Shri Ekdant Enclave

Completed

Nagpur (M Corp.), Nagpur 440030 |Promoter: Moreshwar Narayanrao Bhagat

Residential / Group HousingRERAP50500013928
2 Nov 2017Registered with MahaRERA
31 Dec 2019Promised completion
30 Dec 2020Revised completionPushed back 1 year
1Building
24Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential24 units in all
Land area for this project
912 sq m (9,814 sq ft)
Permissible built-up area
1,885 sq m (20,290 sq ft)
Sanctioned built-up area
1,885 sq m (20,290 sq ft)
Recreational open space
912 sq m (9,814 sq ft)
Address
1 .2.3 /468/135 -Pa Rt/1.2.3 Block- PPIN 440030
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.45592, 73.32960
Shri Ekdant Enclave is at latitude 19.45592, longitude 73.32960.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 5 years and 10 months ago.

Registered
2 Nov 2017
Promised
31 Dec 2019
Revised
30 Dec 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000139282 Nov 201731 Dec 201930 Dec 2020Moreshwar Narayanrao BhagatProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shri Ekdant Enclave824

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

24 units registered

Residential · 24 units
TypeCarpet areaUnits
Residential1,107.06 sq m · 11,916 sq ft24

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000014

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shri Ekdant Enclave

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply0100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements0100%
  • Electrical meter room, sub-station, receiving station0100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking0100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

2 documents held by Deedo, 28 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Document library

  • Proforma of Allotment letterSONAL RERA AGREEMENT-PRANAV.pdf · uploaded 10 Oct 2017Source
  • Otheradhar card .pdf · uploaded 10 Oct 2017Source
  • Details of encumbrancesNO ENCUMBRANCE.pdf · uploaded 10 Oct 2017Source
  • Copy of the legal title reporttitle search.pdf · uploaded 10 Oct 2017Source
  • Declaration in FORM BDECLARATION FORM B.pdf · uploaded 11 Oct 2017Source
  • Proforma of Allotment letterALLOTMENT.pdf · uploaded 11 Oct 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERT.pdf · uploaded 11 Oct 2017Source
  • OtherExp5yr.pdf · uploaded 11 Oct 2017Source
  • OtherSanction_plan_To_be_implemented_in_Future.pdf · uploaded 11 Oct 2017Source
  • Commencement Certificates / NA Order for plotted developmentsaction1.pdf · uploaded 11 Oct 2017Source
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 11 Oct 2017Source
  • Building Plan Approval (IOD)sanction PLAN 1 Commencement certificate.pdf · uploaded 11 Oct 2017Source
  • Building Plan Approval (IOD)sanction plan2.pdf · uploaded 11 Oct 2017Source
  • Certificates of CA (Form 5)Emaarat Creater -ilovepdf-compressed.pdf · uploaded 13 Oct 2018Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy ekdant (1).pdf · uploaded 4 Oct 2019Source
  • Architect’s Certificate on Completion of Project (Form 4)1577096098259_RERA.pdf · uploaded 23 Dec 2019Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE.pdf · uploaded 6 Mar 2020Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC DOCUMENTS.pdf · uploaded 6 Mar 2020Source
  • Status of Formation of Legal Entity (Society/Co Op etc.)ekdant society.pdf · uploaded 26 Dec 2021Source

Promoter documents

  • Legal Title reporttitle search.pdf · uploaded 10 Oct 2017Source
  • Declaration Form BDECLARATION FORM B.pdf · uploaded 11 Oct 2017Source

Technical documents

  • Layout ApprovalLAYOUT.pdfSource
  • Building Plan Approvalsanction PLAN 1 Commencement certificate.pdfSource
  • Building Plan Approvalsanction plan2.pdfSource

Other legal documents

  • Otheradhar card .pdfSource
  • OtherExp5yr.pdfSource
  • OtherSanction_plan_To_be_implemented_in_Future.pdfSource

Proforma allotment letter

  • Proforma allotment letterSONAL RERA AGREEMENT-PRANAV.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

1 .2.3 /468/135 PA RT/1.2.3 BLOCK P

As published on MahaRERA's project page

1 .2.3 /468/135 -PA RT/1.2.3 BLOCK- P

Boundaries

North
Other Layout
South
Road
East
Road
West
Layout Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNagarch—
ArchitectNagarch—
ArchitectNagarch—
ArchitectNagarch—
EngineerAshfaque Ansari—
EngineerAshfaque Ansari—
EngineerAshfaque Ansari—
EngineerAshfaque Ansari—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology