Liviano 2

Completed

Nagpur (M Corp.), Nagpur 440015 |Promoter: Space Infrastructure

Residential / Group HousingRERAP50500010526
31 Aug 2017Registered with MahaRERA
31 Aug 2019Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2bhk, 2BHK, 3bhk, 3BHK16 units in all
Land area for this project
678 sq m (7,298 sq ft)
Permissible built-up area
678 sq m (7,298 sq ft)
Sanctioned built-up area
678 sq m (7,298 sq ft)
Address
Plot No 3PIN 440015
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.06109, 72.87916
Liviano 2 is at latitude 19.06109, longitude 72.87916.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Aug 2019

The latest completion date on record passed 7 years and 2 months ago.

Registered
31 Aug 2017
Promised
31 Aug 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001052631 Aug 201731 Aug 2019—Space InfrastructureProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Liviano 2616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

2bhk · 4 units2BHK · 4 units3bhk · 4 units3BHK · 4 units
TypeCarpet areaUnits
2bhk59.65 sq m · 642 sq ft4
2BHK58.69 sq m · 632 sq ft4
3bhk81.84 sq m · 881 sq ft4
3BHK91.54 sq m · 985 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Liviano 2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure5%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises70%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL DONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)PIPELINE INSTALLED50%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingas per plan70%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 19 filings listed on MahaRERA's project page

Titles

Encumbrance

Form b

Form 1

Form 2

Registration certificate

Form 5s

Others

Layout plan

Building plan

Document library

  • Copy of the legal title reportSEARCH REPORT LIVIANO 2-1.pdf · uploaded 15 Aug 2017View
  • Copy of the legal title reportSALE DEED LIVIANO 2-1.pdf · uploaded 15 Aug 2017View
  • Details of encumbrancesencumbrance cert Liviano 2.pdf · uploaded 15 Aug 2017View
  • Copy of Layout Approval (in case of layout)Liviano 2 map.pdf · uploaded 15 Aug 2017View
  • Proforma of Allotment letterpossession letter liviano 2.pdf · uploaded 15 Aug 2017Source
  • Declaration in FORM BFORM B LIVIANO 2.pdf · uploaded 15 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE LIVINEO 2.pdf · uploaded 15 Aug 2017View
  • Proforma of Allotment letterliviano 2 agreement to sell.pdf · uploaded 15 Aug 2017Source
  • Building Plan Approval (IOD)Liviano 2 map page 2.pdf · uploaded 15 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHI CERT LIVIANO 2.pdf · uploaded 15 Aug 2017View
  • Certificates of CA (Form 5)Liviano.pdf · uploaded 27 Apr 2019View
  • Architect’s Certificate on Completion of Project (Form 4)liviano.pdf · uploaded 9 Dec 2019View
  • Certificates of CA (Form 5)10526.pdf · uploaded 30 Jan 2020View

Promoter documents

  • Legal Title reportSEARCH REPORT LIVIANO 2-1.pdf · uploaded 15 Aug 2017View
  • Legal Title reportSALE DEED LIVIANO 2-1.pdf · uploaded 15 Aug 2017View
  • Declaration Form BFORM B LIVIANO 2.pdf · uploaded 15 Aug 2017View

Technical documents

  • Layout ApprovalLiviano 2 map.pdfView
  • Building Plan ApprovalLiviano 2 map page 2.pdfView

Proforma allotment letter

  • Proforma allotment letterpossession letter liviano 2.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

3PLOT NO 3

As published on MahaRERA's project page

PLOT NO 3

Boundaries

North
Shree Complex
South
9 Meters Wide Road
East
Plot No 1 And 2
West
Plot No 4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVision Associates—
EngineerSumit Pisalkar—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology