Skip to content
Deedo home
Menu

Uranus Apartment

Completed

Nagpur (M Corp.), Nagpur 440022 |Promoter: Dhuni Constructions Pvt. Ltd.

Residential / Group HousingRERAP50500052289
9 Aug 2023Registered with MahaRERA
30 Jun 2025Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
2,199 sq m (23,668 sq ft)
Permissible built-up area
2,199 sq m (23,668 sq ft)
Sanctioned built-up area
2,199 sq m (23,668 sq ft)
Planning authority
Nagpur Improvement Trust
Address
Plot No. 5, 6, 7, 8, 9 C.T.S. No. 154, Kh.No. 19/1Ja, 19/1Kha, 20/1Kha, Nagpur, Mouza-Sonegaon Tah and Dist. NagpurPIN 440022
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Uranus Apartment is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2025

The latest completion date on record passed 1 year and 4 months ago.

Registered
9 Aug 2023
Promised
30 Jun 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000522899 Aug 202330 Jun 2025—Dhuni Constructions Pvt. Ltd.Project page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Uranus Apartment5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000033

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Uranus Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWork Completed100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Work Completed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingWork Completed100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWork Completed100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWork Completed100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

58 documents held by Deedo, 74 filings listed on MahaRERA's project page

Commencement certificates

Form 1s

Form 2s

Allotment letters

Others

Encumbrances

Form b

Title

Registration certificate

Form 4

Form 5s

Form 2as

Completion

Layout plan

Document library

  • Deviation Report with respect to Allotment letterDeclaration on Deviation on Allotment Letter.pdf · uploaded 24 May 2023View
  • Deviation Report with respect to model copy of AgreementDeclaration on Deviation on Agreement for sale.pdf · uploaded 24 May 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 24 May 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE.pdf · uploaded 24 May 2023View
  • Commencement Certificates / NA Order for plotted developmentCommencemnt Certificate.pdf · uploaded 24 May 2023View
  • Copy of Layout Approval (in case of layout)Sacsion Map.pdf · uploaded 27 May 2023View
  • Building Plan Approval / NA Order for plotted developmentSacsion Map.pdf · uploaded 27 May 2023View
  • Proforma of Agreement for saleAFS.pdf · uploaded 27 May 2023View
  • Proforma of Allotment letterAL.pdf · uploaded 27 May 2023View
  • a Details of encumbrances concerned to FinanceFINANCE.pdf · uploaded 27 May 2023View
  • b Details of encumbrances concerned to LegalFINANCE.pdf · uploaded 27 May 2023View
  • a Details of encumbrances concerned to FinanceNo Encumbrance Letter Legal.pdf · uploaded 27 May 2023View
  • b Details of encumbrances concerned to LegalNo Encumbrance Letter Legal.pdf · uploaded 27 May 2023View
  • Declaration in FORM BForm B.pdf · uploaded 27 May 2023View
  • CERSAI detailsCersai Report Concern.pdf · uploaded 28 May 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Separate Bank Account for real estate projects-1.pdf · uploaded 29 May 2023View
  • Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT.pdf · uploaded 26 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexurE A(3).pdf · uploaded 27 Jul 2023View
  • Copy of the legal title reportSearch Report Uranus Apartment.pdf · uploaded 2 Aug 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Sept 2023.pdf · uploaded 6 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Sept 2023.pdf · uploaded 6 Aug 2024View
  • Disclosure of sold/ booked inventoryDisclosure of sold - Sept 2023.pdf · uploaded 6 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Dec 2023.pdf · uploaded 6 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Dec 2023.pdf · uploaded 6 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - March 2024.pdf · uploaded 6 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - March 2024.pdf · uploaded 6 Aug 2024View
  • Disclosure of sold/ booked inventoryDisclosure of sold - Dec 2023.pdf · uploaded 6 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - June 2024.pdf · uploaded 6 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - June 2024.pdf · uploaded 6 Aug 2024View
  • Disclosure of sold/ booked inventoryDisclosure of sold - March 2024.pdf · uploaded 6 Aug 2024View
  • Disclosure of sold/ booked inventoryDisclosure of sold - June 2024.pdf · uploaded 6 Aug 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Uranus - Form 1 - September 2024.pdf · uploaded 4 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Uranus - Form 2 - September 2024.pdf · uploaded 4 Dec 2024View
  • Disclosure of sold/ booked inventoryUranus - Disclosure - September 2024.pdf · uploaded 4 Dec 2024View
  • Architect’s Certificate on Completion of Project (Form 4)URANUS RERA 20122024.pdf · uploaded 20 Dec 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Certificate.pdf · uploaded 20 Dec 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentURANUS RERA 20122024.pdf · uploaded 13 Mar 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Uranus - Form 1 - December 2024.pdf · uploaded 22 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Uranus - Form 2 - December 2024.pdf · uploaded 22 Apr 2025View
  • Disclosure of sold/ booked inventoryUranus - Disclosure - December 2024.pdf · uploaded 22 Apr 2025View
  • Form 1Architect Certificate - Sept 2023.pdf · uploaded 24 Dec 2025View
  • Form 2Engineer Certificate - Sept 2023.pdf · uploaded 24 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold - Sept 2023.pdf · uploaded 24 Dec 2025View
  • Form 1Architect Certificate - Dec 2023.pdf · uploaded 24 Dec 2025View
  • Form 2Engineer Certificate - Dec 2023.pdf · uploaded 24 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold - Dec 2023.pdf · uploaded 24 Dec 2025View
  • Form 1Architect Certificate - March 2024.pdf · uploaded 24 Dec 2025View
  • Form 2Engineer Certificate - March 2024.pdf · uploaded 24 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold - March 2024.pdf · uploaded 24 Dec 2025View
  • Form 1Architect Certificate - June 2024.pdf · uploaded 24 Dec 2025View
  • Form 2Engineer Certificate - June 2024.pdf · uploaded 24 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold - June 2024.pdf · uploaded 24 Dec 2025View
  • Form 1Uranus - Form 1 - September 2024.pdf · uploaded 24 Dec 2025View
  • Form 2Uranus - Form 2 - September 2024.pdf · uploaded 24 Dec 2025View
  • Disclosure of Sold and Booked InventoryUranus - Disclosure - September 2024.pdf · uploaded 24 Dec 2025View
  • Form 1Uranus - Form 1 - December 2024.pdf · uploaded 24 Dec 2025View
  • Form 2Uranus - Form 2 - December 2024.pdf · uploaded 24 Dec 2025View
  • Disclosure of Sold and Booked InventoryUranus - Disclosure - December 2024.pdf · uploaded 24 Dec 2025View
  • Form 5 (FY 2023-2024)Uranus Apartment - Form 5 - 2023-24.pdf · uploaded 24 Dec 2025View
  • Form 5 (FY 2024-2025)Uranus Apartment - Form 5 - 2024-25.pdf · uploaded 24 Dec 2025View
  • Form 1Uranus - Form 1 - March 2025.pdf · uploaded 26 Dec 2025View
  • Form 2Form 2 - March 2025.pdf · uploaded 26 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure - March 2025.pdf · uploaded 26 Dec 2025View
  • Form 1Form 1 - June 2025.pdf · uploaded 26 Dec 2025View
  • Form 2Form 2 - June 2025.pdf · uploaded 26 Dec 2025View
  • Disclosure of Sold and Booked InventoryDisclosure - June 2025.pdf · uploaded 26 Dec 2025View
  • Form 2A (FY 2023-2024)FORM 2A - 2023-2024.pdf · uploaded 26 Dec 2025View
  • Form 2A (FY 2024-2025)FORM 2A - 2024-2025.pdf · uploaded 26 Dec 2025View
  • Occupational CertificateOC Certificate.pdf · uploaded 27 Jan 2026View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 27 May 2023View
  • Legal Title reportSearch Report Uranus Apartment.pdf · uploaded 2 Aug 2023View

Technical documents

  • Layout ApprovalSacsion Map.pdfView
  • Building Plan ApprovalSacsion Map.pdfView

Proforma allotment letter

  • Proforma allotment letterAL.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

19/1Kha20/1Kha6789 C.T.S. No. 154Kh.No. 19/1JaPlot No. 5

As published on MahaRERA's project page

Plot No. 5,6,7,8,9 C.T.S. No. 154, Kh.No. 19/1Ja, 19/1Kha, 20/1Kha

Boundaries

North
Other Layout
South
9 Mtrs Wide Road
East
Plot No 4 Plot No 6
West
Plot No 7 Plot No 9

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSwapnil Gode—
Chartered accountantAbdul Qadir—
Chartered accountantRavindra Lashkare—
Chartered accountantRishi Lashkare—
EngineerShri Sai Infra Venture—
EngineerSwapnil Gode—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology