Shree Ganesh Imperial

Completed

Shahade (R), Nandurbar 425409 |Promoter: Prakash Raman Chaudhari

19 Aug 2017Registered with MahaRERA
1 Jul 2019Promised completion
1Building
34Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
FLAT 1BHK, Shop type 1, Shop type 2, Shop type 3, Shop type 4, Shop type 534 units in all
Land area for this project
1,502 sq m (16,166 sq ft)
Permissible built-up area
2,103 sq m (22,632 sq ft)
Sanctioned built-up area
1,929 sq m (20,765 sq ft)
Address
8, 9, 13a, 13b, 14a, 14b, Sr No 101/1, 2PIN 425409
Designated bank account
Bassein Catholic Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.11170, 79.07298
Shree Ganesh Imperial is at latitude 21.11170, longitude 79.07298.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Jul 2019

The latest completion date on record passed 7 years and 3 months ago.

Registered
19 Aug 2017
Promised
1 Jul 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4970000897319 Aug 20171 Jul 2019—Prakash Raman ChaudhariProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shree Ganesh Imperial434

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

34 units registered

FLAT 1BHK · 24 unitsShop type 1 · 2 unitsShop type 2 · 2 unitsShop type 3 · 4 unitsShop type 4 · 1 unitShop type 5 · 1 unit
TypeCarpet areaUnits
FLAT 1BHK44.89 sq m · 483 sq ft24
Shop type 149.83 sq m · 536 sq ft2
Shop type 219.8 sq m · 213 sq ft2
Shop type 333.52 sq m · 361 sq ft4
Shop type 469.63 sq m · 749 sq ft1
Shop type 554.78 sq m · 590 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000016

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shree Ganesh Imperial

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBORE WELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK INSTALLED80%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting90%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING ONLY100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking050%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 24 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form b

Allotment letters

Registration certificate

Form 5

Form 4s

Others

Completion

Layout plan

Building plan

Document library

  • Declaration in FORM BForm B Declaration.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesEncumbrance Affidavit.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERT.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentConversion Correction Order in commencement.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportTitle Certificate.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)Sanctioned Building Plan.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterAgreement Of Sale.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout Plan 101 Shahada.pdf · uploaded 30 Jul 2017View
  • Certificates of CA (Form 5)Rera Audit report - SGDL.pdf · uploaded 30 Sep 2018View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 SG Imperial.pdf · uploaded 12 Oct 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Index II Declaration Of Apartment SG Imperial.pdf · uploaded 12 Oct 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSG Imperial Occupancy - Completion Certificate.pdf · uploaded 25 Nov 2019View
  • Declaration about Commencement CertificateForm D.pdf · uploaded 30 Jan 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 30 Jan 2023View
  • Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 30 Jan 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Deed Of Apartmetn-1-25.pdf · uploaded 30 Jan 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Deed Of Apartmetn-26-50.pdf · uploaded 30 Jan 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Deed Of Apartmetn-51-77.pdf · uploaded 30 Jan 2023View

Promoter documents

  • Declaration Form BForm B Declaration.pdf · uploaded 30 Jul 2017View
  • Legal Title reportTitle Certificate.pdf · uploaded 30 Jul 2017View

Technical documents

  • Building Plan ApprovalSanctioned Building Plan.pdfView
  • Layout ApprovalLayout Plan 101 Shahada.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shahade (r), Shahade taluka

Survey, CTS, gat or plot numbers

13A13B14A14B289SR NO 101/1

As published on MahaRERA's project page

8,9,13A,13B,14A,14B, SR NO 101/1,2

Boundaries

North
Plot No 7 And 15a
South
Plot No 10
East
12 M Wide Service Road And 30 M Diversion Road
West
12 M Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajendra V Chaudhari—
EngineerRajendra B Chopada—

Source: MahaRERA project page. Contact details are not shown.

Data through8 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology