Oak Sterling Vista

Active

Nagpur (M Corp.), Nagpur 440013 |Promoter: Oak Sterling Vista LLP

Residential / Group HousingRERAP50500055834
22 Apr 2024Registered with MahaRERA
31 Dec 2026Promised completion
4Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
4
Land area for this project
3,900 sq m (41,979 sq ft)
Permissible built-up area
9,955 sq m (1,07,149 sq ft)
Sanctioned built-up area
9,905 sq m (1,06,620 sq ft)
Planning authority
Nagpur Improvement Trust (NIT)
Address
Mouza And Khasra Zingabai Takli 248/2, Zingabai Takli, Mouza Zingabai TakliPIN 440013
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.20354, 79.06993
Oak Sterling Vista is at latitude 21.20354, longitude 79.06993.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
22 Apr 2024
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050005583422 Apr 202431 Dec 2026—Oak Sterling Vista LLPProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P50500055834)——
Wing A9—
Wing B9—
Wing C5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered733000103
Wing AOpen Space00000
Wing BClosed/Covered772600103
Wing BOpen Space00000
Wing CClosed/Covered38220060
Wing COpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)95%
  • Podiums (if any)0%
  • Plinth95%
  • Stilt Floor80%
  • Slabs of Super Structure95%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing B

  • Excavation100%
  • Basement (if any)80%
  • Podiums (if any)0%
  • Plinth95%
  • Stilt Floor80%
  • Slabs of Super Structure60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER SANCTIONED PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANCTIONED PLAN0%
  • Storm Water DrainsAS PER SANCTIONED PLAN0%
  • Landscaping & Tree PlantingAS PER SANCTIONED PLAN0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANCTIONED PLAN0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER SANCTIONED PLAN0%
  • Electrical meter room, sub-station, receiving stationAS PER SANCTIONED PLAN0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

83 documents held by Deedo, 117 filings listed on MahaRERA's project page

Commencement certificates

Title

Encumbrances

Form b

Others

Allotment letters

Form 1s

Form 2s

Form 2a

Form 5

Extension certificate

Registration certificate

Layout plan

Building plans

Document library

  • Commencement Certificates / NA Order for plotted developmentSterling Vista - Building Permit.pdf · uploaded 7 Mar 2024View
  • Copy of the legal title reportSearch Report - OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
  • a Details of encumbrances concerned to FinanceEncumbrance - Finance.pdf · uploaded 9 Mar 2024View
  • b Details of encumbrances concerned to LegalEncumbrance - Finance.pdf · uploaded 9 Mar 2024View
  • a Details of encumbrances concerned to FinanceEncumbrance - Legal.pdf · uploaded 9 Mar 2024View
  • b Details of encumbrances concerned to LegalEncumbrance - Legal.pdf · uploaded 9 Mar 2024View
  • Declaration in FORM BAffidavit - FORM B.pdf · uploaded 9 Mar 2024View
  • Deviation Report with respect to Allotment letterDeviation_Allotment letter.pdf · uploaded 9 Mar 2024View
  • Deviation Report with respect to model copy of AgreementDeviation report _ats_compressed.pdf · uploaded 9 Mar 2024View
  • Proforma of Agreement for saleATS- OAK STERLING VISTA LLP.pdf · uploaded 9 Mar 2024View
  • CERSAI detailsCersai.pdf · uploaded 9 Mar 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest - Omair.pdf · uploaded 9 Mar 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest - Mahesh.pdf · uploaded 9 Mar 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest - Rajesh.pdf · uploaded 9 Mar 2024View
  • Other – LegalDeclaration.pdf · uploaded 9 Mar 2024View
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-1-10.pdf · uploaded 9 Mar 2024View
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-11-20.pdf · uploaded 9 Mar 2024View
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-21-30.pdf · uploaded 9 Mar 2024View
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-31-40.pdf · uploaded 9 Mar 2024View
  • Other – LegalSterling Vista LLP - Sale Deed_compressed-1-10.pdf · uploaded 9 Mar 2024View
  • Other – LegalSterling Vista LLP - Sale Deed_compressed-11-20.pdf · uploaded 9 Mar 2024View
  • Other – LegalSterling Vista LLP - Sale Deed_compressed-21-38.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-1-10.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-11-20.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-21-30.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-31-40.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalSterling Vista LLP - Sale Deed_compressed-1-10.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalSterling Vista LLP - Sale Deed_compressed-11-20.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalSterling Vista LLP - Sale Deed_compressed-21-38.pdf · uploaded 9 Mar 2024View
  • Copy of Layout Approval (in case of layout)Sterling Vista Layout plan.pdf · uploaded 9 Mar 2024View
  • Proforma of Allotment letterALLOTMENT_.pdf · uploaded 9 Mar 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK_OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
  • Other – TechnicalDeclaration.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development1.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development2.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development3.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development4.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development5.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development6.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development7.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development8.pdf · uploaded 9 Mar 2024View
  • Building Plan Approval / NA Order for plotted development9.pdf · uploaded 9 Mar 2024View
  • Declaration about Commencement CertificateFORM-D_OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
  • Commencement Certificates / NA Order for plotted developmentQuality-Annexure A Royal Regency Kalidas.pdf · uploaded 3 Apr 2024View
  • Other – TechnicalQuality-Annexure A Royal Regency Kalidas.pdf · uploaded 3 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sterling Vista - Form 1 June 24 08-Jul-2024 16-35-52.pdf · uploaded 13 Jul 2024View
  • Disclosure of sold/ booked inventorySterling Vista Inventory - June 24.pdf · uploaded 20 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sterling Vista - Form 2 June 24.pdf · uploaded 20 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Sterling Vista Sep 24.pdf · uploaded 15 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sterling Vista - Form 2 Sep 24.pdf · uploaded 17 Oct 2024View
  • Disclosure of sold/ booked inventoryInventory - Sterling Vista Sep 24.pdf · uploaded 17 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 24 OAK Sterling Vista.pdf · uploaded 2 Jan 2025View
  • Disclosure of sold/ booked inventorySold Unsold of Sterling Vista_Dec-2024.pdf · uploaded 21 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sterling Vista_Dec-2024.pdf · uploaded 22 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Medsquare Form 1 - March 25.pdf · uploaded 15 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare Form 2 - March 25.pdf · uploaded 15 Apr 2025View
  • Disclosure of sold/ booked inventoryMedsquare Inventory March 25.pdf · uploaded 15 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 Apr 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Apr 2025View
  • Disclosure of sold/ booked inventorySOLD-UNSOLD.pdf · uploaded 15 Apr 2025View
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 8 Jul 2025View
  • Withdrawal Update Form 2FORM-2.pdf · uploaded 8 Jul 2025View
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 8 Jul 2025View
  • Withdrawal Update Form 2FORM-2.pdf · uploaded 8 Jul 2025View
  • Form 2A (FY 2024-2025)FORM-2A.pdf · uploaded 8 Jul 2025View
  • Form 5 (FY 2024-2025)FORM-5.pdf · uploaded 8 Jul 2025View
  • Withdrawal Update Form 1FORM-1 JUN-25.pdf · uploaded 21 Sep 2025View
  • Withdrawal Update Form 2FORM-2 JUN-25.pdf · uploaded 21 Sep 2025View
  • Form 1FORM-1 JUN-24 UPDATE.pdf · uploaded 22 Sep 2025View
  • Form 2FORM-2 JUN-24.pdf · uploaded 22 Sep 2025View
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD JUN-24.pdf · uploaded 22 Sep 2025View
  • Form 1FORM-1 SEPT-24.pdf · uploaded 22 Sep 2025View
  • Form 2FORM-2 SEPT-24.pdf · uploaded 22 Sep 2025View
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD SEPT-24.pdf · uploaded 22 Sep 2025View
  • Form 1FORM-1 DEC-24 UPDATE.pdf · uploaded 22 Sep 2025View
  • Form 2FORM-2 DEC-24.pdf · uploaded 22 Sep 2025View
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD DEC-24 UPDATE.pdf · uploaded 22 Sep 2025View
  • Form 1FORM-1 MAR-25.pdf · uploaded 22 Sep 2025View
  • Form 2FORM-2 MAR-25.pdf · uploaded 22 Sep 2025View
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD MAR-25.pdf · uploaded 22 Sep 2025View
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 27 Oct 2025View
  • Withdrawal Update Form 2FORM-2.pdf · uploaded 27 Oct 2025View
  • Withdrawal Update Form 1Form 1 Oak Sterling Vista_ DEC 2025.pdf · uploaded 20 Jan 2026View
  • Withdrawal Update Form 2Form 2 Sterling Vista_DEC 2025.pdf · uploaded 20 Jan 2026View
  • Withdrawal Update Form 1Form 1 Oak Sterling Vista_ DEC 2025.pdf · uploaded 8 Apr 2026View
  • Withdrawal Update Form 2Form 2 Sterling Vista_DEC 2025.pdf · uploaded 8 Apr 2026View
  • Withdrawal Update Form 1FORM-1 OAK STERLING VISTA MAR-2026.pdf · uploaded 23 Apr 2026View
  • Withdrawal Update Form 2FORM-2 OAK STERLING VISTA MAR-2026.pdf · uploaded 23 Apr 2026View
  • Withdrawal Update Form 1FORM-1 OAK STERLING VISTA MAR-2026.pdf · uploaded 18 Jul 2026View
  • Withdrawal Update Form 2FORM-2 OAK STERLING VISTA MAR-2026.pdf · uploaded 18 Jul 2026View
  • Withdrawal Update Form 1FORM-1 OAK STERLING VISTA JUN-2026.pdf · uploaded 24 Jul 2026View
  • Withdrawal Update Form 2FORM-2 OAK STERLING VISTA JUN-2026.pdf · uploaded 24 Jul 2026View

Promoter documents

  • Legal Title reportSearch Report - OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
  • Declaration Form BAffidavit - FORM B.pdf · uploaded 9 Mar 2024View

Technical documents

  • Layout ApprovalSterling Vista Layout plan.pdfView
  • Building Plan Approval1.pdfView
  • Building Plan Approval2.pdfView
  • Building Plan Approval3.pdfView
  • Building Plan Approval4.pdfView
  • Building Plan Approval5.pdfView
  • Building Plan Approval6.pdfView
  • Building Plan Approval7.pdfView
  • Building Plan Approval8.pdfView
  • Building Plan Approval9.pdfView

Other legal documents

  • Other – LegalDeclaration.pdfView
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-1-10.pdfView
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-11-20.pdfView
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-21-30.pdfView
  • Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-31-40.pdfView
  • Other – LegalSterling Vista LLP - Sale Deed_compressed-1-10.pdfView
  • Other – LegalSterling Vista LLP - Sale Deed_compressed-11-20.pdfView
  • Other – LegalSterling Vista LLP - Sale Deed_compressed-21-38.pdfView
  • OthersFORM-B.pdfView
  • OthersFORM-B.pdfView
  • OthersENCUMBRANCE CERTIFICATE_LEGAL.pdfView

Financial documents

  • OthersENCUMBRANCE CERTIFICATE_FINANCE.pdf · uploaded 29 Dec 2025View

Proforma allotment letter

  • Proforma allotment letterALLOTMENT_.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

KHASRA ZINGABAI TAKLI 248/2

As published on MahaRERA's project page

MOUZA AND KHASRA ZINGABAI TAKLI 248/2

Boundaries

North
Land Of Khasra No 248-1 Darshana Co Op Society
South
Land Khasra No 248-2 Portation A Green Edifice Inf
East
9 Mtrs Wide Road
West
Land Of Shri Chaudhary

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSyed Mobin Architects—
Chartered accountantCa Ankit Talreja—
Chartered accountantSumit Santosh Agrawal & Associates—
EngineerN B Dandekar—

Source: MahaRERA project page. Contact details are not shown.