Skip to content
Deedo home
Menu

The West High

Lapsed

Nagpur (M Corp.), Nagpur 440010 |Promoter: Latitude Infraventure

14 Aug 2017Registered with MahaRERA
31 Jan 2021Promised completion
1Building
53Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Lapsed
Buildings
1
Unit types
Shop53 units in all
Land area for this project
1,171 sq m (12,600 sq ft)
Permissible built-up area
2,931 sq m (31,547 sq ft)
Sanctioned built-up area
2,268 sq m (24,411 sq ft)
Address
236PIN 440010
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.07992, 72.91744
The West High is at latitude 19.07992, longitude 72.91744.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jan 2021

The latest completion date on record passed 5 years and 9 months ago.

Registered
14 Aug 2017
Promised
31 Jan 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000661114 Aug 201731 Jan 2021—Latitude InfraventureProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
The West High1053

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

53 units registered

Shop · 53 units
TypeCarpet areaUnits
Shop8.16 sq m · 88 sq ft1
Shop12.98 sq m · 140 sq ft2
Shop14.44 sq m · 155 sq ft1
Shop14.6 sq m · 157 sq ft1
Shop14.61 sq m · 157 sq ft1
Shop14.63 sq m · 157 sq ft6
Shop14.8 sq m · 159 sq ft3
Shop16.08 sq m · 173 sq ft1
Shop16.68 sq m · 180 sq ft2
Shop18.02 sq m · 194 sq ft2
Shop20.93 sq m · 225 sq ft1
Shop29.77 sq m · 320 sq ft6
Shop29.77 sq m · 320 sq ft1
Shop45.97 sq m · 495 sq ft1
Shop46.58 sq m · 501 sq ft1
Shop49.47 sq m · 532 sq ft6
Shop59.79 sq m · 644 sq ft1
Shop66.63 sq m · 717 sq ft1
Shop68.1 sq m · 733 sq ft6
Shop78.05 sq m · 840 sq ft4
Shop83.45 sq m · 898 sq ft2
Shop88.14 sq m · 949 sq ft1
Shop91.58 sq m · 986 sq ft1
Shop154.28 sq m · 1,661 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

The West High

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC AND STP IS NOT PROVIDED100%
  • Storm Water DrainsAS PER PLAN100%
  • Landscaping & Tree PlantingAS PER PLAN100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER PLAN100%
  • Electrical meter room, sub-station, receiving station100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

37 documents held by Deedo, 109 filings listed on MahaRERA's project page

Form bs

Registration certificate

Form 1s

Form 2a

Form 2s

Others

Allotment letter

Document library

  • Copy of the legal title reportCLEAR TITLR NON EMCUMBRANCE.pdf · uploaded 28 Jul 2017Source
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 28 Jul 2017Source
  • Building Plan Approval (IOD)WEST HIGH MAP FINAL.pdf · uploaded 28 Jul 2017Source
  • Details of encumbrancesCLEAR TITLR NON EMCUMBRANCE.pdf · uploaded 28 Jul 2017Source
  • Declaration in FORM BNew Doc 2017-07-29.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterNew Doc 2017-07-30 (1).pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)New Doc 2017-07-30_2.pdf · uploaded 30 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA ARCHITECT CERTIFICATE.pdf · uploaded 30 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SV ENGG.pdf · uploaded 30 Jul 2017Source
  • Certificates of CA (Form 5)form5.pdf · uploaded 30 Sep 2018Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)1 Certificates of CA (Form 5).pdf · uploaded 17 Mar 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)1 Certificates of CA (Form 5).pdf · uploaded 17 Mar 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2017-1.pdf · uploaded 23 Nov 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2017-2.pdf · uploaded 23 Nov 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2018-3.pdf · uploaded 23 Nov 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2018-4.pdf · uploaded 23 Nov 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2018-5.pdf · uploaded 23 Nov 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2018-6.pdf · uploaded 23 Nov 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2019-7.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2019-8.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2019-9.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2019-10.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2020-11.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2020-12.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2020-13.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2020-14.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2021-15.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2021-16.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2021-17.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2021-18.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2022-19.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2022-20.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2022-21.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2022-22.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2023-23.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2023-24.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2023-25.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Dec-2023-26.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Mar-2024-27.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Jun-2024-28.pdf · uploaded 23 Nov 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)TWH_Sep-2024-29.pdf · uploaded 23 Nov 2024Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC-1.pdf · uploaded 3 Dec 2024Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC-2.pdf · uploaded 3 Dec 2024Source
  • Architect’s Certificate on Completion of Project (Form 4)FORM-4 THE WEST HIGH.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A_2018.pdf · uploaded 3 Dec 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A_2019.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A_2021.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM-2A_2020.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM-2A_2021.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM-2A_2022.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM-2A_2023.pdf · uploaded 3 Dec 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM-2A_2024.pdf · uploaded 3 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_JUNE 18.pdf · uploaded 4 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_SEPT 18.pdf · uploaded 4 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_DEC 18.pdf · uploaded 4 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_MAR 19.pdf · uploaded 4 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_JUNE 19.pdf · uploaded 4 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_SEPT 19.pdf · uploaded 4 Dec 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_DEC 19.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_MAR 20.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_JUNE 20.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_SEPT 20.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_DEC 20.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_MAR 21.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_JUNE 21.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_SEPT 21.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_DEC 21.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_MAR 22.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_JUNE 22.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_SEPT 22.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_DEC 22.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ MAR 23.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ JUNE 23.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ SEPT 23.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ DEC 23.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ MAR 24.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ JUNE 24.pdf · uploaded 4 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)THE WEST HIGH_Form-2-Engineers Certificate_ SEPT 24.pdf · uploaded 4 Dec 2024View
  • Disclosure of sold/ booked inventorySOLD_JUNE-21.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_SEP-21.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_DEC-21.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_MAR-22.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_JUNE-22.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_SEP-22.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_DEC-22.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_MAR-23.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_JUNE-23.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_SEP-23.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_DEC-23.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_MAR-24.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_JUNE-24.pdf · uploaded 4 Dec 2024Source
  • Disclosure of sold/ booked inventorySOLD_SEP-24.pdf · uploaded 4 Dec 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 TWH MAR 20.pdf · uploaded 4 Dec 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 TWH MAR 21.pdf · uploaded 4 Dec 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 TWH MAR 22.pdf · uploaded 4 Dec 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 TWH MAR 23.pdf · uploaded 4 Dec 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 TWH MAR 24.pdf · uploaded 4 Dec 2024Source
  • Declaration in FORM Bform b the west highhh.pdf · uploaded 6 Dec 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM-1 THE WEST HIGH 02-01-2025.pdf · uploaded 4 Jan 2025View
  • Disclosure of sold/ booked inventorySOLD-UNSOLD-D-24.pdf · uploaded 19 Jan 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 The West High.pdf · uploaded 22 Apr 2025Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 The West High 1.pdf · uploaded 22 Apr 2025View
  • Disclosure of sold/ booked inventoryThe West High Sold Unsold.pdf · uploaded 22 Apr 2025View

Promoter documents

  • Legal Title reportCLEAR TITLR NON EMCUMBRANCE.pdf · uploaded 28 Jul 2017Source
  • Declaration Form BNew Doc 2017-07-29.pdf · uploaded 29 Jul 2017View
  • Declaration Form Bform b the west highhh.pdf · uploaded 6 Dec 2024View

Technical documents

  • Layout ApprovalNew Doc 2017-07-30_2.pdfSource
  • Building Plan ApprovalWEST HIGH MAP FINAL.pdfSource

Proforma allotment letter

  • Proforma allotment letterNew Doc 2017-07-30 (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

236

As published on MahaRERA's project page

236

Boundaries

North
Plot No 235
South
Plot No 237
East
Lane
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLokesh Kadu—
OtherManoj Pandit—

Source: MahaRERA project page. Contact details are not shown.