Skip to content
Deedo home
Menu

Lambodar Divine

Completed

Kukdel, Nandurbar 425409 |Promoter: Krishna Pralhad Chaudhari

23 May 2018Registered with MahaRERA
30 Nov 2020Promised completion
1Building
28Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Flat type 1, Flat type 2, Shop type 1, Shop type 2, Shop type 3, Shop type 4, Shop type 528 units in all
Land area for this project
929 sq m (9,999 sq ft)
Permissible built-up area
1,115 sq m (11,999 sq ft)
Sanctioned built-up area
1,112 sq m (11,975 sq ft)
Address
Plot No. 16, 17, 18, 19, 20a, 20b In S.no. 63, Shahada Prakasha Road, Meera NagarPIN 425409
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Lambodar Divine is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Nov 2020

The latest completion date on record passed 5 years and 11 months ago.

Registered
23 May 2018
Promised
30 Nov 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4970001654223 May 201830 Nov 2020—Krishna Pralhad ChaudhariProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Lambodar Divine428

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

28 units registered

Flat type 1 · 10 unitsFlat type 2 · 10 unitsShop type 1 · 1 unitShop type 2 · 2 unitsShop type 3 · 2 unitsShop type 4 · 2 unitsShop type 5 · 1 unit
TypeCarpet areaUnits
Flat type 136.21 sq m · 390 sq ft10
Flat type 240.1 sq m · 432 sq ft10
Shop type 118.45 sq m · 199 sq ft1
Shop type 218.91 sq m · 204 sq ft2
Shop type 319.36 sq m · 208 sq ft2
Shop type 420.25 sq m · 218 sq ft2
Shop type 520.92 sq m · 225 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Lambodar Divine

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL DONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK ONLY100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONLY ELECTRIC METER INSTALLATION100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingIN MARGINAL DISTANCES100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 29 filings listed on MahaRERA's project page

Commencement certificates

Form b

Title

Encumbrance

Others

Completion

Form 5

Registration certificate

Layout plans

Building plan

Allotment letter

Document library

  • Details of encumbrancesEncumbrance Affidavit.pdf · uploaded 15 May 2018View
  • Commencement Certificates / NA Order for plotted developmentBP SDO.pdf · uploaded 15 May 2018View
  • Declaration in FORM BForm B Affidavit.pdf · uploaded 15 May 2018View
  • Commencement Certificates / NA Order for plotted developmentBP TP.pdf · uploaded 15 May 2018View
  • Copy of the legal title reportTitle Search Report.pdf · uploaded 15 May 2018View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 15 May 2018View
  • Proforma of Allotment letterDraft Agreement of sale.pdf · uploaded 15 May 2018View
  • Copy of Layout Approval (in case of layout)Layout Sanction Order.pdf · uploaded 15 May 2018View
  • Copy of Layout Approval (in case of layout)Layout plan.pdf · uploaded 15 May 2018View
  • Other7-12 Extract.pdf · uploaded 15 May 2018View
  • OtherAmalgamation Order.pdf · uploaded 15 May 2018View
  • OtherCommercial NA Order.pdf · uploaded 15 May 2018View
  • OtherResidential NA Order.pdf · uploaded 15 May 2018View
  • OtherCompletion Certificate-compressed.pdf · uploaded 18 Jul 2019View
  • Status of Conveyance3.pdf · uploaded 1 Aug 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Architect Completion_final.pdf · uploaded 26 Aug 2019View
  • Annual Audit Report of Statutory CA (Form 5)Form 5.pdf · uploaded 4 Oct 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentArchitect Completion_final.pdf · uploaded 4 Oct 2019View

Promoter documents

  • Declaration Form BForm B Affidavit.pdf · uploaded 15 May 2018View
  • Legal Title reportTitle Search Report.pdf · uploaded 15 May 2018View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLayout Sanction Order.pdfView
  • Layout ApprovalLayout plan.pdfView

Other legal documents

  • Other7-12 Extract.pdfView
  • OtherAmalgamation Order.pdfView
  • OtherCommercial NA Order.pdfView
  • OtherResidential NA Order.pdfView
  • OtherCompletion Certificate-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft Agreement of sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kukdel, Shahade taluka

Survey, CTS, gat or plot numbers

17181920A20B IN S.NO. 6363PLOT NO. 16

As published on MahaRERA's project page

PLOT NO. 16, 17, 18, 19, 20A, 20B IN S.NO. 63

Boundaries

North
S No 62 1
South
9 Meter Colony Road
East
12 Meter Colony Road
West
6 Meter Colony Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajendra V Chaudhari—
EngineerRajendra B Chopda—

Source: MahaRERA project page. Contact details are not shown.

Data through8 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology