Skip to content
Deedo home
Menu

Shree Laxmi Vyankatesh Apartments

Active

Nagpur (M Corp.), Nagpur 440010 |Promoter: Shreeniwas Homemakers

Residential / Group HousingRERAP50500081075
26 Dec 2025Registered with MahaRERA
31 Dec 2027Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
743 sq m (7,999 sq ft)
Permissible built-up area
2,793 sq m (30,068 sq ft)
Sanctioned built-up area
2,793 sq m (30,068 sq ft)
Recreational open space
0 sq m (0 sq ft)
Address
Plot No R 11 In Block R Kh No 4/1 4/2 7/2 24 And 25/1 2-3-4 City Survey No 348 Sheet No 34, Laxmi Nagar, Laxmi NagarPIN 440010
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shree Laxmi Vyankatesh Apartments is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
26 Dec 2025
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050008107526 Dec 202531 Dec 2027—Shreeniwas HomemakersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shree Laxmi Vyankatesh Apartments14—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space18180036

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shree Laxmi Vyankatesh Apartments

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply15%
  • Sewerage (Chamber, Lines, Septic Tank , STP)15%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingTHE WORK IS YET TO BE STARTED0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsTHE WORK IS YET TO BE STARTED0%
  • Electrical meter room, sub-station, receiving stationTHE WORK IS YET TO BE STARTED0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

37 documents held by Deedo, 50 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportLEGAL TITLE REPORT_compressed.pdf · uploaded 30 Mar 2025View
  • Copy of Layout Approval (in case of layout)R11 DWG.pdf · uploaded 30 Mar 2025View
  • Commencement Certificates / NA Order for plotted developmentNMC SANCTION PERMIT.pdf · uploaded 30 Mar 2025View
  • Building Plan Approval / NA Order for plotted developmentR11 DWG.pdf · uploaded 30 Mar 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate JHELAM_compressed.pdf · uploaded 30 Mar 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsABHISHEK DADHE.pdf · uploaded 30 Mar 2025View
  • Disclosure of Interest in Other Real Estate OrganizationsCHANDRAHAS DADHE.pdf · uploaded 30 Mar 2025View
  • Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A.pdf · uploaded 30 Mar 2025View
  • Deviation Report with respect to Allotment letterDECLARATION ABOUT DEVIATION REPORT IN ALLOTMENT LETTER.pdf · uploaded 30 Mar 2025View
  • Deviation Report with respect to model copy of AgreementDECLERATION ABOUT IN DEVIATION REPORT IN AGREEMENT TO SALE.pdf · uploaded 30 Mar 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificare_compressed.pdf · uploaded 30 Mar 2025View
  • Declaration in FORM BABHIESHEK DADHE.pdf · uploaded 6 Apr 2025View
  • Proforma of Allotment letterLETTER OF ALLOTMENT-RERA-1 (NEW).pdf · uploaded 21 May 2025View
  • a Details of encumbrances concerned to FinanceDECLERATION OF LEGAL EMCUMBRANCE.pdf · uploaded 21 May 2025View
  • b Details of encumbrances concerned to LegalDECLERATION OF LEGAL EMCUMBRANCE.pdf · uploaded 21 May 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)ilovepdf_merged.pdf · uploaded 3 Jun 2025View
  • Disclosure for secured/unsecured finance availed for the projectsecured unsecured undertaking.pdf · uploaded 3 Jun 2025View
  • Other – LegalUNDERTAKING (1).pdf · uploaded 27 Jun 2025View
  • Declaration about Commencement CertificateCOMMENCEMENT CERTIFICATE (2).pdf · uploaded 27 Jun 2025View
  • Other – TechnicalAnnecure A Declaraation cum undertaking.pdf · uploaded 27 Jun 2025View
  • Other – LegalUNDERTAKING - 2.pdf · uploaded 27 Jun 2025View
  • a Details of encumbrances concerned to FinanceFINANCIAL ENCUMBRANCE.pdf · uploaded 1 Jul 2025View
  • CERSAI detailsNON ENCUMBRANCE CERSAI.pdf · uploaded 1 Jul 2025View
  • b Details of encumbrances concerned to LegalFINANCIAL ENCUMBRANCE.pdf · uploaded 1 Jul 2025View
  • Other – TechnicalUNDERTAKING - 3.pdf · uploaded 1 Jul 2025View
  • Other – TechnicalDeclaration cum undertaking for no sale (1).pdf · uploaded 7 Jul 2025View
  • Proforma of Agreement for saleAGREEMENT FOR SALE Shreeniwas.pdf · uploaded 26 Sep 2025View
  • Other – FinanceDECLARATION FOR BANK ACC.pdf · uploaded 13 Nov 2025View
  • Other – FinanceDECLARATION FOR UNITS.pdf · uploaded 13 Nov 2025View
  • Form 1FORM 1-Architect Certificate Dec 25.pdf · uploaded 25 Jun 2026View
  • Form 2Form 2 Engineer Certificate Dec 25.pdf · uploaded 25 Jun 2026View
  • Disclosure of Sold and Booked InventorySold Booked Inventory Disclosure Dec 25.pdf · uploaded 25 Jun 2026View
  • Form 1FORM 1-Architect Certificate March 26.pdf · uploaded 25 Jun 2026View
  • Form 2Form 2 Engineer Certificate March 26.pdf · uploaded 25 Jun 2026View
  • Disclosure of Sold and Booked InventorySold Booked Inventory March 26.pdf · uploaded 25 Jun 2026View
  • Withdrawal Update Form 1Architect Certificate JHELAM_compressed.pdf · uploaded 12 Aug 2026View
  • Withdrawal Update Form 2Engineer Certificare_compressed.pdf · uploaded 12 Aug 2026View
  • Withdrawal Update Form 1Architect Certificate JHELAM_compressed.pdf · uploaded 12 Aug 2026View
  • Withdrawal Update Form 2Laxmi vyank engineer.pdf · uploaded 12 Aug 2026View
  • Withdrawal Update Form 1Architect cert Laxmi vyak.pdf · uploaded 14 Aug 2026View
  • Withdrawal Update Form 2Laxmi vyank engineer.pdf · uploaded 14 Aug 2026View

Promoter documents

  • Legal Title reportLEGAL TITLE REPORT_compressed.pdf · uploaded 30 Mar 2025View
  • Declaration Form BABHIESHEK DADHE.pdf · uploaded 6 Apr 2025View

Technical documents

  • Layout ApprovalR11 DWG.pdfView
  • Building Plan ApprovalR11 DWG.pdfView

Other legal documents

  • Other – LegalUNDERTAKING (1).pdfView
  • Other – LegalUNDERTAKING - 2.pdfView

Financial documents

  • Other – FinanceDECLARATION FOR BANK ACC.pdf · uploaded 13 Nov 2025View
  • Other – FinanceDECLARATION FOR UNITS.pdf · uploaded 13 Nov 2025View

Proforma allotment letter

  • Proforma allotment letterLETTER OF ALLOTMENT-RERA-1 (NEW).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

25/1 234 CITY SURVEY NO 348 SHEET NO25/1 2-3-4 CITY SURVEY NO 348 SHEET NO 34348PLOT NO R 11 IN BLOCK R KH NO 4/1 4/2 7/2 24PLOT NO R 11 IN BLOCK R KH NO 4/1 4/2 7/2 24

As published on MahaRERA's project page

PLOT NO R 11 IN BLOCK R KH NO 4/1 4/2 7/2 24 AND 25/1 2-3-4 CITY SURVEY NO 348 SHEET NO 34

Boundaries

North
Conservancy Laneand Plot No 12 In Block R
South
40ft Wide Road
East
Plot No 10 In Block R
West
Open Land Belonging To Society

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHarish Kalikar—
Chartered accountantCa Sumit Chandwani—
Chartered accountantKartik Sunil Kejdiwal—
EngineerAbhishek Wasnik—
OtherSumit Chandwani—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology