Oak Sterling Vista
ActiveNagpur (M Corp.), Nagpur 440013 |Promoter: Oak Sterling Vista LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 4
- Land area for this project
- 3,900 sq m (41,979 sq ft)
- Permissible built-up area
- 9,955 sq m (1,07,149 sq ft)
- Sanctioned built-up area
- 9,905 sq m (1,06,620 sq ft)
- Planning authority
- Nagpur Improvement Trust (NIT)
- Address
- Mouza And Khasra Zingabai Takli 248/2, Zingabai Takli, Mouza Zingabai TakliPIN 440013
- Designated bank account
- State Bank Of India
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 22 Apr 2024
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500055834 | 22 Apr 2024 | 31 Dec 2026 | — | Oak Sterling Vista LLP | Project page |
4 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building (P50500055834) | — | — |
| Wing A | 9 | — |
| Wing B | 9 | — |
| Wing C | 5 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| Wing A | Closed/Covered | 73 | 30 | 0 | 0 | 103 |
| Wing A | Open Space | 0 | 0 | 0 | 0 | 0 |
| Wing B | Closed/Covered | 77 | 26 | 0 | 0 | 103 |
| Wing B | Open Space | 0 | 0 | 0 | 0 | 0 |
| Wing C | Closed/Covered | 38 | 22 | 0 | 0 | 60 |
| Wing C | Open Space | 0 | 0 | 0 | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Wing A
Wing B
Wing C
Common areas and amenities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
83 documents held by Deedo, 117 filings listed on MahaRERA's project page
Commencement certificates
Encumbrances
Others
- Other9 Mar 2024ViewSource
- Other9 Mar 2024ViewSource
- Other9 Mar 2024ViewSource
- Other9 Mar 2024ViewSource
- Other9 Mar 2024ViewSource
- Other9 Mar 2024ViewSource
- Other20 Jul 2024ViewSource
- Other17 Oct 2024ViewSource
- Other21 Jan 2025ViewSource
- Other15 Apr 2025ViewSource
- Other15 Apr 2025ViewSource
- Other22 Sep 2025ViewSource
- Other22 Sep 2025ViewSource
- Other22 Sep 2025ViewSource
- Other22 Sep 2025ViewSource
- Other29 Dec 2025ViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Form 1s
- Form 113 Jul 2024ViewSource
- Form 115 Oct 2024ViewSource
- Form 12 Jan 2025ViewSource
- Form 115 Apr 2025ViewSource
- Form 115 Apr 2025ViewSource
- Form 121 Sep 2025ViewSource
- Form 122 Sep 2025ViewSource
- Form 122 Sep 2025ViewSource
- Form 122 Sep 2025ViewSource
- Form 122 Sep 2025ViewSource
- Form 127 Oct 2025ViewSource
- Form 18 Apr 2026ViewSource
- Form 118 Jul 2026ViewSource
- Form 124 Jul 2026ViewSource
Form 2s
- Form 220 Jul 2024ViewSource
- Form 217 Oct 2024ViewSource
- Form 222 Jan 2025ViewSource
- Form 215 Apr 2025ViewSource
- Form 215 Apr 2025ViewSource
- Form 221 Sep 2025ViewSource
- Form 222 Sep 2025ViewSource
- Form 222 Sep 2025ViewSource
- Form 222 Sep 2025ViewSource
- Form 222 Sep 2025ViewSource
- Form 227 Oct 2025ViewSource
- Form 28 Apr 2026ViewSource
- Form 218 Jul 2026ViewSource
- Form 224 Jul 2026ViewSource
Building plans
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
Document library
- Commencement Certificates / NA Order for plotted developmentSterling Vista - Building Permit.pdf · uploaded 7 Mar 2024View
- Copy of the legal title reportSearch Report - OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
- a Details of encumbrances concerned to FinanceEncumbrance - Finance.pdf · uploaded 9 Mar 2024View
- b Details of encumbrances concerned to LegalEncumbrance - Finance.pdf · uploaded 9 Mar 2024View
- a Details of encumbrances concerned to FinanceEncumbrance - Legal.pdf · uploaded 9 Mar 2024View
- b Details of encumbrances concerned to LegalEncumbrance - Legal.pdf · uploaded 9 Mar 2024View
- Declaration in FORM BAffidavit - FORM B.pdf · uploaded 9 Mar 2024View
- Deviation Report with respect to Allotment letterDeviation_Allotment letter.pdf · uploaded 9 Mar 2024View
- Deviation Report with respect to model copy of AgreementDeviation report _ats_compressed.pdf · uploaded 9 Mar 2024View
- Proforma of Agreement for saleATS- OAK STERLING VISTA LLP.pdf · uploaded 9 Mar 2024View
- CERSAI detailsCersai.pdf · uploaded 9 Mar 2024View
- Disclosure of Interest in Other Real Estate OrganizationsInterest - Omair.pdf · uploaded 9 Mar 2024View
- Disclosure of Interest in Other Real Estate OrganizationsInterest - Mahesh.pdf · uploaded 9 Mar 2024View
- Disclosure of Interest in Other Real Estate OrganizationsInterest - Rajesh.pdf · uploaded 9 Mar 2024View
- Other – LegalDeclaration.pdf · uploaded 9 Mar 2024View
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-1-10.pdf · uploaded 9 Mar 2024View
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-11-20.pdf · uploaded 9 Mar 2024View
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-21-30.pdf · uploaded 9 Mar 2024View
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-31-40.pdf · uploaded 9 Mar 2024View
- Other – LegalSterling Vista LLP - Sale Deed_compressed-1-10.pdf · uploaded 9 Mar 2024View
- Other – LegalSterling Vista LLP - Sale Deed_compressed-11-20.pdf · uploaded 9 Mar 2024View
- Other – LegalSterling Vista LLP - Sale Deed_compressed-21-38.pdf · uploaded 9 Mar 2024View
- Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-1-10.pdf · uploaded 9 Mar 2024View
- Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-11-20.pdf · uploaded 9 Mar 2024View
- Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-21-30.pdf · uploaded 9 Mar 2024View
- Other – TechnicalOAK STERLING VISTA LLP - Partnership Agreement_compressed-31-40.pdf · uploaded 9 Mar 2024View
- Other – TechnicalSterling Vista LLP - Sale Deed_compressed-1-10.pdf · uploaded 9 Mar 2024View
- Other – TechnicalSterling Vista LLP - Sale Deed_compressed-11-20.pdf · uploaded 9 Mar 2024View
- Other – TechnicalSterling Vista LLP - Sale Deed_compressed-21-38.pdf · uploaded 9 Mar 2024View
- Copy of Layout Approval (in case of layout)Sterling Vista Layout plan.pdf · uploaded 9 Mar 2024View
- Proforma of Allotment letterALLOTMENT_.pdf · uploaded 9 Mar 2024View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK_OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
- Other – TechnicalDeclaration.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development1.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development2.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development3.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development4.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development5.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development6.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development7.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development8.pdf · uploaded 9 Mar 2024View
- Building Plan Approval / NA Order for plotted development9.pdf · uploaded 9 Mar 2024View
- Declaration about Commencement CertificateFORM-D_OAK STERLING VISTA.pdf · uploaded 9 Mar 2024View
- Commencement Certificates / NA Order for plotted developmentQuality-Annexure A Royal Regency Kalidas.pdf · uploaded 3 Apr 2024View
- Other – TechnicalQuality-Annexure A Royal Regency Kalidas.pdf · uploaded 3 Apr 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Sterling Vista - Form 1 June 24 08-Jul-2024 16-35-52.pdf · uploaded 13 Jul 2024View
- Disclosure of sold/ booked inventorySterling Vista Inventory - June 24.pdf · uploaded 20 Jul 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Sterling Vista - Form 2 June 24.pdf · uploaded 20 Jul 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Sterling Vista Sep 24.pdf · uploaded 15 Oct 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Sterling Vista - Form 2 Sep 24.pdf · uploaded 17 Oct 2024View
- Disclosure of sold/ booked inventoryInventory - Sterling Vista Sep 24.pdf · uploaded 17 Oct 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 24 OAK Sterling Vista.pdf · uploaded 2 Jan 2025View
- Disclosure of sold/ booked inventorySold Unsold of Sterling Vista_Dec-2024.pdf · uploaded 21 Jan 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sterling Vista_Dec-2024.pdf · uploaded 22 Jan 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Medsquare Form 1 - March 25.pdf · uploaded 15 Apr 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare Form 2 - March 25.pdf · uploaded 15 Apr 2025View
- Disclosure of sold/ booked inventoryMedsquare Inventory March 25.pdf · uploaded 15 Apr 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 Apr 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 Apr 2025View
- Disclosure of sold/ booked inventorySOLD-UNSOLD.pdf · uploaded 15 Apr 2025View
- Withdrawal Update Form 1FORM-1.pdf · uploaded 8 Jul 2025View
- Withdrawal Update Form 2FORM-2.pdf · uploaded 8 Jul 2025View
- Withdrawal Update Form 1FORM-1.pdf · uploaded 8 Jul 2025View
- Withdrawal Update Form 2FORM-2.pdf · uploaded 8 Jul 2025View
- Form 2A (FY 2024-2025)FORM-2A.pdf · uploaded 8 Jul 2025View
- Form 5 (FY 2024-2025)FORM-5.pdf · uploaded 8 Jul 2025View
- Withdrawal Update Form 1FORM-1 JUN-25.pdf · uploaded 21 Sep 2025View
- Withdrawal Update Form 2FORM-2 JUN-25.pdf · uploaded 21 Sep 2025View
- Form 1FORM-1 JUN-24 UPDATE.pdf · uploaded 22 Sep 2025View
- Form 2FORM-2 JUN-24.pdf · uploaded 22 Sep 2025View
- Disclosure of Sold and Booked InventorySOLD-UNSOLD JUN-24.pdf · uploaded 22 Sep 2025View
- Form 1FORM-1 SEPT-24.pdf · uploaded 22 Sep 2025View
- Form 2FORM-2 SEPT-24.pdf · uploaded 22 Sep 2025View
- Disclosure of Sold and Booked InventorySOLD-UNSOLD SEPT-24.pdf · uploaded 22 Sep 2025View
- Form 1FORM-1 DEC-24 UPDATE.pdf · uploaded 22 Sep 2025View
- Form 2FORM-2 DEC-24.pdf · uploaded 22 Sep 2025View
- Disclosure of Sold and Booked InventorySOLD-UNSOLD DEC-24 UPDATE.pdf · uploaded 22 Sep 2025View
- Form 1FORM-1 MAR-25.pdf · uploaded 22 Sep 2025View
- Form 2FORM-2 MAR-25.pdf · uploaded 22 Sep 2025View
- Disclosure of Sold and Booked InventorySOLD-UNSOLD MAR-25.pdf · uploaded 22 Sep 2025View
- Withdrawal Update Form 1FORM-1.pdf · uploaded 27 Oct 2025View
- Withdrawal Update Form 2FORM-2.pdf · uploaded 27 Oct 2025View
- Withdrawal Update Form 1Form 1 Oak Sterling Vista_ DEC 2025.pdf · uploaded 20 Jan 2026View
- Withdrawal Update Form 2Form 2 Sterling Vista_DEC 2025.pdf · uploaded 20 Jan 2026View
- Withdrawal Update Form 1Form 1 Oak Sterling Vista_ DEC 2025.pdf · uploaded 8 Apr 2026View
- Withdrawal Update Form 2Form 2 Sterling Vista_DEC 2025.pdf · uploaded 8 Apr 2026View
- Withdrawal Update Form 1FORM-1 OAK STERLING VISTA MAR-2026.pdf · uploaded 23 Apr 2026View
- Withdrawal Update Form 2FORM-2 OAK STERLING VISTA MAR-2026.pdf · uploaded 23 Apr 2026View
- Withdrawal Update Form 1FORM-1 OAK STERLING VISTA MAR-2026.pdf · uploaded 18 Jul 2026View
- Withdrawal Update Form 2FORM-2 OAK STERLING VISTA MAR-2026.pdf · uploaded 18 Jul 2026View
- Withdrawal Update Form 1FORM-1 OAK STERLING VISTA JUN-2026.pdf · uploaded 24 Jul 2026View
- Withdrawal Update Form 2FORM-2 OAK STERLING VISTA JUN-2026.pdf · uploaded 24 Jul 2026View
Promoter documents
Technical documents
- Layout ApprovalSterling Vista Layout plan.pdfView
- Building Plan Approval1.pdfView
- Building Plan Approval2.pdfView
- Building Plan Approval3.pdfView
- Building Plan Approval4.pdfView
- Building Plan Approval5.pdfView
- Building Plan Approval6.pdfView
- Building Plan Approval7.pdfView
- Building Plan Approval8.pdfView
- Building Plan Approval9.pdfView
Other legal documents
- Other – LegalDeclaration.pdfView
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-1-10.pdfView
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-11-20.pdfView
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-21-30.pdfView
- Other – LegalOAK STERLING VISTA LLP - Partnership Agreement_compressed-31-40.pdfView
- Other – LegalSterling Vista LLP - Sale Deed_compressed-1-10.pdfView
- Other – LegalSterling Vista LLP - Sale Deed_compressed-11-20.pdfView
- Other – LegalSterling Vista LLP - Sale Deed_compressed-21-38.pdfView
- OthersFORM-B.pdfView
- OthersFORM-B.pdfView
- OthersENCUMBRANCE CERTIFICATE_LEGAL.pdfView
Financial documents
- OthersENCUMBRANCE CERTIFICATE_FINANCE.pdf · uploaded 29 Dec 2025View
Proforma allotment letter
- Proforma allotment letterALLOTMENT_.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nagpur (M Corp.), Nagpur (Urban) taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
MOUZA AND KHASRA ZINGABAI TAKLI 248/2
Boundaries
- North
- Land Of Khasra No 248-1 Darshana Co Op Society
- South
- Land Khasra No 248-2 Portation A Green Edifice Inf
- East
- 9 Mtrs Wide Road
- West
- Land Of Shri Chaudhary
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Syed Mobin Architects | — |
| Chartered accountant | Ca Ankit Talreja | — |
| Chartered accountant | Sumit Santosh Agrawal & Associates | — |
| Engineer | N B Dandekar | — |
Source: MahaRERA project page. Contact details are not shown.