Skip to content

Techops Infrastructure Pvt Ltd

Active

Nagpur (M Corp.), Nagpur 440023 |Promoter: Techops Infrastructure Pvt. Ltd.

Residential / Group HousingRERAP50500008242
18 Aug 2017Registered with MahaRERA
30 Dec 2026Promised completion
29Buildings
626Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
29
Unit types
Bungalow, Residential, 2BHK626 units in all
Land area for this project
38,474 sq m (4,14,133 sq ft)
Permissible built-up area
42,322 sq m (4,55,547 sq ft)
Sanctioned built-up area
42,322 sq m (4,55,547 sq ft)
Recreational open space
4,750 sq m (51,133 sq ft)
Planning authority
Nagpur Improvement Trust
Address
6/1 6/2 6/3 6/4, Gonhi (Sim), Umred RoadPIN 440023
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.11662, 72.93742
Techops Infrastructure Pvt Ltd is at latitude 19.11662, longitude 72.93742.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2026

Registered
18 Aug 2017
Promised
30 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000824218 Aug 201730 Dec 2026—Techops Infrastructure Pvt. Ltd.Project page

29 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Block A2104
Block B214
Block C28
Block D224
Building A——
Building B——
Building C——
Building D——
Show all 29 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
Building F——
Building G——
Building J——
Building K——
Building L——
Building M——
Building N——
Building (P50500008242)——
Wing A856
Wing B852
Wing C748
Wing D748
Wing E748
Wing F748
Wing G748
Wing I7—
Wing J856
Wing K618
Wing L618
Wing M618
Wing N618

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

626 units registered

Bungalow · 136 unitsResidential · 386 units2BHK · 104 units
BuildingTypeCarpet areaUnits
Block ABungalow9,774.96 sq m · 1,05,217 sq ft104
Block BResidential1,028.04 sq m · 11,066 sq ft14
Block CBungalow417.53 sq m · 4,494 sq ft8
Block DBungalow1,252.56 sq m · 13,482 sq ft24
Wing A2BHK2,768.64 sq m · 29,801 sq ft56
Wing BResidential2,553.79 sq m · 27,489 sq ft52
Wing C2BHK1,744.84 sq m · 18,781 sq ft48
Wing DResidential1,824.67 sq m · 19,641 sq ft48
Show all 16 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnits
Wing EResidential1,824.67 sq m · 19,641 sq ft48
Wing FResidential1,789.1 sq m · 19,258 sq ft48
Wing GResidential1,790.35 sq m · 19,271 sq ft48
Wing JResidential2,768.64 sq m · 29,801 sq ft56
Wing KResidential1,098.93 sq m · 11,829 sq ft18
Wing LResidential1,098.94 sq m · 11,829 sq ft18
Wing MResidential1,098.94 sq m · 11,829 sq ft18
Wing NResidential1,234.65 sq m · 13,290 sq ft18

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Block AClosed/Covered00000
Block AOpen Space00001
Block BClosed/Covered00000
Block BOpen Space00001
Block CClosed/Covered00000
Block COpen Space00001
Block DClosed/Covered00000
Block DOpen Space00001
Show all 34 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered00001
Wing AOpen Space00001
Wing BClosed/Covered00001
Wing BOpen Space00001
Wing CClosed/Covered00001
Wing COpen Space00001
Wing DClosed/Covered00001
Wing DOpen Space00001
Wing EClosed/Covered00001
Wing EOpen Space00001
Wing FClosed/Covered00001
Wing FOpen Space00001
Wing GClosed/Covered00001
Wing GOpen Space00001
Wing IClosed/Covered00001
Wing IOpen Space00001
Wing JClosed/Covered00001
Wing JOpen Space00001
Wing KClosed/Covered00001
Wing KOpen Space00001
Wing LClosed/Covered00001
Wing LOpen Space00001
Wing MClosed/Covered00001
Wing MOpen Space00001
Wing NClosed/Covered00001
Wing NOpen Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Block A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Block B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Block C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 18 buildings and common areasShow fewer buildings and common areas

Block D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing D

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing E

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing F

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing G

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing I

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing J

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing K

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing L

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing M

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing N

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAS PER SANTION PLAN100%
  • Water SupplyAS PER SANTION PLAN100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANTION PLAN100%
  • Storm Water DrainsAS PER SANTION PLAN100%
  • Landscaping & Tree PlantingAS PER SANTION PLAN100%
  • Street LightingAS PER SANTION PLAN100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsAS PER SANTION PLAN100%
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANTION PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER SANTION PLAN100%
  • Electrical meter room, sub-station, receiving stationAS PER SANTIONED BY MSEB100%
  • Aggregate area of recreational Open SpaceAS PER SANTION PLAN100%
  • Open ParkingAS PER SANTION PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

55 documents held by Deedo, 123 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

Form B

Form 2 (12)

Show all 178 documentsShow fewer documents

Form 2 (12)

Form 1 (9)

Commencement certificate (4)

Form 5 (7)

Form 2A (4)

Registration certificate

Other (11)

Layout plan

Building plan

Allotment letter

Document library

  • Declaration in FORM Bform b affidavit.pdf · uploaded 29 Jul 2017View
  • Copy of the legal title reportlegal title report.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)commecement certificate.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterBinder1.pdf · uploaded 29 Jul 2017View
  • Details of encumbrances08 1.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)SITE_PLAN.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement_certificate (TECHOPS).pdf · uploaded 28 Mar 2018View
  • Commencement Certificates / NA Order for plotted developmentcommencement_certificate (TECHOPS).pdf · uploaded 28 Mar 2018View
  • Commencement Certificates / NA Order for plotted developmentcommencement_certificate (TECHOPS).pdf · uploaded 28 Mar 2018View
  • Certificates of CA (Form 5)Techops pvt ltd-Form 5 PDF.pdf · uploaded 15 Oct 2018View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM NO 5.pdf · uploaded 5 Nov 2019View
  • Certificates of CA (Form 5)FORM NO 5.pdf · uploaded 5 Nov 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)garden engineer certificate.pdf · uploaded 21 Feb 2020View
  • Details of encumbrancesBuldana bank loan NEW.pdf · uploaded 8 Oct 2020View
  • OtherTIPL DECLARATION.pdf · uploaded 18 May 2021View
  • Commencement Certificates / NA Order for plotted developmentTAX RECEIPT.pdf · uploaded 16 Aug 2021View
  • Declaration about Commencement CertificateRERA-FORM-4-ARCHITECT'S CERTIFICATE (COMPLETION CERTIFICATE ISSUED ON 23-12-19)(1).pdf · uploaded 12 Oct 2021View
  • Declaration about Commencement CertificateCOMMENCEMENT CERTIFICATE (2)-NEW.pdf · uploaded 12 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM-5- 2019-20.pdf · uploaded 25 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM-5-2020-2021.pdf · uploaded 25 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5-21-22.pdf · uploaded 25 May 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsFORM -3-MAY-2023_11zon.pdf · uploaded 25 May 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH CER DEC 24 MERGED.pdf · uploaded 12 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Cert dec 24.pdf · uploaded 12 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate jun 22_compressed.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate DEC 22_compressed.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate SEP 22_compressed.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate MAR 23.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate SEP 23.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate JUN 23.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate MAR 24.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate DEC 23.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate SEP 24.pdf · uploaded 22 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate JUN 24.pdf · uploaded 22 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A MAR 22.pdf · uploaded 22 Feb 2025View
  • Disclosure of sold/ booked inventoryBOOKED INVENTORY AS ON DEC 24.pdf · uploaded 22 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A MAR 23.pdf · uploaded 22 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A MAR 24.pdf · uploaded 22 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf · uploaded 22 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 22-23.pdf · uploaded 24 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 23-24.pdf · uploaded 24 Feb 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate JUN 22.pdf · uploaded 31 Mar 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate SEP 22.pdf · uploaded 31 Mar 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate DEC 22.pdf · uploaded 31 Mar 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate MAR 23.pdf · uploaded 31 Mar 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate JUN 23.pdf · uploaded 31 Mar 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate SEP 23.pdf · uploaded 31 Mar 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate DEC 23.pdf · uploaded 31 Mar 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate MAR 24.pdf · uploaded 31 Mar 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate JUN 24.pdf · uploaded 31 Mar 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate SEP 24.pdf · uploaded 31 Mar 2025View
  • Form 1TECHOPS GARDEN ARCH CER MAR 25.pdf · uploaded 18 Jul 2025Source
  • Form 2ENG CER 31 MAR 25.pdf · uploaded 18 Jul 2025Source
  • Disclosure of Sold and Booked InventoryTECHOPS GARDEN SOLD UNSOLD 31 MAR 25.pdf · uploaded 18 Jul 2025Source
  • Form 1ARCH CERT TECHOPS GARDEN JUN 25.pdf · uploaded 14 Aug 2025Source
  • Form 2ENG CERT GARDEN JUN 25.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryGARDEN BOOKED SOLD 30 june 25.pdf · uploaded 14 Aug 2025Source
  • Form 5 (FY 2022-2023)22-23.pdf · uploaded 25 Sep 2025Source
  • Form 5 (FY 2023-2024)23-24.pdf · uploaded 25 Sep 2025Source
  • Form 5 (FY 2024-2025)24-25.pdf · uploaded 25 Sep 2025Source
  • Form 1arch cer sep25.pdf · uploaded 19 Nov 2025Source
  • Form 2ENG CER TECHOPS GARDEN SEP 25.pdf · uploaded 19 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD TECHOPS GARDEN SEP 25.pdf · uploaded 19 Nov 2025Source
  • Form 1Architect Certificate JUN 22.pdf · uploaded 20 Nov 2025Source
  • Form 2Engineers Certificate jun 22_compressed.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV JUNE 22.pdf · uploaded 20 Nov 2025Source
  • Form 1Architect Certificate SEP 22.pdf · uploaded 20 Nov 2025Source
  • Form 2Engineers Certificate SEP 22_compressed.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV SEPT 22.pdf · uploaded 20 Nov 2025Source
  • Form 1Architect Certificate DEC 22.pdf · uploaded 20 Nov 2025Source
  • Form 2Engineers Certificate DEC 22_compressed.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV DEC 22.pdf · uploaded 20 Nov 2025Source
  • Form 1Architect Certificate MAR 23.pdf · uploaded 20 Nov 2025Source
  • Form 2Engineers Certificate MAR 23.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV MAR 23.pdf · uploaded 20 Nov 2025View
  • Form 1Architect Certificate JUN 23.pdf · uploaded 20 Nov 2025View
  • Form 2Engineers Certificate JUN 23.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV JUN 23.pdf · uploaded 20 Nov 2025View
  • Form 1Architect Certificate SEP 23.pdf · uploaded 20 Nov 2025View
  • Form 2Architect Certificate SEP 23.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV SEPT 23.pdf · uploaded 20 Nov 2025View
  • Form 1Architect Certificate DEC 23.pdf · uploaded 20 Nov 2025View
  • Form 2Engineers Certificate DEC 23.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV DEC 23.pdf · uploaded 20 Nov 2025View
  • Form 1Architect Certificate MAR 24.pdf · uploaded 20 Nov 2025View
  • Form 2Engineers Certificate MAR 24.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV MAR 24.pdf · uploaded 20 Nov 2025View
  • Form 1Architect Certificate JUN 24.pdf · uploaded 20 Nov 2025View
  • Form 2Engineers Certificate JUN 24.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV JUNE 24.pdf · uploaded 20 Nov 2025View
  • Form 1Architect Certificate SEP 24.pdf · uploaded 20 Nov 2025View
  • Form 2Engineers Certificate SEP 24.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryBOOK SOLD INV SEPT 24.pdf · uploaded 20 Nov 2025View
  • Form 1ARCH CER DEC 24.pdf · uploaded 20 Nov 2025View
  • Form 2ENGINEER CER DEC 24.pdf · uploaded 20 Nov 2025View
  • Disclosure of Sold and Booked InventoryDiscolsure of sold 1_0001.pdf · uploaded 20 Nov 2025Source
  • Form 1arc cert dec 25 garden.pdf · uploaded 4 Feb 2026Source
  • Form 2Engineer Certificate Dec 25 techops GARDEN.pdf · uploaded 4 Feb 2026Source
  • Disclosure of Sold and Booked InventoryGARDEN SOLD UNSOLD DEC 25.pdf · uploaded 4 Feb 2026Source
  • Form 1arch cert mar 26 garden.pdf · uploaded 11 May 2026Source
  • Form 2ENGINEER CERTIFICATE MAR 26 garden.pdf · uploaded 11 May 2026Source
  • Disclosure of Sold and Booked Inventorygarden sold unsold mar 26.pdf · uploaded 11 May 2026Source
  • Form 2A (FY 2017-2018)FORM 2A MAR 19.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2018-2019)FORM 2A MAR 19.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2019-2020)FORM 2A MAR 20.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2020-2021)FORM 2A MAR 21.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2021-2022)FORM 2A MAR 22.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2022-2023)FORM 2A MAR 23.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2023-2024)FORM 2A MAR 24.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2024-2025)FORM 2A MAR 25.pdf · uploaded 11 Jun 2026Source
  • Form 2A (FY 2025-2026)FORM 2A MAR 26.pdf · uploaded 11 Jun 2026Source
  • Form 1ARCH CER TECHOPS GARDEN JUNE 26.pdf · uploaded 6 Aug 2026Source
  • Form 2ENGINEER CER TECHOPS GARDEN JUNE 26.pdf · uploaded 6 Aug 2026Source
  • Disclosure of Sold and Booked InventoryBOOKED SOLD JUNE 26.pdf · uploaded 6 Aug 2026Source
  • Form 5 (FY 2025-2026)25-26.pdf · uploaded 26 Aug 2026Source

Promoter documents

  • Declaration Form Bform b affidavit.pdf · uploaded 29 Jul 2017View
  • Legal Title reportlegal title report.pdf · uploaded 29 Jul 2017View

Technical documents

  • Layout ApprovalSITE_PLAN.pdfView
  • Building Plan Approvalcommecement certificate.pdfView

Other legal documents

  • OtherTIPL DECLARATION.pdfView

Proforma allotment letter

  • Proforma allotment letterBinder1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

6/1 6/2 6/3 6/4

As published on MahaRERA's project page

6/1 6/2 6/3 6/4

Boundaries

North
Kh 7-3 7-5 7-6
South
Narsala Road
East
Kh 7
West
Narsala Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAvinash Hazare—
ArchitectVistaar—
Chartered accountantAs Divecha And Associates—
Chartered accountantA.S. Divecha & Associates—
Chartered accountantSameer Divecha—
Chartered accountantS N Divecha And Associates—
EngineerAvinash Hajare—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology