Kanchan Geet

Completed

Nagpur (M Corp.), Nagpur 440010 |Promoter: Raghukul Constructions Private Limited

Residential / Group HousingRERAP50500018334
23 Oct 2018Registered with MahaRERA
30 Dec 2024Promised completion
1Building
34Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Type A, Type B34 units in all
Land area for this project
1,338 sq m (14,400 sq ft)
Permissible built-up area
4,849 sq m (52,196 sq ft)
Sanctioned built-up area
4,580 sq m (49,296 sq ft)
Litigation declared by promoter
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13044, 79.07492
Kanchan Geet is at latitude 21.13044, longitude 79.07492.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
23 Oct 2018
Promised
30 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001833423 Oct 201830 Dec 2024—Raghukul Constructions Private LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Kanchan Geet1934

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

34 units registered

Type A · 17 unitsType B · 17 units
TypeCarpet areaUnits
Type A122.22 sq m · 1,316 sq ft17
Type B124.82 sq m · 1,344 sq ft17

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Kanchan Geet

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises65%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply000%
  • Sewerage (Chamber, Lines, Septic Tank , STP)000%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting000%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements000%
  • Electrical meter room, sub-station, receiving station000%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking000%
  • ELEVATORS002%
  • MECHANICAL STACKER PARKING000%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

1 document held by Deedo, 1 filing listed on MahaRERA's project page

Registration certificate

Proforma allotment letter

  • Proforma allotment letterAGREEMENT ALLOTMENT PROFARMA.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.)

Survey, CTS, gat or plot numbers

474474

As published on MahaRERA's project page

474

Source: registration certificates and MahaRERA's project page, as stated there.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology