Madan Ratan City

Active

Nagpur (M Corp.), Nagpur 440032 |Promoter: Emaar Developers & Builders Pvt Ltd

28 Jul 2017Registered with MahaRERA
30 Jun 2021Promised completion
31 Dec 2026Revised completionPushed back 5 years and 6 months
7Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
7
Land area for this project
17,971 sq m (1,93,437 sq ft)
Permissible built-up area
21,090 sq m (2,27,005 sq ft)
Sanctioned built-up area
14,317 sq m (1,54,103 sq ft)
Recreational open space
2,300 sq m (24,761 sq ft)
Planning authority
CREDAI NAGPUR
Address
City Survey No. 39 Kh No 21/1, Mouza Chikhali Khurd House No 4714/ 1, Bhole Nagar, Nagpur 440024, Mouza Chikhali KhurdPIN 440032
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.14211, 79.11110
Madan Ratan City is at latitude 21.14211, longitude 79.11110.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 5 years and 6 months

Registered
28 Jul 2017
Promised
30 Jun 2021
Revised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000147328 Jul 201730 Jun 202131 Dec 2026Emaar Developers & Builders Pvt LtdProject page

7 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Aden Villa-1Closed/Covered00009
Aden Villa-1Open Space00000
Aden Villa-2Closed/Covered00008
Aden Villa-2Open Space00000
Aden Villa-3Closed/Covered00009
Aden Villa-3Open Space00000
Amaro Apartment 7th FloorClosed/Covered00000
Amaro Apartment 7th FloorOpen Space00008
Amaro Apartment G-6Closed/Covered000051
Amaro Apartment G-6Open Space00000
Amber 7th FloorClosed/Covered00000
Amber 7th FloorOpen Space000020
Amber G-6 FloorClosed/Covered00001
Amber G-6 FloorOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aden Villa-1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Aden Villa-2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises85%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Aden Villa-3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Amaro Apartment 7th Floor

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Amaro Apartment G-6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
  • Sanitary Fittings within the flats / premises55%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Amber 7th Floor

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Amber G-6 Floor

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises85%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Common areas and amenities

  • Internal Roads & FootpathsRoads completed upto WMM layer.85%
  • Water SupplyApplication shall be made after OC. NOC received.25%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Plan50%
  • Storm Water DrainsAs per Plan50%
  • Landscaping & Tree PlantingAs per Plan70%
  • Street LightingRoad crossings completed.55%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per Plan25%
  • Solid Waste Management And DisposalAs per Plan0%
  • Water conservation /Rain water harvestingAs per Plan25%
  • Energy managemcntAs per Plan0%
  • Fire protection and fire safety requirementsAs per Plan55%
  • Electrical meter room, sub-station, receiving stationNo sub station.Only transforemers & control panels35%
  • Aggregate area of recreational Open SpaceAs per Plan0%
  • Open ParkingAs per Plan0%
  • Entrance Gate and Security CabinCivil work completed.85%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

54 documents held by Deedo, 168 filings listed on MahaRERA's project page

Form 2s

Registration certificate

Others

Form 1s

Form 5s

Form bs

Extension certificate

Document library

  • Copy of the legal title reportTITLE REPORT.PDF · uploaded 24 Jul 2017Source
  • Details of encumbrancesTITLE REPORT.PDF · uploaded 24 Jul 2017Source
  • Copy of Layout Approval (in case of layout)Layout Sanction- Letter_2IN1.pdf · uploaded 24 Jul 2017Source
  • Copy of Layout Approval (in case of layout)Layout Sanctioned Map_2IN1.pdf · uploaded 24 Jul 2017Source
  • Proforma of Allotment letterAGREEMENT-RERA-EMAAR-RATAN-CHIKHLI KHURD-F.pdf · uploaded 24 Jul 2017Source
  • Declaration in FORM BEMAAR FORM B.pdf · uploaded 24 Jul 2017Source
  • Commencement Certificates / NA Order for plotted developmentBUILDING PERMIT.PDF · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC1-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC2-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC3-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC4-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC5-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC6-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC7-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC8-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC9-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC10-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC11-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC12-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC13-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC14-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC15-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • Building Plan Approval (IOD)MRC16-16_2IN1.pdf · uploaded 24 Jul 2017Source
  • OtherAMARO PROPOSED 7TH FLOOR.pdf · uploaded 24 Jul 2017Source
  • OtherAMBER PROPOSED 7TH FLOOR.pdf · uploaded 24 Jul 2017Source
  • OtherCertificate of Company Registration_2IN1.pdf · uploaded 24 Jul 2017Source
  • OtherCOMPANY RESOLUTION.pdf · uploaded 24 Jul 2017Source
  • OtherProperty Card.pdf · uploaded 25 Jul 2017Source
  • OtherWATER NOC.PDF · uploaded 25 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ratan maharara architect certificate.pdf · uploaded 25 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)emaar engineering certificate.pdf · uploaded 25 Jul 2017View
  • Certificates of CA (Form 5)Form 5.pdf · uploaded 27 Apr 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)form 5 Emaar 18-19.pdf · uploaded 14 Aug 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form 5 Emaar 19-20.pdf · uploaded 14 Aug 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 31st March 2021.pdf · uploaded 13 Dec 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 31st March 2022.pdf · uploaded 13 Dec 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Emaar RERA FORM 2A 30 Sept 2022.pdf · uploaded 13 Dec 2022Source
  • Other – TechnicalEmaar RERA Form 1 30 Sept 2022.pdf · uploaded 13 Dec 2022Source
  • Other – TechnicalEmaar RERA Form 2 30 Sept 2022.pdf · uploaded 13 Dec 2022View
  • OtherEmaar RERA List of Sold and Unsold Inventory 30 Sept 2022.pdf · uploaded 13 Dec 2022Source
  • Disclosure of Interest in Other Real Estate OrganizationsFORM 3.pdf · uploaded 4 Jan 2023Source
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 4 Jan 2023Source
  • Disclosure of sold/ booked inventorySold Booked Aden 1.pdf · uploaded 4 Jan 2023Source
  • Disclosure of sold/ booked inventorySold Booked Aden 2.pdf · uploaded 4 Jan 2023Source
  • Disclosure of sold/ booked inventorySold Booked Aden 3.pdf · uploaded 4 Jan 2023Source
  • Disclosure of sold/ booked inventorySold Booked Amaro Apt.pdf · uploaded 4 Jan 2023Source
  • Disclosure of sold/ booked inventorySold Booked Amber Apt.pdf · uploaded 4 Jan 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1.pdf · uploaded 4 Jan 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 4 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A.pdf · uploaded 4 Jan 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 22.pdf · uploaded 4 Jan 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 21.pdf · uploaded 4 Jan 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 22.pdf · uploaded 4 Jan 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 31-12-2022.pdf · uploaded 26 Feb 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 31-03-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 30-06-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 30-09-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 31-12-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 31-12-2022.pdf · uploaded 26 Feb 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 31-03-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 30-06-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 30-09-2023.pdf · uploaded 26 Feb 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 31-12-2023.pdf · uploaded 26 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 26 Feb 2024Source
  • Disclosure of sold/ booked inventoryDisclosure of Sold- Booked Inventory.pdf · uploaded 26 Feb 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 27 Feb 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 31-03-24.pdf · uploaded 6 Jun 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 31-03-24.pdf · uploaded 6 Jun 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 6 Jun 2024Source
  • Certificates of CA (Form 5)Form 5 23-24.pdf · uploaded 23 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 23 Oct 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23-24.pdf · uploaded 23 Oct 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect Certificate 30624.pdf · uploaded 23 Oct 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineer Certificate30624.pdf · uploaded 23 Oct 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Architect Certificate 30924.pdf · uploaded 23 Oct 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate 30924.pdf · uploaded 23 Oct 2024View
  • Disclosure of sold/ booked inventorySold Unsold 30-06-24.pdf · uploaded 25 Oct 2024View
  • Disclosure of sold/ booked inventorySold Unsold 30-09-24.pdf · uploaded 25 Oct 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate.pdf · uploaded 2 Dec 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineers Certificate.pdf · uploaded 2 Dec 2024View
  • Declaration in FORM BForm B Emaar _compressed.pdf · uploaded 2 Dec 2024View
  • Declaration in FORM BForm B Emaar _compressed.pdf · uploaded 2 Dec 2024View
  • Declaration in FORM BForm B Emaar project Extensioncompressed.pdf · uploaded 11 Dec 2024View
  • Other – TechnicalCPM PERT.pdf · uploaded 1 Feb 2025View
  • Other – TechnicalJustification for Extension.pdf · uploaded 1 Feb 2025View
  • Other – TechnicalMada Letter.pdf · uploaded 1 Feb 2025View
  • Other – TechnicalMap Revision Application.pdf · uploaded 1 Feb 2025View
  • Other – TechnicalMHDA Indemnity bond.pdf · uploaded 1 Feb 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architects Certificate.pdf · uploaded 10 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineers Certificate.pdf · uploaded 10 Feb 2025View
  • Certificates of CA (Form 5)Form 5.pdf · uploaded 10 Feb 2025View
  • Disclosure of sold/ booked inventoryDisclosure of sold-booked inventory.pdf · uploaded 10 Feb 2025View
  • Form 1FORM 1 Architect Certificate 30624.pdf · uploaded 3 Jun 2025View
  • Form 2FORM 2 Engineer Certificate30624.pdf · uploaded 3 Jun 2025View
  • Disclosure of Sold and Booked InventorySold Unsold 30-06-24.pdf · uploaded 3 Jun 2025View
  • Form 1Form1 Architect Certificate 30924.pdf · uploaded 3 Jun 2025View
  • Form 2Form 2 Engineer Certificate 30924.pdf · uploaded 3 Jun 2025View
  • Disclosure of Sold and Booked InventorySold Unsold 30-09-24.pdf · uploaded 3 Jun 2025View
  • Form 1Form 1 Architects Certificate.pdf · uploaded 3 Jun 2025View
  • Form 2Form 2 Engineers Certificate.pdf · uploaded 3 Jun 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 3 Jun 2025View
  • Form 1Emaar Form 1.pdf · uploaded 3 Jun 2025Source
  • Form 2Emaar Form 2.pdf · uploaded 3 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold 31032025.pdf · uploaded 3 Jun 2025Source
  • Form 1Form 1 30-06-2023.pdf · uploaded 3 Jun 2025View
  • Form 2Form 2 30-06-2023.pdf · uploaded 3 Jun 2025View
  • Form 1Form 1 30-09-2023.pdf · uploaded 3 Jun 2025View
  • Form 2Form 2 30-09-2023.pdf · uploaded 3 Jun 2025View
  • Form 1Form 1 31-12-2023.pdf · uploaded 3 Jun 2025View
  • Form 2Form 2 31-12-2023.pdf · uploaded 3 Jun 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold- Booked Inventory.pdf · uploaded 3 Jun 2025Source
  • Form 1Form 1 31-03-24.pdf · uploaded 3 Jun 2025View
  • Form 2Form 2 31-03-24.pdf · uploaded 3 Jun 2025Source
  • Form 1Form 1.pdf · uploaded 20 Jul 2025View
  • Form 2Form 2.pdf · uploaded 20 Jul 2025View
  • Disclosure of Sold and Booked InventoryDisclosure of sold and Unsold Inventory.pdf · uploaded 20 Jul 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 20 Jul 2025View
  • Form 5 (FY 2024-2025)Emaar Form 5.pdf · uploaded 27 Sep 2025Source
  • Form 2A (FY 2024-2025)FORM-2A.pdf · uploaded 29 Sep 2025Source
  • Form 1Form 1 Q2 FY 25-26.pdf · uploaded 12 Oct 2025View
  • Form 2Form 2 Q2 FY 25-26.pdf · uploaded 12 Oct 2025View
  • Disclosure of Sold and Booked InventorySold Unsold Q2 FY 25-26.pdf · uploaded 12 Oct 2025View
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 12 Oct 2025View
  • Form 1Form 1 Q3 FY 25-26.pdf · uploaded 20 Jan 2026View
  • Form 2Form 2 Q3 FY 25-26.pdf · uploaded 20 Jan 2026View
  • Disclosure of Sold and Booked InventorySold - unsold.pdf · uploaded 20 Jan 2026View
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 20 Jan 2026View
  • Form 1Form 1 Architech Certificate Q4 FY 25-26.pdf · uploaded 7 May 2026View
  • Form 2Form 2 Engineer Certificate Q4 FY 25-26.pdf · uploaded 7 May 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventory.pdf · uploaded 7 May 2026View
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 7 May 2026View
  • Form 1Form 1.pdf · uploaded 20 Jul 2026View
  • Form 2Form 2.pdf · uploaded 20 Jul 2026View
  • Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 20 Jul 2026View
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 20 Jul 2026View
  • Form 5 (FY 2025-2026)Form 5.pdf · uploaded 22 Sep 2026View
  • Form 2A (FY 2025-2026)Emaar Form 2A.pdf · uploaded 22 Sep 2026Source

Promoter documents

  • Legal Title reportTITLE REPORT.PDF · uploaded 24 Jul 2017Source
  • Declaration Form BEMAAR FORM B.pdf · uploaded 24 Jul 2017Source
  • Declaration Form BForm B Emaar _compressed.pdf · uploaded 2 Dec 2024View
  • Declaration Form BForm B Emaar _compressed.pdf · uploaded 2 Dec 2024View
  • Declaration Form BForm B Emaar project Extensioncompressed.pdf · uploaded 11 Dec 2024View

Technical documents

  • Layout ApprovalLayout Sanction- Letter_2IN1.pdfSource
  • Layout ApprovalLayout Sanctioned Map_2IN1.pdfSource
  • Building Plan ApprovalMRC1-16_2IN1.pdfSource
  • Building Plan ApprovalMRC2-16_2IN1.pdfSource
  • Building Plan ApprovalMRC3-16_2IN1.pdfSource
  • Building Plan ApprovalMRC4-16_2IN1.pdfSource
  • Building Plan ApprovalMRC5-16_2IN1.pdfSource
  • Building Plan ApprovalMRC6-16_2IN1.pdfSource
  • Building Plan ApprovalMRC7-16_2IN1.pdfSource
  • Building Plan ApprovalMRC8-16_2IN1.pdfSource
  • Building Plan ApprovalMRC9-16_2IN1.pdfSource
  • Building Plan ApprovalMRC10-16_2IN1.pdfSource
  • Building Plan ApprovalMRC11-16_2IN1.pdfSource
  • Building Plan ApprovalMRC12-16_2IN1.pdfSource
  • Building Plan ApprovalMRC13-16_2IN1.pdfSource
  • Building Plan ApprovalMRC14-16_2IN1.pdfSource
  • Building Plan ApprovalMRC15-16_2IN1.pdfSource
  • Building Plan ApprovalMRC16-16_2IN1.pdfSource

Other legal documents

  • OtherAMARO PROPOSED 7TH FLOOR.pdfSource
  • OtherAMBER PROPOSED 7TH FLOOR.pdfSource
  • OtherCertificate of Company Registration_2IN1.pdfSource
  • OtherCOMPANY RESOLUTION.pdfSource
  • OtherProperty Card.pdfSource
  • OtherWATER NOC.PDFSource
  • OtherEmaar RERA List of Sold and Unsold Inventory 30 Sept 2022.pdfSource

Proforma allotment letter

  • Proforma allotment letterAGREEMENT-RERA-EMAAR-RATAN-CHIKHLI KHURD-F.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

CITY SURVEY NO. 39 KH NO 21/1MOUZA CHIKHALI KHURD HOUSE NO 4714/ 1

As published on MahaRERA's project page

CITY SURVEY NO. 39 KH NO 21/1, MOUZA CHIKHALI KHURD HOUSE NO 4714/ 1, BHOLE NAGAR, NAGPUR 440024

Boundaries

North
Part Of Khasara No 21-1
South
Khasara No 21-2
East
Road
West
Khasara No 14

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Aditya Indurkar—
Chartered accountantA M Dabke & Associates—
Chartered accountantKhanzode & Shenwai Chartered Accountants—
Chartered accountantRakesh Thakre & Co—
EngineerAaj Engineers & Consultants Pvt Ltd—
EngineerEr Arun Uttarwar—
EngineerEr Muqsit Ahmed Shaikh—
OtherDevashish Joshi—
OtherK C Jala Construction—
OtherMrs Archana Zilpewar—
OtherNarendra Bobde—
OtherPadole Electrical Company Prop Madhukar Padole—
OtherR D L Construction—
OtherSeemant Dubey—
OtherVaibhav Wanwe Plumbing Contractor—
OtherVishal Kondapurwar Painting Contractor—
OtherVishnu Construction Prop Gajanand Jangid—

Source: MahaRERA project page. Contact details are not shown.