Construction of 14 Rowhouses at Waddhamna Nagpur

Completed

Waddhamna, Nagpur 441110 |Promoter: MHADA(Nagpur Board)

Residential / Group HousingRERAP50500012638
6 Sep 2017Registered with MahaRERA
31 Dec 2017Promised completion
14Buildings
15Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
14
Unit types
Duplex, Dupex15 units in all
Land area for this project
1,834 sq m (19,736 sq ft)
Permissible built-up area
1,834 sq m (19,736 sq ft)
Sanctioned built-up area
1,834 sq m (19,736 sq ft)
Recreational open space
6,828 sq m (73,495 sq ft)
Address
116/1 to 5PIN 441110
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.14745, 78.96841
Construction of 14 Rowhouses at Waddhamna Nagpur is at latitude 21.14745, longitude 78.96841.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
6 Sep 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000126386 Sep 201731 Dec 2017—MHADA(Nagpur Board)Project page

14 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

15 units registered

Duplex · 14 unitsDupex · 1 unit
BuildingTypeCarpet areaUnits
Row House No 1Duplex104.82 sq m · 1,128 sq ft1
Row House No 10Duplex104.82 sq m · 1,128 sq ft1
Row House No 11Duplex104.82 sq m · 1,128 sq ft1
Row House No 12Duplex104.82 sq m · 1,128 sq ft1
Row House No 13Duplex104.82 sq m · 1,128 sq ft1
Row House No 14Duplex104.82 sq m · 1,128 sq ft1
Row House No 2Duplex104.82 sq m · 1,128 sq ft1
Row House No 2Duplex104.82 sq m · 1,128 sq ft1
Row House No 3Dupex104.82 sq m · 1,128 sq ft1
Row House No 4Duplex104.82 sq m · 1,128 sq ft1
Row House No 5Duplex104.82 sq m · 1,128 sq ft1
Row House No 6Duplex104.82 sq m · 1,128 sq ft1
Row House No 7Duplex104.82 sq m · 1,128 sq ft1
Row House No 8Duplex104.82 sq m · 1,128 sq ft1
Row House No 9Duplex104.82 sq m · 1,128 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Row House No 1Closed/Covered00000
Row House No 1Open Space00000
Row House No 10Closed/Covered00001
Row House No 10Open Space00000
Row House No 11Closed/Covered00000
Row House No 11Open Space00001
Row House No 12Closed/Covered00000
Row House No 12Open Space00000
Row House No 13Closed/Covered00000
Row House No 13Open Space00000
Row House No 14Closed/Covered00000
Row House No 14Open Space00000
Row House No 2Closed/Covered00001
Row House No 2Open Space00000
Row House No 3Closed/Covered00000
Row House No 3Open Space00000
Row House No 4Closed/Covered00000
Row House No 4Open Space00000
Row House No 5Closed/Covered00000
Row House No 5Open Space00000
Row House No 6Closed/Covered00000
Row House No 6Open Space00000
Row House No 7Closed/Covered00000
Row House No 7Open Space00000
Row House No 8Closed/Covered00000
Row House No 8Open Space00000
Row House No 9Closed/Covered00000
Row House No 9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House No 1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 10

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 11

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 12

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 13

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises99%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Row House No 14

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 2

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsWork Mostly completed100%
  • Water Supplyinternal water suply work completed . External wor100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)work is in progress100%
  • Storm Water Drainswork mostly completed100%
  • Landscaping & Tree Plantingwork is in progress95%
  • Street Lightingwork is completed. commissioning is to be done95%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Waterwork is in progress100%
  • Solid Waste Management And Disposalwork is in progress100%
  • Water conservation /Rain water harvestingwork is in progress100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementswork mostly completed100%
  • Electrical meter room, sub-station, receiving stationwork completed. commissioning is to be done100%
  • Aggregate area of recreational Open Spacework is in progress100%
  • Open Parkingwork mostly completed100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

2 documents held by Deedo, 20 filings listed on MahaRERA's project page

Registration certificate

Other

Document library

  • Proforma of Allotment letterNew Doc 2017-07-11 (6).pdf · uploaded 11 Jul 2017Source
  • Declaration in FORM BNew Doc 2017-07-11 (3).pdf · uploaded 11 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)New Doc 2017-07-11 (2) (1).pdf · uploaded 11 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)New Doc 2017-07-11 (3) (1).pdf · uploaded 11 Jul 2017Source
  • Commencement Certificates / NA Order for plotted developmentNew Doc 2017-07-11 (4) (1).pdf · uploaded 11 Jul 2017Source
  • Copy of the legal title reportNew Doc 2017-07-11 (5) (1).pdf · uploaded 11 Jul 2017Source
  • Details of encumbrancesNew Doc 2017-07-12.pdf · uploaded 12 Jul 2017Source
  • Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 17 Jul 2017Source
  • Building Plan Approval (IOD)12345_nopassword.pdf · uploaded 17 Jul 2017Source
  • Details of encumbrancesNew Doc 2017-07-21_1.pdf · uploaded 26 Jul 2017Source
  • OtherNew Doc 2018-03-12.pdf · uploaded 12 Mar 2018Source
  • OtherNew Doc 2018-03-28.pdf · uploaded 28 Mar 2018Source
  • Certificates of Architect (Form 4)New Doc 2018-03-28.pdf · uploaded 28 Mar 2018Source

Promoter documents

  • Declaration Form BNew Doc 2017-07-11 (3).pdf · uploaded 11 Jul 2017Source
  • Legal Title reportNew Doc 2017-07-11 (5) (1).pdf · uploaded 11 Jul 2017Source

Technical documents

  • Layout Approvallayout plan.pdfSource
  • Building Plan Approval12345_nopassword.pdfSource

Other legal documents

Proforma allotment letter

  • Proforma allotment letterNew Doc 2017-07-11 (6).pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Waddhamna, Hingna taluka

Survey, CTS, gat or plot numbers

116/1 to 5

As published on MahaRERA's project page

116/1 to 5

Boundaries

North
Proposed Construction of 14 Row Houses
South
Layout Road and open Space
East
Layout internal Road
West
Layout Internal Road and EWS Tenements

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin APatil—
EngineerY P Kajale—
OtherB G Shirke Const Tech Pvt Ltd—
OtherSuyog Nevse—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology