Parijat

Completed

Nagpur (M Corp.), Nagpur 440034 |Promoter: M/s Shri Sadguru Developers

Residential / Group HousingRERAP50500018590
21 Nov 2018Registered with MahaRERA
28 May 2021Promised completion
30 Oct 2022Revised completionPushed back 1 year and 5 months
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential16 units in all
Land area for this project
491 sq m (5,288 sq ft)
Permissible built-up area
491 sq m (5,288 sq ft)
Sanctioned built-up area
491 sq m (5,288 sq ft)
Address
14, 15, 16, 17, New Narsala Road, NarsalaPIN 440034
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.09041, 79.13490
Parijat is at latitude 21.09041, longitude 79.13490.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year and 5 months

The latest completion date on record passed 4 years ago.

Registered
21 Nov 2018
Promised
28 May 2021
Revised
30 Oct 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001859021 Nov 201828 May 202130 Oct 2022M/s Shri Sadguru DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Parijat616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

Residential · 16 units
TypeCarpet areaUnits
Residential680.48 sq m · 7,325 sq ft16

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000015

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Parijat

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBore-well100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Yet to be done100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAfter Completion100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted after completion of site development100%
  • Passenger LiftTo be installed after project completion100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

4 documents held by Deedo, 20 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

Layout plan

Document library

  • Details of encumbrancessadguru no encumbrance.pdf · uploaded 6 Nov 2018Source
  • Declaration in FORM Bbodhankar (affidavit cum declaration).pdf · uploaded 6 Nov 2018Source
  • Proforma of Allotment letterAGREEMENT-RERA-SHRI SADGURU DEVELOPERS-MOUZA - NARSALA.pdf · uploaded 6 Nov 2018Source
  • Commencement Certificates / NA Order for plotted developmentBuilding Permit.pdf · uploaded 6 Nov 2018Source
  • Copy of the legal title reportReport.pdf · uploaded 6 Nov 2018Source
  • Copy of Layout Approval (in case of layout)layout1.pdf · uploaded 6 Nov 2018View
  • Building Plan Approval (IOD)sanctioned plan.pdf · uploaded 6 Nov 2018Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2 A.pdf · uploaded 2 Jul 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 2 Jul 2021Source
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 2 Jul 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)18-19.pdf · uploaded 14 Jul 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)19-20.pdf · uploaded 14 Jul 2021Source
  • Disclosure of sold/ booked inventoryBooked sould Inventary.pdf · uploaded 26 Jul 2021Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Parijat.pdf · uploaded 18 Apr 2022Source
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 18 Apr 2022Source

Promoter documents

  • Declaration Form Bbodhankar (affidavit cum declaration).pdf · uploaded 6 Nov 2018Source
  • Legal Title reportReport.pdf · uploaded 6 Nov 2018Source

Technical documents

  • Building Plan Approvalsanctioned plan.pdfSource
  • Layout Approvallayout1.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT-RERA-SHRI SADGURU DEVELOPERS-MOUZA - NARSALA.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

14151617

As published on MahaRERA's project page

14,15,16,17

Boundaries

North
Road
South
Plot
East
Plot
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAdsys Architects—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology