Pratiksha Nx

Completed

Nagpur (M Corp.), Nagpur 440030 |Promoter: Sharad Gandhi

Residential / Group HousingRERAP50500018217
15 Oct 2018Registered with MahaRERA
30 Dec 2022Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
530 sq m (5,708 sq ft)
Permissible built-up area
689 sq m (7,419 sq ft)
Sanctioned built-up area
689 sq m (7,419 sq ft)
Address
Plot No 8, 9, 10 Cts No.22 Kh No.18/3, Mankapur, MankapurPIN 440030
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Pratiksha Nx is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
15 Oct 2018
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001821715 Oct 201830 Dec 2022—Sharad GandhiProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pratiksha Nx6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pratiksha Nx

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor40%
  • Slabs of Super Structure35%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Internal Roads & FootpathsNot applicable
  • Water SupplyCORPORATION WATER0%
  • Water SupplyCORPORATION WATER0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN0%
  • Storm Water DrainsAS PER PLAN0%
  • Storm Water DrainsAS PER PLAN0%
  • Landscaping & Tree PlantingAS PER PLAN0%
  • Landscaping & Tree PlantingAS PER PLAN0%
  • Street LightingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalAS PER PLAN0%
  • Solid Waste Management And DisposalAS PER PLAN0%
  • Water conservation /Rain water harvestingAS PER PLAN0%
  • Water conservation /Rain water harvestingAS PER PLAN0%
  • Energy managemcntAS PER PLAN0%
  • Energy managemcntAS PER PLAN0%
  • Fire protection and fire safety requirementsAS PER PLAN0%
  • Fire protection and fire safety requirementsAS PER PLAN0%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

2 documents held by Deedo, 20 filings listed on MahaRERA's project page

Registration certificate

Other

Document library

  • Commencement Certificates / NA Order for plotted developmentBuilding permit.pdf · uploaded 4 Oct 2018Source
  • Details of encumbrancesEncum Cert.pdf · uploaded 4 Oct 2018Source
  • Declaration in FORM BForm B.pdf · uploaded 4 Oct 2018Source
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 4 Oct 2018Source
  • Copy of the legal title reportLegal Report.pdf · uploaded 4 Oct 2018Source
  • Copy of Layout Approval (in case of layout)lAYOUT PLAN.pdf · uploaded 12 Oct 2018Source
  • Building Plan Approval (IOD)BULDING PLANS.pdf · uploaded 12 Oct 2018Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate-By NIT.pdf · uploaded 26 Jun 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate-By Engineer.pdf · uploaded 26 Jun 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate By Architect.pdf · uploaded 26 Jun 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentNo due Cum Release Letter.pdf · uploaded 26 Jun 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentAccount Closure and No Due.pdf · uploaded 26 Jun 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFORM 4 18-11-24.pdf · uploaded 28 Nov 2024Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentReply to Query.pdf · uploaded 28 Nov 2024Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm 4-14-06-21.pdf · uploaded 28 Nov 2024Source

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 4 Oct 2018Source
  • Legal Title reportLegal Report.pdf · uploaded 4 Oct 2018Source

Technical documents

  • Building Plan ApprovalBULDING PLANS.pdfSource
  • Layout ApprovallAYOUT PLAN.pdfSource

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

1010 CTS NO.22 KH NO.18/3899PLOT NO 8

As published on MahaRERA's project page

PLOT NO 8,9,10 CTS NO.22 KH NO.18/3

Boundaries

North
Road
South
Other Part Of Layout
East
Plot No 11
West
Plot No 7

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectEmanate Design—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology