Completed

Nagpur (M Corp.), Nagpur 440022 |Promoter: Magniton Infra

Residential / Group HousingRERAP50500012771
7 Sep 2017Registered with MahaRERA
31 Mar 2018Promised completion
1Building
16Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2 BHK 3 BHK 4 BHK16 units in all
Land area for this project
641 sq m (6,905 sq ft)
Permissible built-up area
1,460 sq m (15,715 sq ft)
Sanctioned built-up area
1,460 sq m (15,715 sq ft)
Address
10, Ring Road, khmalaPIN 440022
Designated bank account
Uco Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.63543, 73.81250
The Address is at latitude 18.63543, longitude 73.81250.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2018

The latest completion date on record passed 8 years and 7 months ago.

Registered
7 Sep 2017
Promised
31 Mar 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000127717 Sep 201731 Mar 2018—Magniton InfraProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
The Address916

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

2 BHK 3 BHK 4 BHK · 16 units
TypeCarpet areaUnits
2 BHK 3 BHK 4 BHK876 sq m · 9,429 sq ft16

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000010

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

The Address

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyShall be provided by NMC0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Shall be provided by NMC0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterShall be provided by NMC0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingshall be done as per commencement certificate0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire escape staircase constructed50%
  • Electrical meter room, sub-station, receiving stationshall be done as per commencement certificate0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWall compound to be constructed90%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 24 filings listed on MahaRERA's project page

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Allotment letter

Titles

Form 5

Registration certificate

Other

Layout plan

Building plans

Document library

  • Details of encumbrancesEncumbrance.pdf · uploaded 2 Aug 2017View
  • Declaration in FORM Bdeclaration final.pdf · uploaded 2 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects cerificate-min.pdf · uploaded 2 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng Certificate final.pdf · uploaded 2 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate-min.pdf · uploaded 2 Aug 2017View
  • Proforma of Allotment letteragreement format.pdf · uploaded 2 Aug 2017View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 2 Aug 2017Source
  • Building Plan Approval (IOD)BUILDING PLAN 1.pdf · uploaded 4 Aug 2017View
  • Building Plan Approval (IOD)BUILDING PLAN 2.pdf · uploaded 4 Aug 2017View
  • OtherNew Doc 2017-08-04 (1)_1.pdf · uploaded 4 Aug 2017Source
  • Certificates of CA (Form 5)CA certificate.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportlegal-min.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportlegal 1-min.pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 16 Aug 2017View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 21 Jan 2021Source
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 21 Jan 2021Source

Promoter documents

  • Declaration Form Bdeclaration final.pdf · uploaded 2 Aug 2017View
  • Legal Title reportlegal-min.pdf · uploaded 16 Aug 2017View
  • Legal Title reportlegal 1-min.pdf · uploaded 16 Aug 2017View

Technical documents

  • Building Plan ApprovalBUILDING PLAN 1.pdfView
  • Building Plan ApprovalBUILDING PLAN 2.pdfView
  • Layout Approvallayout plan.pdfView

Other legal documents

  • OtherNew Doc 2017-08-04 (1)_1.pdfSource

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

10

As published on MahaRERA's project page

10

Boundaries

North
Plot
South
Road
East
Road
West
Plot

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectZade—
EngineerNikhil Gangamwar—
OtherShri Vindhevasini Constructions—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology