Residential / Group HousingRERAP50500003259
5 Aug 2017Registered with MahaRERA
31 Mar 2019Promised completion
1Building
82Units registered
27MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK82 units in all
Land area for this project
2,402 sq m (25,857 sq ft)
Permissible built-up area
4,899 sq m (52,729 sq ft)
Sanctioned built-up area
4,899 sq m (52,729 sq ft)
Recreational open space
801 sq m (8,619 sq ft)
Address
Kh No 65/3 Cts No 512 512/2PIN 440015
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.10429, 79.07710
K-Square Apartments is at latitude 21.10429, longitude 79.07710.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2019

The latest completion date on record passed 7 years and 7 months ago.

Registered
5 Aug 2017
Promised
31 Mar 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000032595 Aug 201731 Mar 2019—Ankit ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
K- Square982

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

82 units registered

2BHK · 54 units3BHK · 28 units
TypeCarpet areaUnits
2BHK49.54 sq m · 533 sq ft54
3BHK63.12 sq m · 679 sq ft28

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000042
Open Space000042

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

K- Square

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyOC RECEIVED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC AND STP IS NOT PROVIDED100%
  • Storm Water DrainsAS PER PLAN100%
  • Landscaping & Tree PlantingAS PER PLAN100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntSOLAR WATER PIPING WORK DONE100%
  • Fire protection and fire safety requirementsAS PER PLAN100%
  • Electrical meter room, sub-station, receiving stationAS PER PLAN100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

25 documents held by Deedo, 29 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Allotment letters

Form 2s

Form 1s

Registration certificate

Form 5s

Form 4s

Others

Layout plan

Building plan

Document library

  • Copy of the legal title reportTITLE REPORT FINAL.pdf · uploaded 26 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT PLAN FINAL.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letterALLOTEMENT_LETTER.pdf · uploaded 26 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentBUILDING PLAN FINAL.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BFORM B.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letterAgreement_Blank_RERA_Draft.pdf · uploaded 26 Jul 2017View
  • Building Plan Approval (IOD)BUILDING PLAN FINAL.pdf · uploaded 26 Jul 2017View
  • Details of encumbrancesNO ENCUMBRANCE CERTIFICATE.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 28 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)k- square-min.pdf · uploaded 29 Jul 2017View
  • OtherK-SQUARE.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg certificate n ngr-ilovepdf-compressed.pdf · uploaded 13 Jan 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Reduce File.pdf · uploaded 10 Mar 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certificate DJ_ngp.pdf · uploaded 25 Apr 2018View
  • OtherDECTARATION of Ankit Constructions.pdf · uploaded 17 May 2018View
  • Certificates of CA (Form 5)FORM 5 ANKIT NAGPUR.pdf · uploaded 15 Oct 2018View
  • Certificates of Architect (Form 4)AC.pdf · uploaded 29 Jul 2019View
  • Certificates of Architect (Form 4)Emanet Designe1_compressed.pdf · uploaded 24 Dec 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)K-SQUARE.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)K sQAURE NAGPUR.pdf · uploaded 15 Aug 2021View
  • CERSAI detailsCERSAI_Search_Report_200238078586_For_Asset_Based_Search_24_05_2022_21_15_02_111.pdf · uploaded 24 May 2022View
  • CERSAI detailsCERSAI_Search_Report_200241645960_For_Asset_Based_Search_07_07_2022_15_06_07_414.pdf · uploaded 7 Jul 2022View

Promoter documents

  • Legal Title reportTITLE REPORT FINAL.pdf · uploaded 26 Jul 2017View
  • Declaration Form BFORM B.pdf · uploaded 26 Jul 2017View

Technical documents

  • Layout ApprovalLAYOUT PLAN FINAL.pdfView
  • Building Plan ApprovalBUILDING PLAN FINAL.pdfView

Other legal documents

  • OtherK-SQUARE.pdfView
  • OtherDECTARATION of Ankit Constructions.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTEMENT_LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

KH NO 65/3 CTS NO 512 512/2

As published on MahaRERA's project page

KH NO 65/3 CTS NO 512 512/2

Boundaries

North
Road
South
Road
East
Road
West
Kh No 65 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectEmanate Design—
EngineerMinal & Virendra Dehadrai—
OtherA K Civil Contractor—
OtherPradeep Singh—
OtherVinod Kahnawat—

Source: MahaRERA project page. Contact details are not shown.