Skip to content
Deedo home
Menu

Ujra Regency II

Completed

Nagpur (M Corp.), Nagpur 440017 |Promoter: Vishal Umesh Chouksey

Residential / Group HousingRERAP50500021296
21 Jun 2019Registered with MahaRERA
30 Dec 2020Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2 BHK FLAT, 3 BHK FLAT10 units in all
Land area for this project
418 sq m (4,500 sq ft)
Permissible built-up area
821 sq m (8,836 sq ft)
Sanctioned built-up area
821 sq m (8,836 sq ft)
Recreational open space
418 sq m (4,500 sq ft)
Address
Plot No 31/Cts No 51, Plot No 31, House No 800, Ward No 53, Cs.no. 51, Sheet No 4, Mouza - Bhankheda, LashkaribaghPIN 440017
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.16497, 79.09694
Ujra Regency II is at latitude 21.16497, longitude 79.09694.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2020

The latest completion date on record passed 5 years and 10 months ago.

Registered
21 Jun 2019
Promised
30 Dec 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050002129621 Jun 201930 Dec 2020—Vishal Umesh ChoukseyProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Ujra Regency II2410

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

2 BHK FLAT · 4 units3 BHK FLAT · 6 units
TypeCarpet areaUnits
2 BHK FLAT54.43 sq m · 586 sq ft2
2 BHK FLAT54.46 sq m · 586 sq ft2
3 BHK FLAT62.21 sq m · 670 sq ft4
3 BHK FLAT108.87 sq m · 1,172 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000017
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Ujra Regency II

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterCOMPLETED100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Registration certificate

Completion

Form 4

Form 5

Others

Layout plan

Allotment letter

Document library

  • Building Plan Approval (IOD)SANCTIONED MAP_compressed.pdf · uploaded 7 Jun 2019View
  • Copy of Layout Approval (in case of layout)SANCTIONED MAP_compressed.pdf · uploaded 7 Jun 2019View
  • Details of encumbrancesDECLARATION PDF- NO INCUMBRANCE.pdf · uploaded 11 Jun 2019View
  • Declaration in FORM Bform b.pdf · uploaded 11 Jun 2019View
  • Commencement Certificates / NA Order for plotted developmentPdf- COMENCEMENT CERTIFICATE.pdf · uploaded 11 Jun 2019View
  • Copy of the legal title reportsearch report.pdf · uploaded 11 Jun 2019View
  • Proforma of Allotment letterDECLARATION.pdf · uploaded 11 Jun 2019View
  • Architect’s Certificate on Completion of Project (Form 4)ARCHITECT COMPLETION CERTIFICATE.pdf · uploaded 4 Mar 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE.pdf · uploaded 4 Mar 2022View
  • OtherENGINEER COMPLETION CERTIFICATE.pdf · uploaded 4 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.pdf · uploaded 19 May 2022View

Promoter documents

  • Declaration Form Bform b.pdf · uploaded 11 Jun 2019View
  • Legal Title reportsearch report.pdf · uploaded 11 Jun 2019View

Technical documents

  • Building Plan ApprovalSANCTIONED MAP_compressed.pdfView
  • Layout ApprovalSANCTIONED MAP_compressed.pdfView

Other legal documents

  • OtherENGINEER COMPLETION CERTIFICATE.pdfView

Proforma allotment letter

  • Proforma allotment letterDECLARATION.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

51PLOT NO 31/CTS NO 51

As published on MahaRERA's project page

PLOT NO 31/CTS NO 51

Boundaries

North
Plot No 32
South
Plot No 30
East
Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHarish Chandnani—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology