  • Building Plan ApprovalRevised Sanctioned Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.)

Survey, CTS, gat or plot numbers

17P N 16S No 330/1 to 7/2/3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAshok Jamdar—
Chartered accountantNirav Shah—
Chartered accountantSaril Shah—
EngineerAshok Jamdar—
OtherAlluddin Imtiyaz Chaudhari—
OtherArvindbhai V Patel—
OtherIbrar Ansari—
OtherKundan Pandit—
Show all 13 professionalsShow fewer professionals
RoleNameRegistration no.
OtherMadhav Kulkarni—
OtherShakir Khan—
OtherSNS Rera Consultants—
OtherTarkeshwar Pandit—
OtherYusuf Hamid Khan—

Source: MahaRERA project page. Contact details are not shown.