Certificate SignedNagpur (M Corp.), Nagpur 440015 |Promoter: Design Developers Pvt Ltd
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK20 units in all
- Address
- 1, 2, 3, 31, New Manish Nagar Cement Road, Samarat Navshakti Janvikas SansthaPIN 440015
- Designated bank account
- 154
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Mar 2028
- Registered
- 15 Jun 2022
- Promised
- 31 Mar 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500045906 | 15 Jun 2022 | 31 Mar 2028 | 31 Mar 2028 | Design Developers Pvt Ltd | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Signature Height | 7 | 20 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
20 of 20 units booked (100%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 59 sq m · 635 sq ft | 6 | 6 |
| 2BHK | 63 sq m · 678 sq ft | 14 | 14 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
65 documents held by Deedo, 151 filings listed on MahaRERA's project page
Show all 216 documentsShow fewer documents
Other (18)
Commencement certificate (2)
Form 1 (20)
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
- Form 1Date not statedView
Title report
- Title reportDate not statedView
Encumbrance details
- Encumbrance detailsDate not statedView
Layout plan (9)
Building plan
- Building planDate not statedView
Form B
- Form BDate not statedView
Form 2 (11)
Legal
Migrated
- 1 PAN CardDesign Developers PAN card-compressed (1).pdf · uploaded 20 May 2022View
- 2 PAN CardElvis PAN Card (1)-compressed.pdf · uploaded 20 May 2022View
- 3 PAN CardJOLLY KHAN PAN CARD.pdf · uploaded 20 May 2022View
- 1 Copy of the legal title reportSignature Height- Adv Makrand Pathak - Search report_compressed.pdf · uploaded 20 May 2022View
- 1 Details of encumbrancesIMG-1615.pdf · uploaded 21 May 2022View
- 1 Copy of Layout Approval (in case of layout)map manish nagar_compressed_compressed.pdf · uploaded 21 May 2022View
- 1 Building Plan Approval / NA Order for plotted developmentmap manish nagar_compressed_compressed.pdf · uploaded 21 May 2022View
- 1 Commencement Certificates / NA Order for plotted developmentIMG-1617.pdf · uploaded 21 May 2022View
- 1 Declaration about Commencement CertificateIMG-1616.pdf · uploaded 21 May 2022View
- 1 Declaration in FORM BDesign Signature height Affidavit.pdf · uploaded 21 May 2022View
- 1 CERSAI detailsIMG-1620.pdf · uploaded 21 May 2022View
- 1 Proforma of Allotment letterIMG-1619.pdf · uploaded 21 May 2022View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Design Signature Form 3, CA Manish Ojha_compressed.pdf · uploaded 23 May 2022View
- 2 Building Plan Approval / NA Order for plotted developmentSignature Height - Sanction Letter and sanction Map page 6.pdf · uploaded 3 Jun 2022View
- 2 Proforma of Allotment letterFormate for Agreement (1).pdf · uploaded 4 Jun 2022View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Design - Signature Height - MahaRera Form 3_compressed_compressed_compressed_compressed.pdf · uploaded 7 Jun 2022View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_June-22.pdf · uploaded 2 May 2024View
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_Sep-22.pdf · uploaded 2 May 2024View
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_Dec-22.pdf · uploaded 2 May 2024View
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_Mar-23.pdf · uploaded 2 May 2024View
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_June-23.pdf · uploaded 2 May 2024View
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_Sep-23.pdf · uploaded 2 May 2024View
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_Dec-23.pdf · uploaded 2 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature height June 2022.pdf · uploaded 14 May 2024View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height Sep 2022.pdf · uploaded 14 May 2024View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height Dec 2022.pdf · uploaded 14 May 2024View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height March 2023.pdf · uploaded 14 May 2024View
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height June 2023.pdf · uploaded 14 May 2024View
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height Sep 2023.pdf · uploaded 14 May 2024View
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height Dec 2023.pdf · uploaded 14 May 2024View
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Signature Height March 2024.pdf · uploaded 14 May 2024View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SIGNATURE HEIGHT_FORM 1_Sept-24.pdf · uploaded 28 Apr 2025View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SIGNATURE HEIGHT_FORM 1_Dec-24.pdf · uploaded 28 Apr 2025View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SIGNATURE HEIGHT_FORM 1_Mar-25.pdf · uploaded 28 Apr 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SIGNATURE HEIGHT_FORM 1_June-24.pdf · uploaded 28 Apr 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_FORM 3_MARCH-24.pdf · uploaded 28 Apr 2025View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_FORM 3_JUNE-24.pdf · uploaded 28 Apr 2025View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_FORM 3_SEPT-24.pdf · uploaded 28 Apr 2025View
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_FORM 3_DEC-24.pdf · uploaded 28 Apr 2025View
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)SIGNATURE HEIGHT_FORM 3_MAR-25.pdf · uploaded 28 Apr 2025View
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_June-24.pdf · uploaded 28 Apr 2025View
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Mar-25.pdf · uploaded 28 Apr 2025View
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Dec-24.pdf · uploaded 28 Apr 2025View
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Sept-24.pdf · uploaded 28 Apr 2025View
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Mar-24.pdf · uploaded 28 Apr 2025View
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Dec-23.pdf · uploaded 28 Apr 2025View
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_June-23.pdf · uploaded 28 Apr 2025View
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Mar-23.pdf · uploaded 28 Apr 2025View
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Dec-22.pdf · uploaded 28 Apr 2025View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Sept-22.pdf · uploaded 28 Apr 2025View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_JUNE-22.pdf · uploaded 28 Apr 2025View
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)SIGNATURE HEIGHT_FORM 2_Sept-23.pdf · uploaded 28 Apr 2025View
- 5 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 12 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 11 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 10 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 9 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 8 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 7 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 6 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 4 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025View
- 3 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025Source
- 2 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025Source
- 1 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 28 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SIGNATURE HEIGHT_FORM 2A_MAR-23.pdf · uploaded 28 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SIGNATURE HEIGHT_FORM 2A_MAR-24.pdf · uploaded 28 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 signature heights_March-2025.pdf · uploaded 30 Apr 2025Source
- Form 1FORM-1.pdf · uploaded 14 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 14 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 14 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 14 Jun 2025Source
- Withdrawal Update Form 1FORM-1.pdf · uploaded 14 Jun 2025Source
- Withdrawal Update Form 2FORM-2.pdf · uploaded 14 Jun 2025Source
- Withdrawal Update Form 3FORM-3.pdf · uploaded 14 Jun 2025Source
- Form 5 (FY 2022-2023)FORM-5-23.pdf · uploaded 14 Jun 2025Source
- Form 5 (FY 2023-2024)FORM-5-24.pdf · uploaded 14 Jun 2025Source
- Form 5 (FY 2024-2025)Form 5.pdf · uploaded 14 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 1FORM-1.pdf · uploaded 15 Jun 2025Source
- Form 2FORM-2.pdf · uploaded 15 Jun 2025Source
- Form 3FORM-3.pdf · uploaded 15 Jun 2025Source
- Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 15 Jun 2025Source
- Form 2A (FY 2024-2025)FORM-2A_SIGNATURE HEIGHTS.pdf · uploaded 17 Jun 2025Source
- Withdrawal Update Form 1FORM 1 JUN-25.pdf · uploaded 19 Aug 2025Source
- Withdrawal Update Form 2FORM 2 JUN-25.pdf · uploaded 19 Aug 2025Source
- Withdrawal Update Form 3FORM 3 JUN-25.pdf · uploaded 19 Aug 2025Source
- Occupational CertificateOC Signature Height_compressed.pdf · uploaded 28 Aug 2025Source
Technical
- Documentmap manish nagar_compressed_compressed.pdf · uploaded 21 May 2022View
- Documentmap manish nagar_compressed_compressed.pdf · uploaded 21 May 2022View
- DocumentSignature Height - Sanction Letter and sanction Map page 6.pdf · uploaded 3 Jun 2022View
- DocumentPLAN 2.pdf · uploaded 28 Aug 2025Source
- DocumentPLAN 1.pdf · uploaded 28 Aug 2025Source
- DocumentPLAN 2.pdf · uploaded 28 Aug 2025Source
Technical (Architect)
- DocumentSIGNATURE HEIGHT_FORM 1_June-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 1_Sept-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 1_Dec-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 1_Mar-25.pdf · uploaded 28 Apr 2025View
- DocumentFORM 1 JUN-25.pdf · uploaded 19 Aug 2025Source
Technical (Engineer)
- DocumentSIGNATURE HEIGHT_FORM 2_Sept-22.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Dec-22.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Mar-23.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_June-23.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Sept-23.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Dec-23.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Mar-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_June-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Sept-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Dec-24.pdf · uploaded 28 Apr 2025View
- DocumentSIGNATURE HEIGHT_FORM 2_Mar-25.pdf · uploaded 28 Apr 2025View
- DocumentFORM 2 JUN-25.pdf · uploaded 19 Aug 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nagpur (M Corp.), Nagpur (Urban) taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Compound Wall
- South
- Road
- East
- Open Space
- West
- Compound Wall
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Arch Anjali Kadam | — |
| Chartered accountant | Ca Manish Ojha | — |
| Engineer | Engg Dhawal Harshe | — |
Source: MahaRERA project page. Contact details are not shown.