Nagpur (M Corp.), Nagpur 440017 |Promoter: OAK Constructions

5 Jul 2019Registered with MahaRERA
30 Dec 2022Promised completion
31 Dec 2025Revised completionPushed back 3 years
1Building
2MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
1,848 sq m (19,892 sq ft)
Permissible built-up area
1,845 sq m (19,859 sq ft)
Sanctioned built-up area
1,845 sq m (19,859 sq ft)
Planning authority
NAGPUR MUNICIPAL CORPORATION
Address
Plot No. 16, City Survey No. 897, Sheet No. 47, House No. 20, Kamptee Road, IndoraPIN 440017
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.17579, 79.10479
OAK Med-Square is at latitude 21.17579, longitude 79.10479.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 3 years

The latest completion date on record passed 10 months ago.

Registered
5 Jul 2019
Promised
30 Dec 2022
Revised
31 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000215115 Jul 201930 Dec 202231 Dec 2025OAK ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
OAK Med-Square4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered01001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

OAK Med-Square

  • Excavation100%
  • Basement (if any)85%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor78%
  • Slabs of Super Structure90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
  • Sanitary Fittings within the flats / premises35%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.19%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER SANCTIONED PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANCTIONED PLAN15%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANCTIONED PLAN0%
  • Energy managemcntAS PER SANCTIONED PLAN0%
  • Fire protection and fire safety requirementsAS PER SANCTIONED PLAN45%
  • Electrical meter room, sub-station, receiving stationAS PER SANCTIONED PLAN50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

34 documents held by Deedo, 135 filings listed on MahaRERA's project page

Allotment letters

Form 5s

Form 1s

Registration certificate

Others

Encumbrance

Extension certificate

Document library

  • Declaration in FORM BDeclaration in Form B.pdf · uploaded 29 Jun 2019Source
  • Details of encumbrancesEncumbrance Details 001-compressed-compressed.pdf · uploaded 29 Jun 2019Source
  • Commencement Certificates / NA Order for plotted developmentOak Medsquare - building permit 27-Jun-2019 19-55-17-compressed.pdf · uploaded 29 Jun 2019Source
  • Copy of the legal title reportLegal Title Report.pdf · uploaded 29 Jun 2019Source
  • Building Plan Approval (IOD)Sanction Plan.pdf · uploaded 29 Jun 2019Source
  • Proforma of Allotment letterAllotment Letter 001-compressed-compressed.pdf · uploaded 29 Jun 2019View
  • Copy of Layout Approval (in case of layout)Sanction Plan.pdf · uploaded 29 Jun 2019Source
  • Proforma of Allotment letterAGREEMENT FOR SALE.pdf · uploaded 29 Jun 2019View
  • Copy of the legal title reportMedsquare - Search Report.pdf · uploaded 31 Jul 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 19-20.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 20 - 21.pdf · uploaded 31 Jul 2021View
  • Copy of the legal title reportMedsquare - Search Report 03-Aug-2021 16-24-03_compressed.pdf · uploaded 3 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)OAK MEDSQUARE_ARCHITECT CERTIFICATE_05-07-2019.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)OAK MEDSQUARE_ARCHITECT CERTIFICATE_01-04-2020.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)OAK MEDSQUARE_ARCHITECT CERTIFICATE_01-04-2021.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)OAK MEDSQUARE_ARCHITECT CERTIFICATE_01-07-2021.pdf · uploaded 14 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 5-07-19.pdf · uploaded 14 Aug 2021Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 1-04-2020.pdf · uploaded 14 Aug 2021Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-04-2021.pdf · uploaded 14 Aug 2021Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-07-2021.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2a 30-09-2019.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2a 31-12-2019.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2a 31-03-2020.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2a 30-06-2020.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2a 30-09-2020.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2a 31-12-2020.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2a 31-03-2021.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2a 30-06-2021.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)OAK MEDSQUARE_ARCHITECT CERTIFICATE_24-11-2021.pdf · uploaded 24 Nov 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 2021-22 2nd Quarter.pdf · uploaded 27 Nov 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2a 2021-22 2nd Quarter.pdf · uploaded 27 Nov 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 - 2021-22 3rd Quarter.pdf · uploaded 24 Jan 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 3rd Quarter 2021-2022.pdf · uploaded 24 Jan 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA - Form 1 - 2021-22 4th Quarter.pdf · uploaded 2 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 2021-22 4th Quarter.pdf · uploaded 27 May 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA - FORM 1 - 2022-23 1st Quarter.pdf · uploaded 19 Jul 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 1st Quarter 2022-2023.pdf · uploaded 1 Sep 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA Form 1 - 2022-23 2nd Quarter.pdf · uploaded 20 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sep 19.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 19.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 20.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 20.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 20.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Jun 20.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 21.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sep 20.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 21.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Jun 21.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Mar 22.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sep 21.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Jun 22.pdf · uploaded 18 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Sep 22.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 19.pdf · uploaded 18 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 20.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 19.pdf · uploaded 18 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Mar 20.pdf · uploaded 18 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Jun 20.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 20.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Jun 21.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Mar 21.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 21.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 21.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Jun 22.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Mar 22.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 22.pdf · uploaded 18 Feb 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 2021-22.pdf · uploaded 18 Feb 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM-5_MED-SQUARE_19-20.pdf · uploaded 21 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM-5_MED-SQUARE_20-21.pdf · uploaded 21 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM-5_MED-SQUARE_21-22.pdf · uploaded 21 Feb 2023View
  • Disclosure of sold/ booked inventorySold-Booked Inventory Sep 22.pdf · uploaded 22 Feb 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Medsquare Form 1- Dec 22.pdf · uploaded 8 Jun 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Medsquare Form 1 - March 23.pdf · uploaded 8 Jun 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare Form 2 - Dec 22.pdf · uploaded 8 Jun 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare Form 2 - March 23.pdf · uploaded 8 Jun 2023Source
  • Proforma of Agreement for saleATS_ OAK COnstruction.pdf · uploaded 14 Jun 2023View
  • Deviation Report with respect to model copy of AgreementATS_ OAK COnstruction.pdf · uploaded 14 Jun 2023View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 14 Jun 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Bank Account.pdf · uploaded 14 Jun 2023View
  • Deviation Report with respect to model copy of AgreementDeviation_Agreement to Sale.pdf · uploaded 14 Jun 2023View
  • Deviation Report with respect to Allotment letterDeviation_Allotment Letter.pdf · uploaded 14 Jun 2023View
  • a Details of encumbrances concerned to FinanceEmcumbrance Certificate (Legal).pdf · uploaded 14 Jun 2023Source
  • b Details of encumbrances concerned to LegalEmcumbrance Certificate (Legal).pdf · uploaded 14 Jun 2023Source
  • Declaration about Commencement CertificateFORM-D.pdf · uploaded 14 Jun 2023Source
  • Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Omair.pdf · uploaded 14 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest Discloser_Raffat.pdf · uploaded 14 Jun 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2022 -2023.pdf · uploaded 11 Aug 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)March 23.pdf · uploaded 11 Aug 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 23 Medsquare.pdf · uploaded 12 Aug 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 23 Medsquare.pdf · uploaded 12 Aug 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 23.pdf · uploaded 14 Oct 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare - Sep 23.pdf · uploaded 20 Oct 2023Source
  • Disclosure of sold/ booked inventoryMarch 23.pdf · uploaded 21 Oct 2023View
  • Disclosure of sold/ booked inventoryJune 23.pdf · uploaded 21 Oct 2023View
  • Disclosure of sold/ booked inventorySep 23.pdf · uploaded 21 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 23.pdf · uploaded 12 Jan 2024Source
  • Disclosure of sold/ booked inventoryMedsquare - Inventory-Dec-23.pdf · uploaded 27 Jan 2024View
  • Declaration in FORM BForm B Medsquare 30-Jan-2024 13-09-01.pdf · uploaded 5 Feb 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Medsquare Dec 23.pdf · uploaded 9 Feb 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)OAK MED-SQUARE_Architech Working_FORM-1_MAR-24.pdf · uploaded 10 Apr 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 24 Medsquare.pdf · uploaded 13 Apr 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Mar 24 Medsquare.pdf · uploaded 13 Apr 2024Source
  • Disclosure of sold/ booked inventorySold-Unsold Inventory Medsquare 10-Apr-2024 17-03-31.pdf · uploaded 13 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf · uploaded 8 May 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Medsquare - Form 1 June 24 08-Jul-2024 16-33-28.pdf · uploaded 12 Jul 2024Source
  • Disclosure of sold/ booked inventoryMedsquare Inventory - June 24.pdf · uploaded 20 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare - Form 2 June 24.pdf · uploaded 20 Jul 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Medsquare Sep 24.pdf · uploaded 14 Oct 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare - Form 2 Sep 24.pdf · uploaded 17 Oct 2024Source
  • Disclosure of sold/ booked inventoryInventory - Medsquare Sep 24.pdf · uploaded 17 Oct 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 med.pdf · uploaded 30 Oct 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 24 OAK Medsquare.pdf · uploaded 2 Jan 2025View
  • Disclosure of sold/ booked inventorySold Unsold of Medsquare_Dec- 2024.pdf · uploaded 21 Jan 2025Source
  • Disclosure of Interest in Other Real Estate OrganizationsForm 3 Medsquare_Dec-2024.pdf · uploaded 22 Jan 2025Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Medsquare_Dec-2024.pdf · uploaded 22 Jan 2025Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Medsquare Form 1 - March 25.pdf · uploaded 15 Apr 2025Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Medsquare Form 2 - March 25.pdf · uploaded 15 Apr 2025Source
  • Disclosure of sold/ booked inventorySOLD-UNSOLD.pdf · uploaded 15 Apr 2025Source
  • Form 5 (FY 2024-2025)Form 5 2024-2025.pdf · uploaded 8 Jul 2025Source
  • Form 2A (FY 2024-2025)Form 2A 2024-2025.pdf · uploaded 15 Jul 2025Source
  • Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 15 Jul 2025Source
  • Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 15 Jul 2025Source
  • Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 25 Oct 2025Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2FORM-2.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Oak Medsquare_DEC 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 Oak Medsquare_DEC 2025.pdf · uploaded 20 Jan 2026Source

Promoter documents

  • Declaration Form BDeclaration in Form B.pdf · uploaded 29 Jun 2019Source
  • Legal Title reportLegal Title Report.pdf · uploaded 29 Jun 2019Source
  • Legal Title reportMedsquare - Search Report.pdf · uploaded 31 Jul 2021Source
  • Legal Title reportMedsquare - Search Report 03-Aug-2021 16-24-03_compressed.pdf · uploaded 3 Aug 2021Source
  • Declaration Form BForm B Medsquare 30-Jan-2024 13-09-01.pdf · uploaded 5 Feb 2024Source

Technical documents

  • Building Plan ApprovalSanction Plan.pdfSource
  • Layout ApprovalSanction Plan.pdfSource

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

16897City Survey No. 897House No. 20Plot No. 16Sheet No. 47

As published on MahaRERA's project page

Plot No. 16, City Survey No. 897, Sheet No. 47, House No. 20

Boundaries

North
Road
South
Conservancy Lane
East
CTS No 896
West
CTS No 898

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSyed Mobinuddin—
Chartered accountantG A D & Associates—
Chartered accountantMohammed Tajammul Hussain Ansari—
Chartered accountantSumit Santosh Agrawal & Associates—
EngineerNitin Balram Dandekar—
Real Estate Agent1realty—
Real Estate Agent9 Pillars—
Registered real estate agent1realtyA50500006359
Registered real estate agent9 PillarsA50500011922

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology