Shalwak Elite

Completed

Nagpur (M Corp.), Nagpur 440012 |Promoter: Shalwak Infrabulls

Residential / Group HousingRERAP50500010251
24 Aug 2017Registered with MahaRERA
30 Jun 2018Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential12 units in all
Land area for this project
610 sq m (6,570 sq ft)
Permissible built-up area
1,110 sq m (11,952 sq ft)
Sanctioned built-up area
1,110 sq m (11,952 sq ft)
Recreational open space
610 sq m (6,570 sq ft)
Address
Plot no.11, corporation house no.190, CTS NO.358, Sheet No.34PIN 440012
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13452, 79.08374
Shalwak Elite is at latitude 21.13452, longitude 79.08374.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2018

The latest completion date on record passed 8 years and 4 months ago.

Registered
24 Aug 2017
Promised
30 Jun 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001025124 Aug 201730 Jun 2018—Shalwak InfrabullsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shalwak Elite812

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

Residential · 12 units
TypeCarpet areaUnits
Residential91.15 sq m · 981 sq ft2
Residential101.79 sq m · 1,096 sq ft6
Residential101.83 sq m · 1,096 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000034

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shalwak Elite

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAVAILABLE50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP90%
  • Storm Water DrainsAS PER PLAN30%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWATER HARVESTING40%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsRECEIVED FIRE COMPLIENCE CERTIFICTE ON 11/07/2017100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking24 SCOOTERES + 10 CYCLES60%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

7 documents held by Deedo, 21 filings listed on MahaRERA's project page

Form 1

Form 2

Registration certificate

Others

Allotment letter

Document library

  • Copy of the legal title reportSHALWAK INFRABULLS-TITLE-RERA.pdf · uploaded 31 Jul 2017Source
  • Proforma of Allotment letterVAIDYA-SHALWAK INFRABULLS-AGREEMENT (SHALWAK ELITE)-RERA (1).pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentBUILDING PERMIT.pdf · uploaded 31 Jul 2017Source
  • Building Plan Approval (IOD)SANCTIONED PLAN.pdf · uploaded 31 Jul 2017Source
  • Declaration in FORM BForm B.pdf · uploaded 31 Jul 2017Source
  • Details of encumbrancesLoan Sanction Letter.pdf · uploaded 31 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Declaration.pdf · uploaded 31 Jul 2017Source
  • Details of encumbrancesSCANNED_NO_DU_CERTIFICATE_optimize_word (1).pdf · uploaded 14 Jul 2019Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 6 Nov 2019Source
  • Status of Conveyancepdfhanding_over.pdf · uploaded 14 Nov 2019Source
  • Disclosure of sold/ booked inventoryMaharera.pdf · uploaded 7 Jun 2021View
  • Disclosure of sold/ booked inventoryMaharera (1).pdf · uploaded 10 Jun 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Completion Certificate.pdf · uploaded 10 Jun 2021Source
  • Architect’s Certificate on Completion of Project (Form 4)Completion Certificate-converted.pdf · uploaded 3 Jul 2021Source

Promoter documents

  • Legal Title reportSHALWAK INFRABULLS-TITLE-RERA.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BForm B.pdf · uploaded 31 Jul 2017Source

Technical documents

  • Building Plan ApprovalSANCTIONED PLAN.pdfSource
  • Layout ApprovalDeclaration.pdfSource

Proforma allotment letter

  • Proforma allotment letterVAIDYA-SHALWAK INFRABULLS-AGREEMENT (SHALWAK ELITE)-RERA (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

358corporation house no.190CTS NO.358Plot no.11Sheet No.34

As published on MahaRERA's project page

Plot no.11,corporation house no.190,CTS NO.358,Sheet No.34

Boundaries

North
Cts 357
South
Cts 359
East
Road
West
Conservancy Lane

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSankalp Creations Arch Rajesh Jaiswal—
EngineerArun Uttarwar & Associates—

Source: MahaRERA project page. Contact details are not shown.