Shree Swami Samarth Row Banglow
Certificate SignedDindori, Maharashtra 422202 |Promoter: Namo Buildcon
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK15 units in all
- Address
- Gat No 936 Plot No 14 To 20, Galli No. 02, Vijay Nagar, , Nilwandi Road, PIN 422202
- Designated bank account
- 120
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Sep 2022
The latest completion date on record passed 4 years and 1 month ago.
- Registered
- 2 Jan 2020
- Promised
- 30 Sep 2022
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600023686 | 2 Jan 2020 | 30 Sep 2022 | 30 Sep 2022 | Namo Buildcon | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Shree Swami Samarth Row Banglow | 2 | 15 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
7 of 15 units booked (47%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 67.94 sq m · 731 sq ft | 3 | 3 |
| 2BHK | 69.88 sq m · 752 sq ft | 2 | 0 |
| 2BHK | 81.27 sq m · 875 sq ft | 10 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 146 filings listed on MahaRERA's project page
Finance
- PAN Cardpan card.pdf · uploaded 8 Dec 2019Source
Legal
Show all 147 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesencumbrances certificate.pdf · uploaded 8 Dec 2019Source
- 1 Copy of Layout Approval (in case of layout)plan 1.pdf · uploaded 8 Dec 2019Source
- 2 Copy of Layout Approval (in case of layout)plan 2.pdf · uploaded 8 Dec 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentplan 1.pdf · uploaded 8 Dec 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentplan 2.pdf · uploaded 8 Dec 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate 1.pdf · uploaded 8 Dec 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentcommencement certificate 2.pdf · uploaded 8 Dec 2019Source
- 3 Commencement Certificates / NA Order for plotted developmentcommencement certificate 3.pdf · uploaded 8 Dec 2019Source
- 1 Declaration in FORM BForm b affidavit.pdf · uploaded 8 Dec 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certificate 1.pdf · uploaded 8 Dec 2019Source
- 1 Proforma of Allotment letterletter of allotment.pdf · uploaded 8 Dec 2019Source
- 2 Proforma of Allotment letteragreement to sale 1.pdf · uploaded 8 Dec 2019Source
- 3 Proforma of Allotment letteragreement to sale 2.pdf · uploaded 8 Dec 2019Source
- 4 Proforma of Allotment letteragreement to sale 3.pdf · uploaded 8 Dec 2019Source
- 5 Proforma of Allotment letteragreement to sale 4.pdf · uploaded 8 Dec 2019Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 2020-21.pdf · uploaded 3 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 2019-20.pdf · uploaded 3 Dec 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 2024-25.pdf · uploaded 3 Dec 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 2023-24.pdf · uploaded 3 Dec 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 2023-24.pdf · uploaded 3 Dec 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 2023-24.pdf · uploaded 3 Dec 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 2023-24.pdf · uploaded 3 Dec 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 2022-23.pdf · uploaded 3 Dec 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 2022-23.pdf · uploaded 3 Dec 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 2022-23.pdf · uploaded 3 Dec 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 2021-22.pdf · uploaded 3 Dec 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 2021-22.pdf · uploaded 3 Dec 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 2021-22.pdf · uploaded 3 Dec 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 2021-22.pdf · uploaded 3 Dec 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 2020-21.pdf · uploaded 3 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 2020-21.pdf · uploaded 3 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 2020-21.pdf · uploaded 3 Dec 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 2022-23.pdf · uploaded 3 Dec 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 22-23.pdf · uploaded 3 Dec 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 22-23.pdf · uploaded 3 Dec 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 22-23.pdf · uploaded 3 Dec 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 23-24.pdf · uploaded 3 Dec 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 23-24.pdf · uploaded 3 Dec 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 23-24.pdf · uploaded 3 Dec 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 23-24.pdf · uploaded 3 Dec 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 24-25.pdf · uploaded 3 Dec 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 20-21.pdf · uploaded 3 Dec 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 21-22.pdf · uploaded 3 Dec 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 21-22.pdf · uploaded 3 Dec 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 21-22.pdf · uploaded 3 Dec 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 21-22.pdf · uploaded 3 Dec 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 22-23.pdf · uploaded 3 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 20-21.pdf · uploaded 3 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q 2 20-21.pdf · uploaded 3 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q 1 20-21.pdf · uploaded 3 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 19-20.pdf · uploaded 3 Dec 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 2022-23.pdf · uploaded 3 Dec 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 2022-23.pdf · uploaded 3 Dec 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 2022-23.pdf · uploaded 3 Dec 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 2023-24.pdf · uploaded 3 Dec 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 2023-24.pdf · uploaded 3 Dec 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 2023-24.pdf · uploaded 3 Dec 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 2023-24.pdf · uploaded 3 Dec 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 2024-25.pdf · uploaded 3 Dec 2024Source
- 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q-4 2022-23.pdf · uploaded 3 Dec 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 2021-22.pdf · uploaded 3 Dec 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 2021-22.pdf · uploaded 3 Dec 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 2021-22.pdf · uploaded 3 Dec 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 2021-22.pdf · uploaded 3 Dec 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 2020-21.pdf · uploaded 3 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 2020-21.pdf · uploaded 3 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 2020-21.pdf · uploaded 3 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 2020-21.pdf · uploaded 3 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 2019-20.pdf · uploaded 3 Dec 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 2022-23.pdf · uploaded 3 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 2019-20.pdf · uploaded 3 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20.pdf · uploaded 3 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-21.pdf · uploaded 3 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 2020-21.pdf · uploaded 3 Dec 2024Source
- 18 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -18.pdf · uploaded 3 Dec 2024Source
- 17 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -17.pdf · uploaded 3 Dec 2024Source
- 16 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -16.pdf · uploaded 3 Dec 2024Source
- 15 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -15.pdf · uploaded 3 Dec 2024Source
- 14 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -14.pdf · uploaded 3 Dec 2024Source
- 6 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -6.pdf · uploaded 3 Dec 2024Source
- 13 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -13.pdf · uploaded 3 Dec 2024Source
- 12 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -12.pdf · uploaded 3 Dec 2024Source
- 11 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -11.pdf · uploaded 3 Dec 2024Source
- 10 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -10.pdf · uploaded 3 Dec 2024Source
- 9 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -9.pdf · uploaded 3 Dec 2024Source
- 8 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -8.pdf · uploaded 3 Dec 2024Source
- 7 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -7.pdf · uploaded 3 Dec 2024Source
- 5 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -5.pdf · uploaded 3 Dec 2024Source
- 4 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -4.pdf · uploaded 3 Dec 2024Source
- 3 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -3.pdf · uploaded 3 Dec 2024Source
- 2 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -2.pdf · uploaded 3 Dec 2024Source
- 1 Disclosure of sold/ booked inventorySold Inventory Namo Buildcon -1.pdf · uploaded 3 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2021-22.pdf · uploaded 3 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 2021-22.pdf · uploaded 3 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23.pdf · uploaded 3 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 2022-23.pdf · uploaded 3 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24.pdf · uploaded 3 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24.pdf · uploaded 3 Dec 2024Source
Technical
Technical (Architect)
- DocumentQ4 2019-20.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2024-25.pdf · uploaded 3 Dec 2024Source
Technical (Engineer)
- DocumentQ4 2019-20.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2020-21.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2021-22.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2022-23.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ2 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ3 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ4 2023-24.pdf · uploaded 3 Dec 2024Source
- DocumentQ1 2024-25.pdf · uploaded 3 Dec 2024Source
- DocumentQ-4 2022-23.pdf · uploaded 3 Dec 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gardan Open Space
- South
- Plot No 13
- East
- 12 Mtr Road
- West
- Gat No 937
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mr Sandeep Jain And Mrs Deepali Jain | — |
| Chartered accountant | Mukesh Vitthal Khond | — |
| Engineer | Mr Sudarshan Anawade | — |
| Other | Prakash Deore | — |
Source: MahaRERA project page. Contact details are not shown.