Nagpur (M Corp.), Nagpur 440030 |Promoter: Rupali Pramod Gharde

Residential / Group HousingRERAP50500021582
9 Jul 2019Registered with MahaRERA
30 Jun 2021Promised completion
1Building
32Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
2 BHK32 units in all
Land area for this project
1,136 sq m (12,224 sq ft)
Permissible built-up area
1,760 sq m (18,947 sq ft)
Sanctioned built-up area
1,608 sq m (17,312 sq ft)
Address
Plot No.10 Cts No.53 Kh 36/1 No., Zingabai Takli, Zingabai TakliPIN 440030
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Prabha City Lotus-2 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2021

The latest completion date on record passed 5 years and 4 months ago.

Registered
9 Jul 2019
Promised
30 Jun 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000215829 Jul 201930 Jun 2021—Rupali Pramod GhardeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Prabha City Lotus-2632

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

32 units registered

2 BHK · 32 units
TypeCarpet areaUnits
2 BHK44.3 sq m · 477 sq ft4
2 BHK44.37 sq m · 478 sq ft4
2 BHK44.4 sq m · 478 sq ft8
2 BHK44.45 sq m · 478 sq ft4
2 BHK45.71 sq m · 492 sq ft4
2 BHK46.36 sq m · 499 sq ft4
2 BHK46.81 sq m · 504 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Prabha City Lotus-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNMC/ BOREWELL WATER100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)YES100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER PLAN100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRIC PANEL BOARD SHALL BE ONLY PROVIDED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 31 filings listed on MahaRERA's project page

Encumbrance

Form b

Registration certificate

Form 2

Form 2as

Form 5s

Others

Layout plans

Building plans

Document library

  • Declaration in FORM BfORM b.pdf · uploaded 23 Jun 2019View
  • Details of encumbranceseNCUMBERNACE.pdf · uploaded 23 Jun 2019View
  • Proforma of Allotment letterALLOTMENT.pdf · uploaded 23 Jun 2019Source
  • Copy of the legal title reportLEGAL TITEL.pdf · uploaded 23 Jun 2019Source
  • Building Plan Approval (IOD)COMMENCEMENT_compressed.pdf · uploaded 23 Jun 2019View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT_compressed.pdf · uploaded 23 Jun 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 23 Jun 2019View
  • Copy of Layout Approval (in case of layout)layout plan- RL.pdf · uploaded 3 Jul 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 8 Jul 2019View
  • Building Plan Approval (IOD)BUILDING PERMIT-compressed.pdf · uploaded 8 Jul 2019View
  • Building Plan Approval (IOD)IOD-compressed.pdf · uploaded 8 Jul 2019View
  • Proforma of Allotment letterAgreement Letter.pdf · uploaded 8 Jul 2019Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORKM 2A MAR 20_compressed.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A MAR 21_compressed.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A JUNE 21_compressed.pdf · uploaded 15 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2A JUNE 21_compressed.pdf · uploaded 15 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Lotus 2_March 21.pdf · uploaded 15 Aug 2021View
  • CERSAI detailsCERSAI_Search_Report_200238080789_For_Asset_Based_Search_25_05_2022_00_24_33_233.pdf · uploaded 25 May 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Prabha City Lotus-2_Form-5_Mar-20.pdf · uploaded 21 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPRABHA CITY LOTUS-2.pdf · uploaded 24 Apr 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)1 Annual Audit Report of Statutory CA (Form 5).pdf · uploaded 24 Apr 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM-5_PRABHA CITY LOTUS-2_MAR-22.pdf · uploaded 25 Apr 2023Source

Promoter documents

  • Declaration Form BfORM b.pdf · uploaded 23 Jun 2019View
  • Legal Title reportLEGAL TITEL.pdf · uploaded 23 Jun 2019Source

Technical documents

  • Building Plan ApprovalBUILDING PERMIT-compressed.pdfView
  • Layout ApprovalLAYOUT PLAN.pdfView
  • Building Plan ApprovalIOD-compressed.pdfView
  • Layout Approvallayout plan- RL.pdfView
  • Building Plan ApprovalCOMMENCEMENT_compressed.pdfView
  • Layout ApprovalLAYOUT.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

10PLOT NO.10 CTS NO.53 KH 36/1 NO

As published on MahaRERA's project page

PLOT NO.10 CTS NO.53 KH 36/1 NO.

Boundaries

North
Other Layout
South
Road
East
Plot No 11
West
Plot No 9

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.